Sustaining U.S. nuclear submarine design capabilities / / John F. Schank ... [et al.].

For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as...

Full description

Saved in:
Bibliographic Details
TeilnehmendeR:
Year of Publication:2007
Edition:1st ed.
Language:English
Physical Description:1 online resource (235 p.)
Notes:Description based upon print version of record.
Tags: Add Tag
No Tags, Be the first to tag this record!
Table of Contents:
  • Cover; Preface; Contents; Figures; Tables; Summary; Acknowledgments; Abbreviations; Chapter One - Introduction; Problem and Objectives; Analytical Approach; Organization of This Monograph; Chapter Two - The Submarine Design Process; Evolution of the Nuclear Submarine Force; Submarine Design Phases; Mix of Skills Required to Design a Nuclear Submarine; Chapter Three - Framing the Analysis; Methodology for Analyzing Workforce ManagementStrategies; Estimating the Future Demand for Submarine DesignResources; Alternative Demand Assumptions
  • Managing the Submarine Design Workforce Requires aLong-Range ViewModeling Workforce Management Strategies; Summary; Chapter Four - Effect of Different Options for Managing Design Resources; Analyzing the Base Case; Impact of Different Design Start Dates; Implications of a Longer Design Duration; Implications of Splitting the Workload Between EB andNGNN; Sensitivity to Workforce Input Variables; Qualitative Impacts of the "Do Nothing" Option; Options for Sustaining Submarine Design Resources2; Summary and Conclusions; Chapter Five - Critical Skills
  • How Many People in Each Skill Category Should BeMaintained?Factors to Consider When Deciding How Many of EachSkill Category to Sustain; Summary; Chapter Six - Suppliers; Introduction; Research Approach; Survey Results; Options to Address Vendor Risk; Observations; Chapter Seven - The Navy's Roles and Responsibilities in Submarine Design; Defining the Navy's Submarine-Related Roles; Program Authority Versus Technical Authority; Navy Design Resources; Summary; Chapter Eight - Effect of a Design Gap on the Navy's Technical Community; Effects of the Design Gap on NAVSEA
  • Effects of the Design Gap on the Naval Warfare CentersEffects of a Stretched Design Program on Navy TechnicalResources; Summary; Chapter Nine - Conclusions and Recommendations; Appendix A - Workforce Simulation Model; Appendix B - Survey Instrument for Electric Boat and Northrop Grumman Newport News; Appendix C - Survey Instrument Provided to Vendors; Appendix D - U.S. Navy's Technical Warrant Holders; Appendix E - Net Present Value Analysis; Bibliography