Sustaining U.S. nuclear submarine design capabilities / / John F. Schank ... [et al.].
For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as...
Saved in:
TeilnehmendeR: | |
---|---|
Year of Publication: | 2007 |
Edition: | 1st ed. |
Language: | English |
Physical Description: | 1 online resource (235 p.) |
Notes: | Description based upon print version of record. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Sustaining U.S. nuclear submarine design capabilities / John F. Schank ... [et al.].
Published: (2007.) -
Learning from experience. / Volume II, : Lessons from the U.S. Navy's Ohio, Seawolf, and Virginia submarine programs / / John F. Schank [and six others].
by: Schank, John F.
Published: (2011.) -
Learning from experience. / Volume I, : Lessons from the submarine programs of the United States, United Kingdom, and Australia / / John F. Schank [and four others].
by: Schank, John F.
Published: (2011.) -
Learning from experience. / Volume III, : Lessons from the United Kingdom's Astute submarine program / / John F. Schank [and five others].
by: Schank, John F.
Published: (2011.) -
Learning from Experience. / Volume IV, : Lessons from Australia's Collins submarine program / / John F. Schank [and six others].
by: Schank, John F.
Published: (2011.)