Sustaining U.S. nuclear submarine design capabilities / / John F. Schank ... [et al.].

For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as...

Full description

Saved in:
Bibliographic Details
TeilnehmendeR:
Year of Publication:2007
Edition:1st ed.
Language:English
Physical Description:1 online resource (235 p.)
Notes:Description based upon print version of record.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01260nam a2200313 a 4500
001 993628636904498
005 20200520144314.0
006 m o d |
007 cr -n---------
008 070329s2007 caua ob 000 0 eng
020 |a 1-281-18116-1 
020 |a 9786611181161 
020 |a 0-8330-4276-9 
035 |a (CKB)1000000000481456 
035 |a (EBL)322556 
035 |a (OCoLC)476120042 
035 |a (SSID)ssj0000254426 
035 |a (PQKBManifestationID)11229661 
035 |a (PQKBTitleCode)TC0000254426 
035 |a (PQKBWorkID)10208282 
035 |a (PQKB)10639209 
035 |a (Au-PeEL)EBL322556 
035 |a (CaPaEBR)ebr10225477 
035 |a (OCoLC)184844256 
035 |a (MiAaPQ)EBC322556 
035 |a (EXLCZ)991000000000481456 
040 |a MiAaPQ  |b eng  |e rda  |e pn  |c MiAaPQ  |d MiAaPQ 
041 |a eng 
043 |a n-us--- 
050 4 |a V858  |b .S87 2007 
082 0 |a 359.9/3  |2 22 
245 0 0 |a Sustaining U.S. nuclear submarine design capabilities /  |c John F. Schank ... [et al.]. 
250 |a 1st ed. 
260 |a Santa Monica, CA :  |b RAND Corp.,  |c 2007. 
300 |a 1 online resource (235 p.) 
336 |a text  |b txt 
337 |a computer  |b c 
338 |a online resource  |b cr 
500 |a Description based upon print version of record. 
505 0 |a Cover; Preface; Contents; Figures; Tables; Summary; Acknowledgments; Abbreviations; Chapter One - Introduction; Problem and Objectives; Analytical Approach; Organization of This Monograph; Chapter Two - The Submarine Design Process; Evolution of the Nuclear Submarine Force; Submarine Design Phases; Mix of Skills Required to Design a Nuclear Submarine; Chapter Three - Framing the Analysis; Methodology for Analyzing Workforce ManagementStrategies; Estimating the Future Demand for Submarine DesignResources; Alternative Demand Assumptions 
505 8 |a Managing the Submarine Design Workforce Requires aLong-Range ViewModeling Workforce Management Strategies; Summary; Chapter Four - Effect of Different Options for Managing Design Resources; Analyzing the Base Case; Impact of Different Design Start Dates; Implications of a Longer Design Duration; Implications of Splitting the Workload Between EB andNGNN; Sensitivity to Workforce Input Variables; Qualitative Impacts of the "Do Nothing" Option; Options for Sustaining Submarine Design Resources2; Summary and Conclusions; Chapter Five - Critical Skills 
505 8 |a How Many People in Each Skill Category Should BeMaintained?Factors to Consider When Deciding How Many of EachSkill Category to Sustain; Summary; Chapter Six - Suppliers; Introduction; Research Approach; Survey Results; Options to Address Vendor Risk; Observations; Chapter Seven - The Navy's Roles and Responsibilities in Submarine Design; Defining the Navy's Submarine-Related Roles; Program Authority Versus Technical Authority; Navy Design Resources; Summary; Chapter Eight - Effect of a Design Gap on the Navy's Technical Community; Effects of the Design Gap on NAVSEA 
505 8 |a Effects of the Design Gap on the Naval Warfare CentersEffects of a Stretched Design Program on Navy TechnicalResources; Summary; Chapter Nine - Conclusions and Recommendations; Appendix A - Workforce Simulation Model; Appendix B - Survey Instrument for Electric Boat and Northrop Grumman Newport News; Appendix C - Survey Instrument Provided to Vendors; Appendix D - U.S. Navy's Technical Warrant Holders; Appendix E - Net Present Value Analysis; Bibliography 
520 |a For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stret 
546 |a English 
504 |a Includes bibliographical references (p. 199-201). 
650 0 |a Nuclear submarines  |z United States  |x Design and construction  |y 21st century. 
650 0 |a Shipbuilding industry  |x Employees  |z United States  |y 21st century. 
650 0 |a Navy-yards and naval stations  |z United States. 
776 |z 0-8330-4160-6 
700 1 |a Schank, John F.  |q (John Frederic),  |d 1946- 
906 |a BOOK 
ADM |b 2024-08-02 22:03:14 Europe/Vienna  |f system  |c marc21  |a 2012-02-26 00:45:56 Europe/Vienna  |g false 
AVE |i DOAB Directory of Open Access Books  |P DOAB Directory of Open Access Books  |x https://eu02.alma.exlibrisgroup.com/view/uresolver/43ACC_OEAW/openurl?u.ignore_date_coverage=true&portfolio_pid=5350527680004498&Force_direct=true  |Z 5350527680004498  |b Available  |8 5350527680004498