Novel Technology and Whole-Process Management in Prefabricated Building : : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training.

Saved in:
Bibliographic Details
Superior document:Lecture Notes in Civil Engineering Series ; v.382
:
TeilnehmendeR:
Place / Publishing House:Singapore : : Springer Singapore Pte. Limited,, 2024.
©2024.
Year of Publication:2024
Edition:1st ed.
Language:English
Series:Lecture Notes in Civil Engineering Series
Physical Description:1 online resource (616 pages)
Tags: Add Tag
No Tags, Be the first to tag this record!
Table of Contents:
  • Intro
  • Preface
  • Committee Members
  • Contents
  • Load Calculation and Strength Analysis of Prefabricated Floating Dock
  • 1 Introduction
  • 2 Theoretical Basis
  • 2.1 Three-Dimensional Potential Flow Theory
  • 2.2 Finite Element Analysis Process
  • 3 Design Scheme for Floating Dock
  • 3.1 Design of the Main Structure of a Floating Dock
  • 4 Coordinate System of Floating Dock
  • 5 Calculation of Load and Stress Analysis for Floating Dock
  • 5.1 Hydrodynamic and Structural Model
  • 5.2 Motion Response and Analysis of Floating Dock
  • 5.3 Sectional Load Transfer Function
  • 5.4 Long-Term Forecast for Floating Dock
  • 5.5 Determine Design Wave Parameters
  • 6 Overall Strength Calculation and Result Analysis of Floating Dock
  • 6.1 Overall Strength Calculation of Floating Dock
  • 6.2 Configuration Improvement and Analysis
  • 7 Conclusion
  • References
  • Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure
  • 1 Introduction
  • 2 Working Principle and Mechanical Analysis of Assembled Overhang Structure
  • 3 3D Numerical Model of Assembled Road Base Structure
  • 3.1 Introduction of the Overhanging Structure Scheme
  • 3.2 Model Building
  • 3.3 Load Application
  • 4 Analysis of Results
  • 4.1 Slope Soil Displacement and Stress Analysis
  • 4.2 Soil Stability Analysis
  • 4.3 Stress and Displacement Analysis of the Overhanging Structure
  • 5 Conclusion
  • References
  • Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects
  • 1 Introduction
  • 2 Project Overviews
  • 3 Assessment of Bearing Capacity of Existing Bridges Before Reinforcement
  • 3.1 Technical Status of Bridges
  • 3.2 Calculation of Bearing Capacity Before Reinforcement (According to JTG B01-2014 Code)
  • 4 Research on Load Lifting and Reinforcement Scheme for Existing Bridges.
  • 4.1 Overall Principles and Objectives of Reinforcement
  • 4.2 Comparison and Selection of Reinforcement Methods
  • 4.3 Basic Principles of Bridge Deck Reinforcement for Existing Bridges Based on UHPC
  • 4.4 Design of Reinforcement Plan for Existing Bridges
  • 4.5 Effectiveness Evaluation of Reinforcement Schemes Based on Swiss Code (SIA-2052)
  • 4.6 Evaluation of Reinforcement Effect Based on 3D Solid Finite Element Method
  • 5 Conclusion
  • References
  • Research on Key Technologies for Translation and Dismantling in Tunnel of Large-Diameter TBM
  • 1 Introduction
  • 2 Dismantling Sequence of TBM
  • 3 Research on Key Technologies for the Main Machine
  • 3.1 Demolition Technology of Screw Conveyor in Tunnel
  • 3.2 Main Machine Move and Dismantle
  • 4 Research on Gantries Removal and Backing Technology
  • 4.1 Gantries Removal Special Tooling Design
  • 4.2 Gantries Move Backward
  • 5 Conclusion
  • References
  • Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tied Arch Bridges
  • 1 Introduction
  • 2 Dismantling Plan for Steel Pipe Arch Rib Assembly Support
  • 2.1 Original Plan
  • 2.2 Optimization Plan
  • 3 Structural Calculations
  • 3.1 Model and Construction Conditions
  • 3.2 Results
  • 4 Conclusion
  • References
  • Design Strategy and Application Research of Small Steel Structure Prefabricated Building
  • 1 Introduction
  • 1.1 Small Steel Structure Prefabricated Building
  • 1.2 Status of Small Prefabricated Residential Buildings
  • 2 Small Prefabricated Housing Design Strategies
  • 2.1 Adapt to the Site and Respect Nature
  • 2.2 Recycling and Ecological Protection
  • 2.3 Standard Space and Perfect Function
  • 2.4 High Security and Diverse Styles
  • 3 Application Case of Small Steel Structure Prefabricated House - "Four Seasons of Heshan"
  • 3.1 Build Quickly and Protect the Environment.
  • 3.2 Free Space and Diversified Decoration
  • 3.3 High Security and Perfect Functions
  • 3.4 Resource Circulation and Strong Sustainability
  • 4 Conclusion
  • References
  • Cost Comparison and Analysis of Prefabricated Frame Structures Under Different Assembly Rates
  • 1 Introduction
  • 2 Project Background
  • 2.1 Project Overview Description
  • 2.2 Basis for Determining Assembly Rate
  • 3 Assembly Plans with Different Assembly Rates
  • 3.1 Cast-In-Place Frame Structure Scheme
  • 3.2 Plan of Assembly Rate 50%
  • 3.3 Plan of Assembly Rate 65%
  • 3.4 Plan of Assembly Rate 90%
  • 4 Comparative Analysis of Frame Structure Costs Under Different Assembly Rates
  • 4.1 Scope of Cost Analysis
  • 4.2 Principles of Cost Analysis
  • 4.3 Cost Comparison Analysis
  • 4.4 Analysis of the Relationship Between Assembly Rate and Cost
  • 5 Conclusion and Suggestions
  • 5.1 Conclusion
  • 5.2 Suggestions
  • References
  • Research on Promotion Strategy of Prefabricated Buildings in Rural Areas of Chongqing
  • 1 Introduction
  • 1.1 Research Background
  • 1.2 Research Status
  • 2 Analysis on the Influencing Factors of the Popularization of Prefabricated Buildings in Rural Areas
  • 3 Establishment of Strategic Model for Promoting Prefabricated Buildings in Rural Areas of Chongqing
  • 4 Research Conclusions
  • References
  • Whole Process Management and Collaboration of Prefabricated Building Based on BIM
  • 1 Introduction
  • 2 Prefabricated Building Overview
  • 2.1 Definition of Prefabricated Buildings
  • 2.2 Characteristics of Prefabricated Buildings
  • 3 Application of BIM in the Construction Industry
  • 3.1 Definition and Principle of BIM
  • 3.2 Application Fields of BIM in the Construction Industry
  • 3.3 Combination and Application of Prefabricated Building and BIM
  • 3.4 Engineering Research and Analysis
  • 4 Data Collection and Prefabricated Buildings
  • 5 Conclusions.
  • References
  • Research on Prefabricated Building Wall Technology Based on SAR Theory
  • 1 Introduction
  • 2 The Guiding Effect of SAR Theory on Prefabricated Buildings in China
  • 3 The Guiding Role of SAR Theory in the Research of Prefabricated Building Wall Technology in China
  • 4 Research on Prefabricated Building Wall Technology Based on SAR Theory
  • 4.1 Technical Research on Prefabricated Building Wall Support System
  • 4.2 Research on the Technology of Prefabricated Building Exterior Wall Panels
  • 4.3 Research on the Diversity of Exterior Walls in Prefabricated Buildings
  • 5 Conclusion
  • References
  • Construction and Empirical Analysis of Influencing Factor Index of Prefabricated Construction Cost
  • 1 Research Background
  • 2 Analysis of Influencing Factors of Prefabricated Construction Cost
  • 3 Empirical Analysis of Influencing Factors of Prefabricated Construction Cost
  • 3.1 Questionnaire Design
  • 3.2 Questionnaire Distribution
  • 3.3 Questionnaire Collection and Sorting
  • 3.4 Reliability Test
  • 3.5 Content Validity Test
  • 3.6 Structural Validity Test
  • 3.7 Correlation Test
  • 4 Conclusion
  • References
  • Research on Whole-Process Cost Management of Prefabricated Building Based on BIM Technology
  • 1 Introduction
  • 2 BIM Technology for Prefabricated Buildings
  • 2.1 BIM Technology
  • 2.2 The Development Status of Prefabricated Buildings
  • 3 Analysis of Influencing Factors of Prefabricated Building Cost by BIM Technology
  • 4 Application of BIM Technology in the Whole Process Cost Management of Prefabricated Buildings
  • 4.1 Cost Control in the Planning and Design Stage of BIM Technology
  • 4.2 Cost Control in the Production and Transportation Stage of BIM Technology
  • 4.3 Cost Control in the Construction and Installation Phase of BIM Technology
  • 4.4 Cost Control in the Operation and Maintenance Stage of BIM Technology.
  • 4.5 Cost Control in the Operation and Maintenance Stage of BIM Technology
  • 5 Conclusions
  • References
  • Urban Development Potential Evaluation of Prefabricated Buildings Based on PCA-TOPSIS Model
  • 1 Introduction
  • 2 Design of Development Potential Evaluation Index of Prefabricated Buildings
  • 2.1 Design Principles of Index System
  • 2.2 Evaluation Index Design
  • 3 Evaluation Model of the Development Potential of Prefabricated Buildings
  • 3.1 Selection of Evaluation Methods
  • 3.2 Evaluation Steps of Weighted Principal Component TOPSIS Evaluation Model
  • 3.3 Evaluating the Results of Empirical Analysis of the Model
  • 4 Conclusions
  • References
  • Optimal Design and Application of Prefabricated Building Production Control in the Context of Intelligent Construction
  • 1 Introduction
  • 2 Analysis of the Status Quo and Application of Prefabricated Building Production
  • 2.1 Background and Significance of Intelligent Production of Prefabricated Buildings
  • 2.2 Key Process Flow of Prefabricated Building Production
  • 3 Intelligent Production Design of Prefabricated Building Based on Digital Technology
  • 3.1 Industrial Internet of Things Technology Design for the Digital Workshop of Prefabricated Buildings
  • 3.2 Construction of Intelligent Production Line Data Acquisition and Monitoring and Control Platform
  • 4 Virtual Simulation of Prefabricated Building Intelligent Production Workshop
  • Taking PC Components as an Example
  • 4.1 PC Component Intelligent Production Model Establishment
  • 4.2 Design and Optimization of Prefabricated Building Intelligent Production Line
  • 4.3 Case Analysis of Intelligent Production of PC Components Based on Simulation Platform
  • 5 Conclusion and Prospect
  • References
  • Prefabricated Building Model Construction Using Artificial Intelligence Algorithms
  • 1 Introduction.
  • 2 Discussion on Prefabricated Building Models Based on Artificial Intelligence Algorithms.