Novel Technology and Whole-Process Management in Prefabricated Building : : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training.
Saved in:
Superior document: | Lecture Notes in Civil Engineering Series ; v.382 |
---|---|
: | |
TeilnehmendeR: | |
Place / Publishing House: | Singapore : : Springer Singapore Pte. Limited,, 2024. ©2024. |
Year of Publication: | 2024 |
Edition: | 1st ed. |
Language: | English |
Series: | Lecture Notes in Civil Engineering Series
|
Physical Description: | 1 online resource (616 pages) |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
993685571004498 |
---|---|
ctrlnum |
(MiAaPQ)EBC31554462 (Au-PeEL)EBL31554462 (CKB)33449918200041 (EXLCZ)9933449918200041 |
collection |
bib_alma |
record_format |
marc |
spelling |
Xiang, Ping. Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. 1st ed. Singapore : Springer Singapore Pte. Limited, 2024. ©2024. 1 online resource (616 pages) text txt rdacontent computer c rdamedia online resource cr rdacarrier Lecture Notes in Civil Engineering Series ; v.382 Intro -- Preface -- Committee Members -- Contents -- Load Calculation and Strength Analysis of Prefabricated Floating Dock -- 1 Introduction -- 2 Theoretical Basis -- 2.1 Three-Dimensional Potential Flow Theory -- 2.2 Finite Element Analysis Process -- 3 Design Scheme for Floating Dock -- 3.1 Design of the Main Structure of a Floating Dock -- 4 Coordinate System of Floating Dock -- 5 Calculation of Load and Stress Analysis for Floating Dock -- 5.1 Hydrodynamic and Structural Model -- 5.2 Motion Response and Analysis of Floating Dock -- 5.3 Sectional Load Transfer Function -- 5.4 Long-Term Forecast for Floating Dock -- 5.5 Determine Design Wave Parameters -- 6 Overall Strength Calculation and Result Analysis of Floating Dock -- 6.1 Overall Strength Calculation of Floating Dock -- 6.2 Configuration Improvement and Analysis -- 7 Conclusion -- References -- Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure -- 1 Introduction -- 2 Working Principle and Mechanical Analysis of Assembled Overhang Structure -- 3 3D Numerical Model of Assembled Road Base Structure -- 3.1 Introduction of the Overhanging Structure Scheme -- 3.2 Model Building -- 3.3 Load Application -- 4 Analysis of Results -- 4.1 Slope Soil Displacement and Stress Analysis -- 4.2 Soil Stability Analysis -- 4.3 Stress and Displacement Analysis of the Overhanging Structure -- 5 Conclusion -- References -- Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects -- 1 Introduction -- 2 Project Overviews -- 3 Assessment of Bearing Capacity of Existing Bridges Before Reinforcement -- 3.1 Technical Status of Bridges -- 3.2 Calculation of Bearing Capacity Before Reinforcement (According to JTG B01-2014 Code) -- 4 Research on Load Lifting and Reinforcement Scheme for Existing Bridges. 4.1 Overall Principles and Objectives of Reinforcement -- 4.2 Comparison and Selection of Reinforcement Methods -- 4.3 Basic Principles of Bridge Deck Reinforcement for Existing Bridges Based on UHPC -- 4.4 Design of Reinforcement Plan for Existing Bridges -- 4.5 Effectiveness Evaluation of Reinforcement Schemes Based on Swiss Code (SIA-2052) -- 4.6 Evaluation of Reinforcement Effect Based on 3D Solid Finite Element Method -- 5 Conclusion -- References -- Research on Key Technologies for Translation and Dismantling in Tunnel of Large-Diameter TBM -- 1 Introduction -- 2 Dismantling Sequence of TBM -- 3 Research on Key Technologies for the Main Machine -- 3.1 Demolition Technology of Screw Conveyor in Tunnel -- 3.2 Main Machine Move and Dismantle -- 4 Research on Gantries Removal and Backing Technology -- 4.1 Gantries Removal Special Tooling Design -- 4.2 Gantries Move Backward -- 5 Conclusion -- References -- Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tied Arch Bridges -- 1 Introduction -- 2 Dismantling Plan for Steel Pipe Arch Rib Assembly Support -- 2.1 Original Plan -- 2.2 Optimization Plan -- 3 Structural Calculations -- 3.1 Model and Construction Conditions -- 3.2 Results -- 4 Conclusion -- References -- Design Strategy and Application Research of Small Steel Structure Prefabricated Building -- 1 Introduction -- 1.1 Small Steel Structure Prefabricated Building -- 1.2 Status of Small Prefabricated Residential Buildings -- 2 Small Prefabricated Housing Design Strategies -- 2.1 Adapt to the Site and Respect Nature -- 2.2 Recycling and Ecological Protection -- 2.3 Standard Space and Perfect Function -- 2.4 High Security and Diverse Styles -- 3 Application Case of Small Steel Structure Prefabricated House - "Four Seasons of Heshan" -- 3.1 Build Quickly and Protect the Environment. 3.2 Free Space and Diversified Decoration -- 3.3 High Security and Perfect Functions -- 3.4 Resource Circulation and Strong Sustainability -- 4 Conclusion -- References -- Cost Comparison and Analysis of Prefabricated Frame Structures Under Different Assembly Rates -- 1 Introduction -- 2 Project Background -- 2.1 Project Overview Description -- 2.2 Basis for Determining Assembly Rate -- 3 Assembly Plans with Different Assembly Rates -- 3.1 Cast-In-Place Frame Structure Scheme -- 3.2 Plan of Assembly Rate 50% -- 3.3 Plan of Assembly Rate 65% -- 3.4 Plan of Assembly Rate 90% -- 4 Comparative Analysis of Frame Structure Costs Under Different Assembly Rates -- 4.1 Scope of Cost Analysis -- 4.2 Principles of Cost Analysis -- 4.3 Cost Comparison Analysis -- 4.4 Analysis of the Relationship Between Assembly Rate and Cost -- 5 Conclusion and Suggestions -- 5.1 Conclusion -- 5.2 Suggestions -- References -- Research on Promotion Strategy of Prefabricated Buildings in Rural Areas of Chongqing -- 1 Introduction -- 1.1 Research Background -- 1.2 Research Status -- 2 Analysis on the Influencing Factors of the Popularization of Prefabricated Buildings in Rural Areas -- 3 Establishment of Strategic Model for Promoting Prefabricated Buildings in Rural Areas of Chongqing -- 4 Research Conclusions -- References -- Whole Process Management and Collaboration of Prefabricated Building Based on BIM -- 1 Introduction -- 2 Prefabricated Building Overview -- 2.1 Definition of Prefabricated Buildings -- 2.2 Characteristics of Prefabricated Buildings -- 3 Application of BIM in the Construction Industry -- 3.1 Definition and Principle of BIM -- 3.2 Application Fields of BIM in the Construction Industry -- 3.3 Combination and Application of Prefabricated Building and BIM -- 3.4 Engineering Research and Analysis -- 4 Data Collection and Prefabricated Buildings -- 5 Conclusions. References -- Research on Prefabricated Building Wall Technology Based on SAR Theory -- 1 Introduction -- 2 The Guiding Effect of SAR Theory on Prefabricated Buildings in China -- 3 The Guiding Role of SAR Theory in the Research of Prefabricated Building Wall Technology in China -- 4 Research on Prefabricated Building Wall Technology Based on SAR Theory -- 4.1 Technical Research on Prefabricated Building Wall Support System -- 4.2 Research on the Technology of Prefabricated Building Exterior Wall Panels -- 4.3 Research on the Diversity of Exterior Walls in Prefabricated Buildings -- 5 Conclusion -- References -- Construction and Empirical Analysis of Influencing Factor Index of Prefabricated Construction Cost -- 1 Research Background -- 2 Analysis of Influencing Factors of Prefabricated Construction Cost -- 3 Empirical Analysis of Influencing Factors of Prefabricated Construction Cost -- 3.1 Questionnaire Design -- 3.2 Questionnaire Distribution -- 3.3 Questionnaire Collection and Sorting -- 3.4 Reliability Test -- 3.5 Content Validity Test -- 3.6 Structural Validity Test -- 3.7 Correlation Test -- 4 Conclusion -- References -- Research on Whole-Process Cost Management of Prefabricated Building Based on BIM Technology -- 1 Introduction -- 2 BIM Technology for Prefabricated Buildings -- 2.1 BIM Technology -- 2.2 The Development Status of Prefabricated Buildings -- 3 Analysis of Influencing Factors of Prefabricated Building Cost by BIM Technology -- 4 Application of BIM Technology in the Whole Process Cost Management of Prefabricated Buildings -- 4.1 Cost Control in the Planning and Design Stage of BIM Technology -- 4.2 Cost Control in the Production and Transportation Stage of BIM Technology -- 4.3 Cost Control in the Construction and Installation Phase of BIM Technology -- 4.4 Cost Control in the Operation and Maintenance Stage of BIM Technology. 4.5 Cost Control in the Operation and Maintenance Stage of BIM Technology -- 5 Conclusions -- References -- Urban Development Potential Evaluation of Prefabricated Buildings Based on PCA-TOPSIS Model -- 1 Introduction -- 2 Design of Development Potential Evaluation Index of Prefabricated Buildings -- 2.1 Design Principles of Index System -- 2.2 Evaluation Index Design -- 3 Evaluation Model of the Development Potential of Prefabricated Buildings -- 3.1 Selection of Evaluation Methods -- 3.2 Evaluation Steps of Weighted Principal Component TOPSIS Evaluation Model -- 3.3 Evaluating the Results of Empirical Analysis of the Model -- 4 Conclusions -- References -- Optimal Design and Application of Prefabricated Building Production Control in the Context of Intelligent Construction -- 1 Introduction -- 2 Analysis of the Status Quo and Application of Prefabricated Building Production -- 2.1 Background and Significance of Intelligent Production of Prefabricated Buildings -- 2.2 Key Process Flow of Prefabricated Building Production -- 3 Intelligent Production Design of Prefabricated Building Based on Digital Technology -- 3.1 Industrial Internet of Things Technology Design for the Digital Workshop of Prefabricated Buildings -- 3.2 Construction of Intelligent Production Line Data Acquisition and Monitoring and Control Platform -- 4 Virtual Simulation of Prefabricated Building Intelligent Production Workshop -- Taking PC Components as an Example -- 4.1 PC Component Intelligent Production Model Establishment -- 4.2 Design and Optimization of Prefabricated Building Intelligent Production Line -- 4.3 Case Analysis of Intelligent Production of PC Components Based on Simulation Platform -- 5 Conclusion and Prospect -- References -- Prefabricated Building Model Construction Using Artificial Intelligence Algorithms -- 1 Introduction. 2 Discussion on Prefabricated Building Models Based on Artificial Intelligence Algorithms. Description based on publisher supplied metadata and other sources. Zuo, Liangdong. 981-9751-07-1 Lecture Notes in Civil Engineering Series |
language |
English |
format |
eBook |
author |
Xiang, Ping. |
spellingShingle |
Xiang, Ping. Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. Lecture Notes in Civil Engineering Series ; Intro -- Preface -- Committee Members -- Contents -- Load Calculation and Strength Analysis of Prefabricated Floating Dock -- 1 Introduction -- 2 Theoretical Basis -- 2.1 Three-Dimensional Potential Flow Theory -- 2.2 Finite Element Analysis Process -- 3 Design Scheme for Floating Dock -- 3.1 Design of the Main Structure of a Floating Dock -- 4 Coordinate System of Floating Dock -- 5 Calculation of Load and Stress Analysis for Floating Dock -- 5.1 Hydrodynamic and Structural Model -- 5.2 Motion Response and Analysis of Floating Dock -- 5.3 Sectional Load Transfer Function -- 5.4 Long-Term Forecast for Floating Dock -- 5.5 Determine Design Wave Parameters -- 6 Overall Strength Calculation and Result Analysis of Floating Dock -- 6.1 Overall Strength Calculation of Floating Dock -- 6.2 Configuration Improvement and Analysis -- 7 Conclusion -- References -- Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure -- 1 Introduction -- 2 Working Principle and Mechanical Analysis of Assembled Overhang Structure -- 3 3D Numerical Model of Assembled Road Base Structure -- 3.1 Introduction of the Overhanging Structure Scheme -- 3.2 Model Building -- 3.3 Load Application -- 4 Analysis of Results -- 4.1 Slope Soil Displacement and Stress Analysis -- 4.2 Soil Stability Analysis -- 4.3 Stress and Displacement Analysis of the Overhanging Structure -- 5 Conclusion -- References -- Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects -- 1 Introduction -- 2 Project Overviews -- 3 Assessment of Bearing Capacity of Existing Bridges Before Reinforcement -- 3.1 Technical Status of Bridges -- 3.2 Calculation of Bearing Capacity Before Reinforcement (According to JTG B01-2014 Code) -- 4 Research on Load Lifting and Reinforcement Scheme for Existing Bridges. 4.1 Overall Principles and Objectives of Reinforcement -- 4.2 Comparison and Selection of Reinforcement Methods -- 4.3 Basic Principles of Bridge Deck Reinforcement for Existing Bridges Based on UHPC -- 4.4 Design of Reinforcement Plan for Existing Bridges -- 4.5 Effectiveness Evaluation of Reinforcement Schemes Based on Swiss Code (SIA-2052) -- 4.6 Evaluation of Reinforcement Effect Based on 3D Solid Finite Element Method -- 5 Conclusion -- References -- Research on Key Technologies for Translation and Dismantling in Tunnel of Large-Diameter TBM -- 1 Introduction -- 2 Dismantling Sequence of TBM -- 3 Research on Key Technologies for the Main Machine -- 3.1 Demolition Technology of Screw Conveyor in Tunnel -- 3.2 Main Machine Move and Dismantle -- 4 Research on Gantries Removal and Backing Technology -- 4.1 Gantries Removal Special Tooling Design -- 4.2 Gantries Move Backward -- 5 Conclusion -- References -- Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tied Arch Bridges -- 1 Introduction -- 2 Dismantling Plan for Steel Pipe Arch Rib Assembly Support -- 2.1 Original Plan -- 2.2 Optimization Plan -- 3 Structural Calculations -- 3.1 Model and Construction Conditions -- 3.2 Results -- 4 Conclusion -- References -- Design Strategy and Application Research of Small Steel Structure Prefabricated Building -- 1 Introduction -- 1.1 Small Steel Structure Prefabricated Building -- 1.2 Status of Small Prefabricated Residential Buildings -- 2 Small Prefabricated Housing Design Strategies -- 2.1 Adapt to the Site and Respect Nature -- 2.2 Recycling and Ecological Protection -- 2.3 Standard Space and Perfect Function -- 2.4 High Security and Diverse Styles -- 3 Application Case of Small Steel Structure Prefabricated House - "Four Seasons of Heshan" -- 3.1 Build Quickly and Protect the Environment. 3.2 Free Space and Diversified Decoration -- 3.3 High Security and Perfect Functions -- 3.4 Resource Circulation and Strong Sustainability -- 4 Conclusion -- References -- Cost Comparison and Analysis of Prefabricated Frame Structures Under Different Assembly Rates -- 1 Introduction -- 2 Project Background -- 2.1 Project Overview Description -- 2.2 Basis for Determining Assembly Rate -- 3 Assembly Plans with Different Assembly Rates -- 3.1 Cast-In-Place Frame Structure Scheme -- 3.2 Plan of Assembly Rate 50% -- 3.3 Plan of Assembly Rate 65% -- 3.4 Plan of Assembly Rate 90% -- 4 Comparative Analysis of Frame Structure Costs Under Different Assembly Rates -- 4.1 Scope of Cost Analysis -- 4.2 Principles of Cost Analysis -- 4.3 Cost Comparison Analysis -- 4.4 Analysis of the Relationship Between Assembly Rate and Cost -- 5 Conclusion and Suggestions -- 5.1 Conclusion -- 5.2 Suggestions -- References -- Research on Promotion Strategy of Prefabricated Buildings in Rural Areas of Chongqing -- 1 Introduction -- 1.1 Research Background -- 1.2 Research Status -- 2 Analysis on the Influencing Factors of the Popularization of Prefabricated Buildings in Rural Areas -- 3 Establishment of Strategic Model for Promoting Prefabricated Buildings in Rural Areas of Chongqing -- 4 Research Conclusions -- References -- Whole Process Management and Collaboration of Prefabricated Building Based on BIM -- 1 Introduction -- 2 Prefabricated Building Overview -- 2.1 Definition of Prefabricated Buildings -- 2.2 Characteristics of Prefabricated Buildings -- 3 Application of BIM in the Construction Industry -- 3.1 Definition and Principle of BIM -- 3.2 Application Fields of BIM in the Construction Industry -- 3.3 Combination and Application of Prefabricated Building and BIM -- 3.4 Engineering Research and Analysis -- 4 Data Collection and Prefabricated Buildings -- 5 Conclusions. References -- Research on Prefabricated Building Wall Technology Based on SAR Theory -- 1 Introduction -- 2 The Guiding Effect of SAR Theory on Prefabricated Buildings in China -- 3 The Guiding Role of SAR Theory in the Research of Prefabricated Building Wall Technology in China -- 4 Research on Prefabricated Building Wall Technology Based on SAR Theory -- 4.1 Technical Research on Prefabricated Building Wall Support System -- 4.2 Research on the Technology of Prefabricated Building Exterior Wall Panels -- 4.3 Research on the Diversity of Exterior Walls in Prefabricated Buildings -- 5 Conclusion -- References -- Construction and Empirical Analysis of Influencing Factor Index of Prefabricated Construction Cost -- 1 Research Background -- 2 Analysis of Influencing Factors of Prefabricated Construction Cost -- 3 Empirical Analysis of Influencing Factors of Prefabricated Construction Cost -- 3.1 Questionnaire Design -- 3.2 Questionnaire Distribution -- 3.3 Questionnaire Collection and Sorting -- 3.4 Reliability Test -- 3.5 Content Validity Test -- 3.6 Structural Validity Test -- 3.7 Correlation Test -- 4 Conclusion -- References -- Research on Whole-Process Cost Management of Prefabricated Building Based on BIM Technology -- 1 Introduction -- 2 BIM Technology for Prefabricated Buildings -- 2.1 BIM Technology -- 2.2 The Development Status of Prefabricated Buildings -- 3 Analysis of Influencing Factors of Prefabricated Building Cost by BIM Technology -- 4 Application of BIM Technology in the Whole Process Cost Management of Prefabricated Buildings -- 4.1 Cost Control in the Planning and Design Stage of BIM Technology -- 4.2 Cost Control in the Production and Transportation Stage of BIM Technology -- 4.3 Cost Control in the Construction and Installation Phase of BIM Technology -- 4.4 Cost Control in the Operation and Maintenance Stage of BIM Technology. 4.5 Cost Control in the Operation and Maintenance Stage of BIM Technology -- 5 Conclusions -- References -- Urban Development Potential Evaluation of Prefabricated Buildings Based on PCA-TOPSIS Model -- 1 Introduction -- 2 Design of Development Potential Evaluation Index of Prefabricated Buildings -- 2.1 Design Principles of Index System -- 2.2 Evaluation Index Design -- 3 Evaluation Model of the Development Potential of Prefabricated Buildings -- 3.1 Selection of Evaluation Methods -- 3.2 Evaluation Steps of Weighted Principal Component TOPSIS Evaluation Model -- 3.3 Evaluating the Results of Empirical Analysis of the Model -- 4 Conclusions -- References -- Optimal Design and Application of Prefabricated Building Production Control in the Context of Intelligent Construction -- 1 Introduction -- 2 Analysis of the Status Quo and Application of Prefabricated Building Production -- 2.1 Background and Significance of Intelligent Production of Prefabricated Buildings -- 2.2 Key Process Flow of Prefabricated Building Production -- 3 Intelligent Production Design of Prefabricated Building Based on Digital Technology -- 3.1 Industrial Internet of Things Technology Design for the Digital Workshop of Prefabricated Buildings -- 3.2 Construction of Intelligent Production Line Data Acquisition and Monitoring and Control Platform -- 4 Virtual Simulation of Prefabricated Building Intelligent Production Workshop -- Taking PC Components as an Example -- 4.1 PC Component Intelligent Production Model Establishment -- 4.2 Design and Optimization of Prefabricated Building Intelligent Production Line -- 4.3 Case Analysis of Intelligent Production of PC Components Based on Simulation Platform -- 5 Conclusion and Prospect -- References -- Prefabricated Building Model Construction Using Artificial Intelligence Algorithms -- 1 Introduction. 2 Discussion on Prefabricated Building Models Based on Artificial Intelligence Algorithms. |
author_facet |
Xiang, Ping. Zuo, Liangdong. |
author_variant |
p x px |
author2 |
Zuo, Liangdong. |
author2_variant |
l z lz |
author2_role |
TeilnehmendeR |
author_sort |
Xiang, Ping. |
title |
Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. |
title_sub |
Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. |
title_full |
Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. |
title_fullStr |
Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. |
title_full_unstemmed |
Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. |
title_auth |
Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. |
title_new |
Novel Technology and Whole-Process Management in Prefabricated Building : |
title_sort |
novel technology and whole-process management in prefabricated building : conference proceedings of the 5th international prefabricated building seminar on frontier technology and talent training. |
series |
Lecture Notes in Civil Engineering Series ; |
series2 |
Lecture Notes in Civil Engineering Series ; |
publisher |
Springer Singapore Pte. Limited, |
publishDate |
2024 |
physical |
1 online resource (616 pages) |
edition |
1st ed. |
contents |
Intro -- Preface -- Committee Members -- Contents -- Load Calculation and Strength Analysis of Prefabricated Floating Dock -- 1 Introduction -- 2 Theoretical Basis -- 2.1 Three-Dimensional Potential Flow Theory -- 2.2 Finite Element Analysis Process -- 3 Design Scheme for Floating Dock -- 3.1 Design of the Main Structure of a Floating Dock -- 4 Coordinate System of Floating Dock -- 5 Calculation of Load and Stress Analysis for Floating Dock -- 5.1 Hydrodynamic and Structural Model -- 5.2 Motion Response and Analysis of Floating Dock -- 5.3 Sectional Load Transfer Function -- 5.4 Long-Term Forecast for Floating Dock -- 5.5 Determine Design Wave Parameters -- 6 Overall Strength Calculation and Result Analysis of Floating Dock -- 6.1 Overall Strength Calculation of Floating Dock -- 6.2 Configuration Improvement and Analysis -- 7 Conclusion -- References -- Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure -- 1 Introduction -- 2 Working Principle and Mechanical Analysis of Assembled Overhang Structure -- 3 3D Numerical Model of Assembled Road Base Structure -- 3.1 Introduction of the Overhanging Structure Scheme -- 3.2 Model Building -- 3.3 Load Application -- 4 Analysis of Results -- 4.1 Slope Soil Displacement and Stress Analysis -- 4.2 Soil Stability Analysis -- 4.3 Stress and Displacement Analysis of the Overhanging Structure -- 5 Conclusion -- References -- Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects -- 1 Introduction -- 2 Project Overviews -- 3 Assessment of Bearing Capacity of Existing Bridges Before Reinforcement -- 3.1 Technical Status of Bridges -- 3.2 Calculation of Bearing Capacity Before Reinforcement (According to JTG B01-2014 Code) -- 4 Research on Load Lifting and Reinforcement Scheme for Existing Bridges. 4.1 Overall Principles and Objectives of Reinforcement -- 4.2 Comparison and Selection of Reinforcement Methods -- 4.3 Basic Principles of Bridge Deck Reinforcement for Existing Bridges Based on UHPC -- 4.4 Design of Reinforcement Plan for Existing Bridges -- 4.5 Effectiveness Evaluation of Reinforcement Schemes Based on Swiss Code (SIA-2052) -- 4.6 Evaluation of Reinforcement Effect Based on 3D Solid Finite Element Method -- 5 Conclusion -- References -- Research on Key Technologies for Translation and Dismantling in Tunnel of Large-Diameter TBM -- 1 Introduction -- 2 Dismantling Sequence of TBM -- 3 Research on Key Technologies for the Main Machine -- 3.1 Demolition Technology of Screw Conveyor in Tunnel -- 3.2 Main Machine Move and Dismantle -- 4 Research on Gantries Removal and Backing Technology -- 4.1 Gantries Removal Special Tooling Design -- 4.2 Gantries Move Backward -- 5 Conclusion -- References -- Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tied Arch Bridges -- 1 Introduction -- 2 Dismantling Plan for Steel Pipe Arch Rib Assembly Support -- 2.1 Original Plan -- 2.2 Optimization Plan -- 3 Structural Calculations -- 3.1 Model and Construction Conditions -- 3.2 Results -- 4 Conclusion -- References -- Design Strategy and Application Research of Small Steel Structure Prefabricated Building -- 1 Introduction -- 1.1 Small Steel Structure Prefabricated Building -- 1.2 Status of Small Prefabricated Residential Buildings -- 2 Small Prefabricated Housing Design Strategies -- 2.1 Adapt to the Site and Respect Nature -- 2.2 Recycling and Ecological Protection -- 2.3 Standard Space and Perfect Function -- 2.4 High Security and Diverse Styles -- 3 Application Case of Small Steel Structure Prefabricated House - "Four Seasons of Heshan" -- 3.1 Build Quickly and Protect the Environment. 3.2 Free Space and Diversified Decoration -- 3.3 High Security and Perfect Functions -- 3.4 Resource Circulation and Strong Sustainability -- 4 Conclusion -- References -- Cost Comparison and Analysis of Prefabricated Frame Structures Under Different Assembly Rates -- 1 Introduction -- 2 Project Background -- 2.1 Project Overview Description -- 2.2 Basis for Determining Assembly Rate -- 3 Assembly Plans with Different Assembly Rates -- 3.1 Cast-In-Place Frame Structure Scheme -- 3.2 Plan of Assembly Rate 50% -- 3.3 Plan of Assembly Rate 65% -- 3.4 Plan of Assembly Rate 90% -- 4 Comparative Analysis of Frame Structure Costs Under Different Assembly Rates -- 4.1 Scope of Cost Analysis -- 4.2 Principles of Cost Analysis -- 4.3 Cost Comparison Analysis -- 4.4 Analysis of the Relationship Between Assembly Rate and Cost -- 5 Conclusion and Suggestions -- 5.1 Conclusion -- 5.2 Suggestions -- References -- Research on Promotion Strategy of Prefabricated Buildings in Rural Areas of Chongqing -- 1 Introduction -- 1.1 Research Background -- 1.2 Research Status -- 2 Analysis on the Influencing Factors of the Popularization of Prefabricated Buildings in Rural Areas -- 3 Establishment of Strategic Model for Promoting Prefabricated Buildings in Rural Areas of Chongqing -- 4 Research Conclusions -- References -- Whole Process Management and Collaboration of Prefabricated Building Based on BIM -- 1 Introduction -- 2 Prefabricated Building Overview -- 2.1 Definition of Prefabricated Buildings -- 2.2 Characteristics of Prefabricated Buildings -- 3 Application of BIM in the Construction Industry -- 3.1 Definition and Principle of BIM -- 3.2 Application Fields of BIM in the Construction Industry -- 3.3 Combination and Application of Prefabricated Building and BIM -- 3.4 Engineering Research and Analysis -- 4 Data Collection and Prefabricated Buildings -- 5 Conclusions. References -- Research on Prefabricated Building Wall Technology Based on SAR Theory -- 1 Introduction -- 2 The Guiding Effect of SAR Theory on Prefabricated Buildings in China -- 3 The Guiding Role of SAR Theory in the Research of Prefabricated Building Wall Technology in China -- 4 Research on Prefabricated Building Wall Technology Based on SAR Theory -- 4.1 Technical Research on Prefabricated Building Wall Support System -- 4.2 Research on the Technology of Prefabricated Building Exterior Wall Panels -- 4.3 Research on the Diversity of Exterior Walls in Prefabricated Buildings -- 5 Conclusion -- References -- Construction and Empirical Analysis of Influencing Factor Index of Prefabricated Construction Cost -- 1 Research Background -- 2 Analysis of Influencing Factors of Prefabricated Construction Cost -- 3 Empirical Analysis of Influencing Factors of Prefabricated Construction Cost -- 3.1 Questionnaire Design -- 3.2 Questionnaire Distribution -- 3.3 Questionnaire Collection and Sorting -- 3.4 Reliability Test -- 3.5 Content Validity Test -- 3.6 Structural Validity Test -- 3.7 Correlation Test -- 4 Conclusion -- References -- Research on Whole-Process Cost Management of Prefabricated Building Based on BIM Technology -- 1 Introduction -- 2 BIM Technology for Prefabricated Buildings -- 2.1 BIM Technology -- 2.2 The Development Status of Prefabricated Buildings -- 3 Analysis of Influencing Factors of Prefabricated Building Cost by BIM Technology -- 4 Application of BIM Technology in the Whole Process Cost Management of Prefabricated Buildings -- 4.1 Cost Control in the Planning and Design Stage of BIM Technology -- 4.2 Cost Control in the Production and Transportation Stage of BIM Technology -- 4.3 Cost Control in the Construction and Installation Phase of BIM Technology -- 4.4 Cost Control in the Operation and Maintenance Stage of BIM Technology. 4.5 Cost Control in the Operation and Maintenance Stage of BIM Technology -- 5 Conclusions -- References -- Urban Development Potential Evaluation of Prefabricated Buildings Based on PCA-TOPSIS Model -- 1 Introduction -- 2 Design of Development Potential Evaluation Index of Prefabricated Buildings -- 2.1 Design Principles of Index System -- 2.2 Evaluation Index Design -- 3 Evaluation Model of the Development Potential of Prefabricated Buildings -- 3.1 Selection of Evaluation Methods -- 3.2 Evaluation Steps of Weighted Principal Component TOPSIS Evaluation Model -- 3.3 Evaluating the Results of Empirical Analysis of the Model -- 4 Conclusions -- References -- Optimal Design and Application of Prefabricated Building Production Control in the Context of Intelligent Construction -- 1 Introduction -- 2 Analysis of the Status Quo and Application of Prefabricated Building Production -- 2.1 Background and Significance of Intelligent Production of Prefabricated Buildings -- 2.2 Key Process Flow of Prefabricated Building Production -- 3 Intelligent Production Design of Prefabricated Building Based on Digital Technology -- 3.1 Industrial Internet of Things Technology Design for the Digital Workshop of Prefabricated Buildings -- 3.2 Construction of Intelligent Production Line Data Acquisition and Monitoring and Control Platform -- 4 Virtual Simulation of Prefabricated Building Intelligent Production Workshop -- Taking PC Components as an Example -- 4.1 PC Component Intelligent Production Model Establishment -- 4.2 Design and Optimization of Prefabricated Building Intelligent Production Line -- 4.3 Case Analysis of Intelligent Production of PC Components Based on Simulation Platform -- 5 Conclusion and Prospect -- References -- Prefabricated Building Model Construction Using Artificial Intelligence Algorithms -- 1 Introduction. 2 Discussion on Prefabricated Building Models Based on Artificial Intelligence Algorithms. |
isbn |
981-9751-08-X 981-9751-07-1 |
callnumber-first |
T - Technology |
callnumber-subject |
TH - Building Construction |
callnumber-label |
TH1-9745 |
callnumber-sort |
TH 11 49745 |
illustrated |
Not Illustrated |
work_keys_str_mv |
AT xiangping noveltechnologyandwholeprocessmanagementinprefabricatedbuildingconferenceproceedingsofthe5thinternationalprefabricatedbuildingseminaronfrontiertechnologyandtalenttraining AT zuoliangdong noveltechnologyandwholeprocessmanagementinprefabricatedbuildingconferenceproceedingsofthe5thinternationalprefabricatedbuildingseminaronfrontiertechnologyandtalenttraining |
status_str |
n |
ids_txt_mv |
(MiAaPQ)EBC31554462 (Au-PeEL)EBL31554462 (CKB)33449918200041 (EXLCZ)9933449918200041 |
carrierType_str_mv |
cr |
hierarchy_parent_title |
Lecture Notes in Civil Engineering Series ; v.382 |
is_hierarchy_title |
Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. |
container_title |
Lecture Notes in Civil Engineering Series ; v.382 |
author2_original_writing_str_mv |
noLinkedField |
_version_ |
1808403556829495296 |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>11510nam a22004573i 4500</leader><controlfield tag="001">993685571004498</controlfield><controlfield tag="005">20240729084506.0</controlfield><controlfield tag="006">m o d | </controlfield><controlfield tag="007">cr cnu||||||||</controlfield><controlfield tag="008">240729s2024 xx o ||||0 eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">981-9751-08-X</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(MiAaPQ)EBC31554462</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(Au-PeEL)EBL31554462</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(CKB)33449918200041</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(EXLCZ)9933449918200041</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">MiAaPQ</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="e">pn</subfield><subfield code="c">MiAaPQ</subfield><subfield code="d">MiAaPQ</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TH1-9745</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Xiang, Ping.</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Novel Technology and Whole-Process Management in Prefabricated Building :</subfield><subfield code="b">Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training.</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1st ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Singapore :</subfield><subfield code="b">Springer Singapore Pte. Limited,</subfield><subfield code="c">2024.</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">©2024.</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (616 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="1" ind2=" "><subfield code="a">Lecture Notes in Civil Engineering Series ;</subfield><subfield code="v">v.382</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">Intro -- Preface -- Committee Members -- Contents -- Load Calculation and Strength Analysis of Prefabricated Floating Dock -- 1 Introduction -- 2 Theoretical Basis -- 2.1 Three-Dimensional Potential Flow Theory -- 2.2 Finite Element Analysis Process -- 3 Design Scheme for Floating Dock -- 3.1 Design of the Main Structure of a Floating Dock -- 4 Coordinate System of Floating Dock -- 5 Calculation of Load and Stress Analysis for Floating Dock -- 5.1 Hydrodynamic and Structural Model -- 5.2 Motion Response and Analysis of Floating Dock -- 5.3 Sectional Load Transfer Function -- 5.4 Long-Term Forecast for Floating Dock -- 5.5 Determine Design Wave Parameters -- 6 Overall Strength Calculation and Result Analysis of Floating Dock -- 6.1 Overall Strength Calculation of Floating Dock -- 6.2 Configuration Improvement and Analysis -- 7 Conclusion -- References -- Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure -- 1 Introduction -- 2 Working Principle and Mechanical Analysis of Assembled Overhang Structure -- 3 3D Numerical Model of Assembled Road Base Structure -- 3.1 Introduction of the Overhanging Structure Scheme -- 3.2 Model Building -- 3.3 Load Application -- 4 Analysis of Results -- 4.1 Slope Soil Displacement and Stress Analysis -- 4.2 Soil Stability Analysis -- 4.3 Stress and Displacement Analysis of the Overhanging Structure -- 5 Conclusion -- References -- Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects -- 1 Introduction -- 2 Project Overviews -- 3 Assessment of Bearing Capacity of Existing Bridges Before Reinforcement -- 3.1 Technical Status of Bridges -- 3.2 Calculation of Bearing Capacity Before Reinforcement (According to JTG B01-2014 Code) -- 4 Research on Load Lifting and Reinforcement Scheme for Existing Bridges.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">4.1 Overall Principles and Objectives of Reinforcement -- 4.2 Comparison and Selection of Reinforcement Methods -- 4.3 Basic Principles of Bridge Deck Reinforcement for Existing Bridges Based on UHPC -- 4.4 Design of Reinforcement Plan for Existing Bridges -- 4.5 Effectiveness Evaluation of Reinforcement Schemes Based on Swiss Code (SIA-2052) -- 4.6 Evaluation of Reinforcement Effect Based on 3D Solid Finite Element Method -- 5 Conclusion -- References -- Research on Key Technologies for Translation and Dismantling in Tunnel of Large-Diameter TBM -- 1 Introduction -- 2 Dismantling Sequence of TBM -- 3 Research on Key Technologies for the Main Machine -- 3.1 Demolition Technology of Screw Conveyor in Tunnel -- 3.2 Main Machine Move and Dismantle -- 4 Research on Gantries Removal and Backing Technology -- 4.1 Gantries Removal Special Tooling Design -- 4.2 Gantries Move Backward -- 5 Conclusion -- References -- Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tied Arch Bridges -- 1 Introduction -- 2 Dismantling Plan for Steel Pipe Arch Rib Assembly Support -- 2.1 Original Plan -- 2.2 Optimization Plan -- 3 Structural Calculations -- 3.1 Model and Construction Conditions -- 3.2 Results -- 4 Conclusion -- References -- Design Strategy and Application Research of Small Steel Structure Prefabricated Building -- 1 Introduction -- 1.1 Small Steel Structure Prefabricated Building -- 1.2 Status of Small Prefabricated Residential Buildings -- 2 Small Prefabricated Housing Design Strategies -- 2.1 Adapt to the Site and Respect Nature -- 2.2 Recycling and Ecological Protection -- 2.3 Standard Space and Perfect Function -- 2.4 High Security and Diverse Styles -- 3 Application Case of Small Steel Structure Prefabricated House - "Four Seasons of Heshan" -- 3.1 Build Quickly and Protect the Environment.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">3.2 Free Space and Diversified Decoration -- 3.3 High Security and Perfect Functions -- 3.4 Resource Circulation and Strong Sustainability -- 4 Conclusion -- References -- Cost Comparison and Analysis of Prefabricated Frame Structures Under Different Assembly Rates -- 1 Introduction -- 2 Project Background -- 2.1 Project Overview Description -- 2.2 Basis for Determining Assembly Rate -- 3 Assembly Plans with Different Assembly Rates -- 3.1 Cast-In-Place Frame Structure Scheme -- 3.2 Plan of Assembly Rate 50% -- 3.3 Plan of Assembly Rate 65% -- 3.4 Plan of Assembly Rate 90% -- 4 Comparative Analysis of Frame Structure Costs Under Different Assembly Rates -- 4.1 Scope of Cost Analysis -- 4.2 Principles of Cost Analysis -- 4.3 Cost Comparison Analysis -- 4.4 Analysis of the Relationship Between Assembly Rate and Cost -- 5 Conclusion and Suggestions -- 5.1 Conclusion -- 5.2 Suggestions -- References -- Research on Promotion Strategy of Prefabricated Buildings in Rural Areas of Chongqing -- 1 Introduction -- 1.1 Research Background -- 1.2 Research Status -- 2 Analysis on the Influencing Factors of the Popularization of Prefabricated Buildings in Rural Areas -- 3 Establishment of Strategic Model for Promoting Prefabricated Buildings in Rural Areas of Chongqing -- 4 Research Conclusions -- References -- Whole Process Management and Collaboration of Prefabricated Building Based on BIM -- 1 Introduction -- 2 Prefabricated Building Overview -- 2.1 Definition of Prefabricated Buildings -- 2.2 Characteristics of Prefabricated Buildings -- 3 Application of BIM in the Construction Industry -- 3.1 Definition and Principle of BIM -- 3.2 Application Fields of BIM in the Construction Industry -- 3.3 Combination and Application of Prefabricated Building and BIM -- 3.4 Engineering Research and Analysis -- 4 Data Collection and Prefabricated Buildings -- 5 Conclusions.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">References -- Research on Prefabricated Building Wall Technology Based on SAR Theory -- 1 Introduction -- 2 The Guiding Effect of SAR Theory on Prefabricated Buildings in China -- 3 The Guiding Role of SAR Theory in the Research of Prefabricated Building Wall Technology in China -- 4 Research on Prefabricated Building Wall Technology Based on SAR Theory -- 4.1 Technical Research on Prefabricated Building Wall Support System -- 4.2 Research on the Technology of Prefabricated Building Exterior Wall Panels -- 4.3 Research on the Diversity of Exterior Walls in Prefabricated Buildings -- 5 Conclusion -- References -- Construction and Empirical Analysis of Influencing Factor Index of Prefabricated Construction Cost -- 1 Research Background -- 2 Analysis of Influencing Factors of Prefabricated Construction Cost -- 3 Empirical Analysis of Influencing Factors of Prefabricated Construction Cost -- 3.1 Questionnaire Design -- 3.2 Questionnaire Distribution -- 3.3 Questionnaire Collection and Sorting -- 3.4 Reliability Test -- 3.5 Content Validity Test -- 3.6 Structural Validity Test -- 3.7 Correlation Test -- 4 Conclusion -- References -- Research on Whole-Process Cost Management of Prefabricated Building Based on BIM Technology -- 1 Introduction -- 2 BIM Technology for Prefabricated Buildings -- 2.1 BIM Technology -- 2.2 The Development Status of Prefabricated Buildings -- 3 Analysis of Influencing Factors of Prefabricated Building Cost by BIM Technology -- 4 Application of BIM Technology in the Whole Process Cost Management of Prefabricated Buildings -- 4.1 Cost Control in the Planning and Design Stage of BIM Technology -- 4.2 Cost Control in the Production and Transportation Stage of BIM Technology -- 4.3 Cost Control in the Construction and Installation Phase of BIM Technology -- 4.4 Cost Control in the Operation and Maintenance Stage of BIM Technology.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">4.5 Cost Control in the Operation and Maintenance Stage of BIM Technology -- 5 Conclusions -- References -- Urban Development Potential Evaluation of Prefabricated Buildings Based on PCA-TOPSIS Model -- 1 Introduction -- 2 Design of Development Potential Evaluation Index of Prefabricated Buildings -- 2.1 Design Principles of Index System -- 2.2 Evaluation Index Design -- 3 Evaluation Model of the Development Potential of Prefabricated Buildings -- 3.1 Selection of Evaluation Methods -- 3.2 Evaluation Steps of Weighted Principal Component TOPSIS Evaluation Model -- 3.3 Evaluating the Results of Empirical Analysis of the Model -- 4 Conclusions -- References -- Optimal Design and Application of Prefabricated Building Production Control in the Context of Intelligent Construction -- 1 Introduction -- 2 Analysis of the Status Quo and Application of Prefabricated Building Production -- 2.1 Background and Significance of Intelligent Production of Prefabricated Buildings -- 2.2 Key Process Flow of Prefabricated Building Production -- 3 Intelligent Production Design of Prefabricated Building Based on Digital Technology -- 3.1 Industrial Internet of Things Technology Design for the Digital Workshop of Prefabricated Buildings -- 3.2 Construction of Intelligent Production Line Data Acquisition and Monitoring and Control Platform -- 4 Virtual Simulation of Prefabricated Building Intelligent Production Workshop -- Taking PC Components as an Example -- 4.1 PC Component Intelligent Production Model Establishment -- 4.2 Design and Optimization of Prefabricated Building Intelligent Production Line -- 4.3 Case Analysis of Intelligent Production of PC Components Based on Simulation Platform -- 5 Conclusion and Prospect -- References -- Prefabricated Building Model Construction Using Artificial Intelligence Algorithms -- 1 Introduction.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">2 Discussion on Prefabricated Building Models Based on Artificial Intelligence Algorithms.</subfield></datafield><datafield tag="588" ind1=" " ind2=" "><subfield code="a">Description based on publisher supplied metadata and other sources.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Zuo, Liangdong.</subfield></datafield><datafield tag="776" ind1=" " ind2=" "><subfield code="z">981-9751-07-1</subfield></datafield><datafield tag="830" ind1=" " ind2="0"><subfield code="a">Lecture Notes in Civil Engineering Series</subfield></datafield><datafield tag="906" ind1=" " ind2=" "><subfield code="a">BOOK</subfield></datafield><datafield tag="ADM" ind1=" " ind2=" "><subfield code="b">2024-08-26 00:29:35 Europe/Vienna</subfield><subfield code="f">System</subfield><subfield code="c">marc21</subfield><subfield code="a">2024-07-29 14:02:39 Europe/Vienna</subfield><subfield code="g">false</subfield></datafield><datafield tag="AVE" ind1=" " ind2=" "><subfield code="i">DOAB Directory of Open Access Books</subfield><subfield code="P">DOAB Directory of Open Access Books</subfield><subfield code="x">https://eu02.alma.exlibrisgroup.com/view/uresolver/43ACC_OEAW/openurl?u.ignore_date_coverage=true&portfolio_pid=5357321110004498&Force_direct=true</subfield><subfield code="Z">5357321110004498</subfield><subfield code="b">Available</subfield><subfield code="8">5357321110004498</subfield></datafield></record></collection> |