Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings

The Life cycle cost (LCC) method makes it possible for the whole life performance of buildings and other structures to be optimized. The introduction of the idea of thinking in terms of a building life cycle resulted in the need to use appropriate tools and techniques for assessing and analyzing cos...

Full description

Saved in:
Bibliographic Details
Sonstige:
Year of Publication:2021
Language:English
Physical Description:1 electronic resource (220 p.)
Tags: Add Tag
No Tags, Be the first to tag this record!
id 993546254404498
ctrlnum (CKB)5400000000044916
(oapen)https://directory.doabooks.org/handle/20.500.12854/76921
(EXLCZ)995400000000044916
collection bib_alma
record_format marc
spelling Plebankiewicz, Edyta edt
Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
Basel, Switzerland MDPI - Multidisciplinary Digital Publishing Institute 2021
1 electronic resource (220 p.)
text txt rdacontent
computer c rdamedia
online resource cr rdacarrier
The Life cycle cost (LCC) method makes it possible for the whole life performance of buildings and other structures to be optimized. The introduction of the idea of thinking in terms of a building life cycle resulted in the need to use appropriate tools and techniques for assessing and analyzing costs throughout the life cycle of the building. Traditionally, estimates of LCC have been calculated based on historical analysis of data and have used deterministic models. The concepts of probability theory can also be applied to life cycle costing, treating the costs and timings as a stochastic process. If any subjectivity is introduced into the estimates, then the uncertainty cannot be handled using the probability theory alone. The theory of fuzzy sets is a valuable tool for handling such uncertainties. In this Special Issue, a collection of 11 contributions provide an updated overview of the approaches for estimating the life cycle cost of buildings.
English
Technology: general issues bicssc
dynamic analysis
steel frames
Tuned Mass Damper
optimization
drift ratio
sustainable construction industry
lifecycles
European Union Member States
complex evaluation
multiple criteria analysis
COPRAS and INVAR methods
success and image of a country
marketing
residential buildings
defects
intensity
reliability
technical wear
railway infrastructure
occurrences
socioeconomic impact
economic evaluation
CBA
life cycle
investment project
probability distribution
sensitivity analyses
risk assessment
tenement houses
damage
maintenance
fuzzy sets
Bayes conditional probability
substitution
operation and maintenance phase
cause–effect relationships
historical buildings
implementation factors
information and communication technology
life cycle costs
buildings
bidding decision
LCC criterion
price criterion
construction
statistical method
classification
probability of winning
risk identification
MCDM
critical risk factors
commercial and recreational complex building projects
3-0365-2295-6
3-0365-2296-4
Plebankiewicz, Edyta oth
language English
format eBook
author2 Plebankiewicz, Edyta
author_facet Plebankiewicz, Edyta
author2_variant e p ep
author2_role Sonstige
title Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
spellingShingle Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
title_full Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
title_fullStr Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
title_full_unstemmed Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
title_auth Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
title_new Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
title_sort probabilistic and fuzzy approaches for estimating the life cycle costs of buildings
publisher MDPI - Multidisciplinary Digital Publishing Institute
publishDate 2021
physical 1 electronic resource (220 p.)
isbn 3-0365-2295-6
3-0365-2296-4
illustrated Not Illustrated
work_keys_str_mv AT plebankiewiczedyta probabilisticandfuzzyapproachesforestimatingthelifecyclecostsofbuildings
status_str n
ids_txt_mv (CKB)5400000000044916
(oapen)https://directory.doabooks.org/handle/20.500.12854/76921
(EXLCZ)995400000000044916
carrierType_str_mv cr
is_hierarchy_title Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings
author2_original_writing_str_mv noLinkedField
_version_ 1796649071615672320
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>03736nam-a2200913z--4500</leader><controlfield tag="001">993546254404498</controlfield><controlfield tag="005">20231214133141.0</controlfield><controlfield tag="006">m o d </controlfield><controlfield tag="007">cr|mn|---annan</controlfield><controlfield tag="008">202201s2021 xx |||||o ||| 0|eng d</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(CKB)5400000000044916</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(oapen)https://directory.doabooks.org/handle/20.500.12854/76921</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(EXLCZ)995400000000044916</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Plebankiewicz, Edyta</subfield><subfield code="4">edt</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings</subfield></datafield><datafield tag="260" ind1=" " ind2=" "><subfield code="a">Basel, Switzerland</subfield><subfield code="b">MDPI - Multidisciplinary Digital Publishing Institute</subfield><subfield code="c">2021</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 electronic resource (220 p.)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The Life cycle cost (LCC) method makes it possible for the whole life performance of buildings and other structures to be optimized. The introduction of the idea of thinking in terms of a building life cycle resulted in the need to use appropriate tools and techniques for assessing and analyzing costs throughout the life cycle of the building. Traditionally, estimates of LCC have been calculated based on historical analysis of data and have used deterministic models. The concepts of probability theory can also be applied to life cycle costing, treating the costs and timings as a stochastic process. If any subjectivity is introduced into the estimates, then the uncertainty cannot be handled using the probability theory alone. The theory of fuzzy sets is a valuable tool for handling such uncertainties. In this Special Issue, a collection of 11 contributions provide an updated overview of the approaches for estimating the life cycle cost of buildings.</subfield></datafield><datafield tag="546" ind1=" " ind2=" "><subfield code="a">English</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Technology: general issues</subfield><subfield code="2">bicssc</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">dynamic analysis</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">steel frames</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Tuned Mass Damper</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">optimization</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">drift ratio</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">sustainable construction industry</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">lifecycles</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">European Union Member States</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">complex evaluation</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">multiple criteria analysis</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">COPRAS and INVAR methods</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">success and image of a country</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">marketing</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">residential buildings</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">defects</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">intensity</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">reliability</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">technical wear</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">railway infrastructure</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">occurrences</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">socioeconomic impact</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">economic evaluation</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">CBA</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">life cycle</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">investment project</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">probability distribution</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">sensitivity analyses</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">risk assessment</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">tenement houses</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">damage</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">maintenance</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">fuzzy sets</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Bayes conditional probability</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">substitution</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">operation and maintenance phase</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">cause–effect relationships</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">historical buildings</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">implementation factors</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">information and communication technology</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">life cycle costs</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">buildings</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">bidding decision</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">LCC criterion</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">price criterion</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">construction</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">statistical method</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">classification</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">probability of winning</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">risk identification</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">MCDM</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">critical risk factors</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">commercial and recreational complex building projects</subfield></datafield><datafield tag="776" ind1=" " ind2=" "><subfield code="z">3-0365-2295-6</subfield></datafield><datafield tag="776" ind1=" " ind2=" "><subfield code="z">3-0365-2296-4</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Plebankiewicz, Edyta</subfield><subfield code="4">oth</subfield></datafield><datafield tag="906" ind1=" " ind2=" "><subfield code="a">BOOK</subfield></datafield><datafield tag="ADM" ind1=" " ind2=" "><subfield code="b">2023-12-15 05:44:18 Europe/Vienna</subfield><subfield code="f">system</subfield><subfield code="c">marc21</subfield><subfield code="a">2022-04-04 09:22:53 Europe/Vienna</subfield><subfield code="g">false</subfield></datafield><datafield tag="AVE" ind1=" " ind2=" "><subfield code="i">DOAB Directory of Open Access Books</subfield><subfield code="P">DOAB Directory of Open Access Books</subfield><subfield code="x">https://eu02.alma.exlibrisgroup.com/view/uresolver/43ACC_OEAW/openurl?u.ignore_date_coverage=true&amp;portfolio_pid=5338168880004498&amp;Force_direct=true</subfield><subfield code="Z">5338168880004498</subfield><subfield code="b">Available</subfield><subfield code="8">5338168880004498</subfield></datafield></record></collection>