Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings

The Life cycle cost (LCC) method makes it possible for the whole life performance of buildings and other structures to be optimized. The introduction of the idea of thinking in terms of a building life cycle resulted in the need to use appropriate tools and techniques for assessing and analyzing cos...

Full description

Saved in:
Bibliographic Details
Sonstige:
Year of Publication:2021
Language:English
Physical Description:1 electronic resource (220 p.)
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 03736nam-a2200913z--4500
001 993546254404498
005 20231214133141.0
006 m o d
007 cr|mn|---annan
008 202201s2021 xx |||||o ||| 0|eng d
035 |a (CKB)5400000000044916 
035 |a (oapen)https://directory.doabooks.org/handle/20.500.12854/76921 
035 |a (EXLCZ)995400000000044916 
041 0 |a eng 
100 1 |a Plebankiewicz, Edyta  |4 edt 
245 1 0 |a Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings 
260 |a Basel, Switzerland  |b MDPI - Multidisciplinary Digital Publishing Institute  |c 2021 
300 |a 1 electronic resource (220 p.) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
520 |a The Life cycle cost (LCC) method makes it possible for the whole life performance of buildings and other structures to be optimized. The introduction of the idea of thinking in terms of a building life cycle resulted in the need to use appropriate tools and techniques for assessing and analyzing costs throughout the life cycle of the building. Traditionally, estimates of LCC have been calculated based on historical analysis of data and have used deterministic models. The concepts of probability theory can also be applied to life cycle costing, treating the costs and timings as a stochastic process. If any subjectivity is introduced into the estimates, then the uncertainty cannot be handled using the probability theory alone. The theory of fuzzy sets is a valuable tool for handling such uncertainties. In this Special Issue, a collection of 11 contributions provide an updated overview of the approaches for estimating the life cycle cost of buildings. 
546 |a English 
650 7 |a Technology: general issues  |2 bicssc 
653 |a dynamic analysis 
653 |a steel frames 
653 |a Tuned Mass Damper 
653 |a optimization 
653 |a drift ratio 
653 |a sustainable construction industry 
653 |a lifecycles 
653 |a European Union Member States 
653 |a complex evaluation 
653 |a multiple criteria analysis 
653 |a COPRAS and INVAR methods 
653 |a success and image of a country 
653 |a marketing 
653 |a residential buildings 
653 |a defects 
653 |a intensity 
653 |a reliability 
653 |a technical wear 
653 |a railway infrastructure 
653 |a occurrences 
653 |a socioeconomic impact 
653 |a economic evaluation 
653 |a CBA 
653 |a life cycle 
653 |a investment project 
653 |a probability distribution 
653 |a sensitivity analyses 
653 |a risk assessment 
653 |a tenement houses 
653 |a damage 
653 |a maintenance 
653 |a fuzzy sets 
653 |a Bayes conditional probability 
653 |a substitution 
653 |a operation and maintenance phase 
653 |a cause–effect relationships 
653 |a historical buildings 
653 |a implementation factors 
653 |a information and communication technology 
653 |a life cycle costs 
653 |a buildings 
653 |a bidding decision 
653 |a LCC criterion 
653 |a price criterion 
653 |a construction 
653 |a statistical method 
653 |a classification 
653 |a probability of winning 
653 |a risk identification 
653 |a MCDM 
653 |a critical risk factors 
653 |a commercial and recreational complex building projects 
776 |z 3-0365-2295-6 
776 |z 3-0365-2296-4 
700 1 |a Plebankiewicz, Edyta  |4 oth 
906 |a BOOK 
ADM |b 2023-12-15 05:44:18 Europe/Vienna  |f system  |c marc21  |a 2022-04-04 09:22:53 Europe/Vienna  |g false 
AVE |i DOAB Directory of Open Access Books  |P DOAB Directory of Open Access Books  |x https://eu02.alma.exlibrisgroup.com/view/uresolver/43ACC_OEAW/openurl?u.ignore_date_coverage=true&portfolio_pid=5338168880004498&Force_direct=true  |Z 5338168880004498  |b Available  |8 5338168880004498