S-BPM in the Wild : : Practical Value Creation.

Saved in:
Bibliographic Details
:
TeilnehmendeR:
Place / Publishing House:Cham : : Springer International Publishing AG,, 2015.
Ã2015.
Year of Publication:2015
Edition:1st ed.
Language:English
Online Access:
Physical Description:1 online resource (284 pages)
Tags: Add Tag
No Tags, Be the first to tag this record!
id 5006422803
ctrlnum (MiAaPQ)5006422803
(Au-PeEL)EBL6422803
(OCoLC)913775944
collection bib_alma
record_format marc
spelling Fleischmann, Albert.
S-BPM in the Wild : Practical Value Creation.
1st ed.
Cham : Springer International Publishing AG, 2015.
Ã2015.
1 online resource (284 pages)
text txt rdacontent
computer c rdamedia
online resource cr rdacarrier
Intro -- Preface -- Contents -- About the Authors -- 1 Introduction -- References -- Part IBusiness Operation Support -- 2 Subject-Oriented Business Processes Meet Strategic Management: Two Case Studies from the Manufacturing Industry -- Abstract -- 2.1 Motivation -- 2.2 Strategy-Oriented Business Process Modeling -- 2.2.1 Strategy Map -- 2.2.2 Business Process Model -- 2.2.3 Strategy Process Matrix -- 2.3 Case Study on Strategic Improvement of S-BPM Models -- 2.3.1 Initial Situation -- 2.3.2 As-Is Analysis -- 2.3.3 Optimization Approach -- 2.3.4 To-Be Modeling -- 2.3.5 Evaluation -- 2.4 Case Study on Strategic Monitoring of S-BPM Instances -- 2.4.1 Initial Situation and Approach -- 2.4.2 Architecture of the Monitoring System -- 2.4.3 Sample Calculation -- 2.4.4 Consequences -- 2.5 Summary -- References -- 3 Communication- and Value-Based Organizational Development at the University Clinic for Radiotherapy-Radiation Oncology -- Abstract -- 3.1 Introduction -- 3.2 Initial Situation -- 3.3 Project Implementation -- 3.3.1 Documentation of the Current Situation -- 3.3.2 Development of Model Variants -- 3.3.3 Analysis of the Consequences of Model Implementations -- 3.4 Going Live -- 3.5 Conclusive Summary -- References -- 4 Introducing S-BPM at an IT Service Providers -- Abstract -- 4.1 Project Background and Initial Situation -- 4.2 Course of the Project -- 4.2.1 Retrospective Overview -- 4.2.2 Preparation Phase -- 4.2.3 Initial Workshop -- 4.2.3.1 Workshop Preparation -- 4.2.3.2 Workshop Meeting and Results -- 4.2.4 Follow-ups -- 4.2.4.1 Analysis and Modeling -- 4.2.4.2 Validation and Optimization -- 4.2.4.3 Organizational Embedding -- 4.2.4.4 Implementation and Embedding in IT -- 4.2.4.5 Monitoring -- 4.3 Results -- 4.3.1 Goal Achievement in the Software Deployment Domain -- 4.3.2 Experience with S-BPM Methodology and Software -- Sec17.
References -- 5 A Service Hardware Application Case Fiducia -- Abstract -- 5.1 Background -- 5.1.1 History of PCs -- 5.1.2 History of the `Mainframe Mind Set' -- 5.1.3 The Change Brought by Globalization -- 5.1.4 Effects in the Companies -- 5.1.5 Departmental Expectations Are Changing -- 5.1.6 An Ideal Scenario -- 5.2 Needs at Fiducia -- 5.2.1 The Introduction of S-BPM -- 5.2.2 The Process Modelers -- 5.2.3 The IT Experts -- 5.3 A Sample Project: Managed Service Hardware (IT-Supported Process Introduction) -- 5.3.1 The Need to Introduce Managed Service Hardware -- 5.3.2 Managed Service Hardware as a Solution -- 5.3.3 Project Start: Initial Information-Gathering Process -- 5.3.4 Framework Conditions -- 5.3.5 First Rough Estimate: 150 Person-Days -- 5.3.6 Weaknesses Recognized -- 5.3.6.1 Lack of Detail -- 5.3.6.2 Redundancies in Partial Processes -- 5.3.6.3 Modelling Outcomes Are not Sufficiently Detailed -- 5.3.6.4 Low Level of Identification with the Outcome -- 5.3.6.5 Lack of Confidence in Making Mistakes -- 5.3.7 Project Restart from Scratch -- 5.3.8 Workshops with the Role-Holders -- 5.3.9 S-BPM Supports the Departments' Way of Thinking -- 5.3.10 Methodology Can also Be Used by the Department in Connection with a Tool -- 5.3.11 Full Identification with the Outcome -- 5.3.12 IT Application Could Be Completed at an Early Stage -- 5.4 Summary of Experiences Gained in This Project -- 5.4.1 Outcomes and Recognized Effects of the Actions Taken -- 5.4.2 Several Benefits Have Been Achieved by Introducing S-BPM -- 5.5 Closing Remarks -- 6 Designing an Agile Process Layer for Competitive Differentiation -- Abstract -- 6.1 The Challenge -- 6.2 The Solution -- 6.3 The Project Work -- 6.3.1 Agile Procedure in Scrum Rhythm -- 6.3.2 Participation-Acceptance Model (PAM) -- 6.3.3 Spectrum of Process Transformation -- 6.4 Summary and Outlook.
Part IIConsultancy and Education Support -- 7 Model as You Do: Engaging an S-BPM Vendor on Process Modelling in 3D Virtual Worlds -- Abstract -- 7.1 Metasonic Engages QUT June 2013 -- 7.2 Theoretical Inspirations from Readings Dec. 2013 to Jan. 2014 -- 7.2.1 Customer Involvement in BPM -- 7.2.2 Tacit Knowledge for Process Modelling -- 7.2.3 Situated Cognition via Virtual Worlds -- 7.2.4 Brisbane Design Workshop Jan. 2014 -- 7.3 Designing an Integrated 3D Virtual World S-BPM Approach Feb. 2014 -- 7.3.1 Activity Specification -- 7.3.2 Choice Specification -- 7.4 Evaluation at Metasonic Headquarters April 2014 -- 7.4.1 3D Virtual World Tool Evaluation Approach -- 7.4.2 Quantitative Results -- 7.4.3 Experiment Observations -- 7.4.4 Participant Comments -- 7.4.5 Games Engine Workshop -- 7.4.6 Metasonic Staff Reflections -- 7.4.7 Notable Program Changes -- 7.5 Conclusions -- 7.6 Implications -- Acknowledgments -- References -- 8 A Tangible Modeling Interface for Subject-Oriented Business Process Management -- Abstract -- 8.1 Introduction -- 8.2 Defining a Framework for Modeling: Design and Notation -- 8.3 Developing the S-BPM Buildbook -- 8.3.1 The First Version -- 8.3.2 The Second Version -- 8.4 Tangible-to-Digital Process Model Conversion -- 8.5 Case Studies -- 8.5.1 First Case Study: Novices in Modeling and the S-BPM Buildbook -- 8.5.2 Second Case Study: ``Pen and Paper'' Versus ``the Buildbook'' -- 8.6 Overall Conclusion -- References -- 9 A Reference Model for Maintenance Processes -- Abstract -- 9.1 Importance of Maintenance Processes -- 9.2 Importance of a Reference Model -- 9.3 Selecting S-BPM for Representation -- 9.4 The Maintenance Process Reference Model -- 9.4.1 Subject Behavior Diagram (SBD) of the Working System -- 9.4.2 SBD of the Operations Manager -- 9.4.3 SBD of the Maintenance Manager -- 9.4.4 SBD of the Maintenance Workers.
9.4.5 SBD of the Warehouse/Procurement -- 9.5 Outlook -- Appendix: Guideline for the Expert Interviews -- References -- 10 Role and Rights Management -- Abstract -- 10.1 Role and Rights Management -- 10.2 Motivation -- 10.3 What Role and Rights Management Does -- 10.3.1 Business Processes -- 10.3.2 Data Access -- 10.4 Current Problems and Possible Solutions -- 10.4.1 Redundancy -- 10.4.2 Wrong Models and Meta-Models -- 10.5 Requirements for an Organization Server---A Case Study -- 10.5.1 Knowledge Hierarchy -- 10.5.2 Relationships -- 10.5.3 Intelligent Subject Resolution -- 10.5.4 Multidimensional Organizations -- 10.6 The Organization Server C-Org -- 10.6.1 Implementation -- 10.6.2 Usage of C-Org -- 10.6.3 C-Org from the Viewpoint of S-BPM -- 10.6.4 Additional Features -- 10.7 Conclusion and Takeaway -- References -- 11 Embodying Business Rules in S-BPM -- Abstract -- 11.1 A Business Rules Primer -- 11.1.1 Introduction -- 11.1.2 Illustrative Example -- 11.1.3 Business Processes and Rules -- 11.2 S-BPM and Business Rules -- 11.2.1 Concept -- 11.2.2 Implementation -- 11.3 The Case of ABC Logistics -- 11.4 Results -- 11.4.1 Impact of Actions -- 11.4.2 Open Issues -- 11.4.3 Takeaway -- References -- 12 Agents Implementing Subject Behaviour: A Manufacturing Scenario -- Abstract -- 12.1 Introduction -- 12.2 Specifying a Production Process in S-BPM -- 12.3 Mapping Subjects to Agents -- 12.4 Developing Control Mechanisms for Subject Execution -- 12.5 Conclusion -- Acknowledgments -- Part IIITechnical Execution Support -- 13 An Abstract State Machine Interpreter for S-BPM -- Abstract -- 13.1 Setting the Stage -- 13.2 Conversation -- 13.3 Closing -- References -- 14 Structured Communication---Approaching S-BPM with Microsoft Technologies -- Abstract -- 14.1 Introduction and Motivation -- 14.2 Structured Communication -- 14.3 How to Execute S-BPM Models.
14.3.1 Workflow Technology -- 14.3.2 S-BPM as Windows Workflow Model -- 14.3.3 The First Prototype (PROMI) -- 14.3.4 Moving into the Cloud -- 14.4 Results -- 14.4.1 Impact of Actions -- 14.4.2 Open Issues -- 14.4.3 Takeaway -- References -- 15 ERP Integration in S-BPM Processes -- Abstract -- 15.1 Introduction -- 15.2 Project SUGGEST -- 15.3 Finding a Way of Communication -- 15.3.1 Talend ESB -- 15.3.2 JCo-API -- 15.3.3 OData -- 15.3.4 Web GUI -- 15.3.5 GUI for Windows -- 15.4 Practical Application -- 15.4.1 Prototype Talend ESB -- 15.4.2 Prototype JCo-API -- 15.4.3 Prototype OData -- 15.4.4 Prototype Web GUI -- 15.4.5 Prototype GUI for Windows -- 15.5 Results and Outlook -- Acknowledgments -- References -- Appendix -- Index.
Description based on publisher supplied metadata and other sources.
Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries.
Electronic books.
Schmidt, Werner.
Stary, Christian.
Print version: Fleischmann, Albert S-BPM in the Wild Cham : Springer International Publishing AG,c2015 9783319175416
ProQuest (Firm)
https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6422803 Click to View
language English
format eBook
author Fleischmann, Albert.
spellingShingle Fleischmann, Albert.
S-BPM in the Wild : Practical Value Creation.
Intro -- Preface -- Contents -- About the Authors -- 1 Introduction -- References -- Part IBusiness Operation Support -- 2 Subject-Oriented Business Processes Meet Strategic Management: Two Case Studies from the Manufacturing Industry -- Abstract -- 2.1 Motivation -- 2.2 Strategy-Oriented Business Process Modeling -- 2.2.1 Strategy Map -- 2.2.2 Business Process Model -- 2.2.3 Strategy Process Matrix -- 2.3 Case Study on Strategic Improvement of S-BPM Models -- 2.3.1 Initial Situation -- 2.3.2 As-Is Analysis -- 2.3.3 Optimization Approach -- 2.3.4 To-Be Modeling -- 2.3.5 Evaluation -- 2.4 Case Study on Strategic Monitoring of S-BPM Instances -- 2.4.1 Initial Situation and Approach -- 2.4.2 Architecture of the Monitoring System -- 2.4.3 Sample Calculation -- 2.4.4 Consequences -- 2.5 Summary -- References -- 3 Communication- and Value-Based Organizational Development at the University Clinic for Radiotherapy-Radiation Oncology -- Abstract -- 3.1 Introduction -- 3.2 Initial Situation -- 3.3 Project Implementation -- 3.3.1 Documentation of the Current Situation -- 3.3.2 Development of Model Variants -- 3.3.3 Analysis of the Consequences of Model Implementations -- 3.4 Going Live -- 3.5 Conclusive Summary -- References -- 4 Introducing S-BPM at an IT Service Providers -- Abstract -- 4.1 Project Background and Initial Situation -- 4.2 Course of the Project -- 4.2.1 Retrospective Overview -- 4.2.2 Preparation Phase -- 4.2.3 Initial Workshop -- 4.2.3.1 Workshop Preparation -- 4.2.3.2 Workshop Meeting and Results -- 4.2.4 Follow-ups -- 4.2.4.1 Analysis and Modeling -- 4.2.4.2 Validation and Optimization -- 4.2.4.3 Organizational Embedding -- 4.2.4.4 Implementation and Embedding in IT -- 4.2.4.5 Monitoring -- 4.3 Results -- 4.3.1 Goal Achievement in the Software Deployment Domain -- 4.3.2 Experience with S-BPM Methodology and Software -- Sec17.
References -- 5 A Service Hardware Application Case Fiducia -- Abstract -- 5.1 Background -- 5.1.1 History of PCs -- 5.1.2 History of the `Mainframe Mind Set' -- 5.1.3 The Change Brought by Globalization -- 5.1.4 Effects in the Companies -- 5.1.5 Departmental Expectations Are Changing -- 5.1.6 An Ideal Scenario -- 5.2 Needs at Fiducia -- 5.2.1 The Introduction of S-BPM -- 5.2.2 The Process Modelers -- 5.2.3 The IT Experts -- 5.3 A Sample Project: Managed Service Hardware (IT-Supported Process Introduction) -- 5.3.1 The Need to Introduce Managed Service Hardware -- 5.3.2 Managed Service Hardware as a Solution -- 5.3.3 Project Start: Initial Information-Gathering Process -- 5.3.4 Framework Conditions -- 5.3.5 First Rough Estimate: 150 Person-Days -- 5.3.6 Weaknesses Recognized -- 5.3.6.1 Lack of Detail -- 5.3.6.2 Redundancies in Partial Processes -- 5.3.6.3 Modelling Outcomes Are not Sufficiently Detailed -- 5.3.6.4 Low Level of Identification with the Outcome -- 5.3.6.5 Lack of Confidence in Making Mistakes -- 5.3.7 Project Restart from Scratch -- 5.3.8 Workshops with the Role-Holders -- 5.3.9 S-BPM Supports the Departments' Way of Thinking -- 5.3.10 Methodology Can also Be Used by the Department in Connection with a Tool -- 5.3.11 Full Identification with the Outcome -- 5.3.12 IT Application Could Be Completed at an Early Stage -- 5.4 Summary of Experiences Gained in This Project -- 5.4.1 Outcomes and Recognized Effects of the Actions Taken -- 5.4.2 Several Benefits Have Been Achieved by Introducing S-BPM -- 5.5 Closing Remarks -- 6 Designing an Agile Process Layer for Competitive Differentiation -- Abstract -- 6.1 The Challenge -- 6.2 The Solution -- 6.3 The Project Work -- 6.3.1 Agile Procedure in Scrum Rhythm -- 6.3.2 Participation-Acceptance Model (PAM) -- 6.3.3 Spectrum of Process Transformation -- 6.4 Summary and Outlook.
Part IIConsultancy and Education Support -- 7 Model as You Do: Engaging an S-BPM Vendor on Process Modelling in 3D Virtual Worlds -- Abstract -- 7.1 Metasonic Engages QUT June 2013 -- 7.2 Theoretical Inspirations from Readings Dec. 2013 to Jan. 2014 -- 7.2.1 Customer Involvement in BPM -- 7.2.2 Tacit Knowledge for Process Modelling -- 7.2.3 Situated Cognition via Virtual Worlds -- 7.2.4 Brisbane Design Workshop Jan. 2014 -- 7.3 Designing an Integrated 3D Virtual World S-BPM Approach Feb. 2014 -- 7.3.1 Activity Specification -- 7.3.2 Choice Specification -- 7.4 Evaluation at Metasonic Headquarters April 2014 -- 7.4.1 3D Virtual World Tool Evaluation Approach -- 7.4.2 Quantitative Results -- 7.4.3 Experiment Observations -- 7.4.4 Participant Comments -- 7.4.5 Games Engine Workshop -- 7.4.6 Metasonic Staff Reflections -- 7.4.7 Notable Program Changes -- 7.5 Conclusions -- 7.6 Implications -- Acknowledgments -- References -- 8 A Tangible Modeling Interface for Subject-Oriented Business Process Management -- Abstract -- 8.1 Introduction -- 8.2 Defining a Framework for Modeling: Design and Notation -- 8.3 Developing the S-BPM Buildbook -- 8.3.1 The First Version -- 8.3.2 The Second Version -- 8.4 Tangible-to-Digital Process Model Conversion -- 8.5 Case Studies -- 8.5.1 First Case Study: Novices in Modeling and the S-BPM Buildbook -- 8.5.2 Second Case Study: ``Pen and Paper'' Versus ``the Buildbook'' -- 8.6 Overall Conclusion -- References -- 9 A Reference Model for Maintenance Processes -- Abstract -- 9.1 Importance of Maintenance Processes -- 9.2 Importance of a Reference Model -- 9.3 Selecting S-BPM for Representation -- 9.4 The Maintenance Process Reference Model -- 9.4.1 Subject Behavior Diagram (SBD) of the Working System -- 9.4.2 SBD of the Operations Manager -- 9.4.3 SBD of the Maintenance Manager -- 9.4.4 SBD of the Maintenance Workers.
9.4.5 SBD of the Warehouse/Procurement -- 9.5 Outlook -- Appendix: Guideline for the Expert Interviews -- References -- 10 Role and Rights Management -- Abstract -- 10.1 Role and Rights Management -- 10.2 Motivation -- 10.3 What Role and Rights Management Does -- 10.3.1 Business Processes -- 10.3.2 Data Access -- 10.4 Current Problems and Possible Solutions -- 10.4.1 Redundancy -- 10.4.2 Wrong Models and Meta-Models -- 10.5 Requirements for an Organization Server---A Case Study -- 10.5.1 Knowledge Hierarchy -- 10.5.2 Relationships -- 10.5.3 Intelligent Subject Resolution -- 10.5.4 Multidimensional Organizations -- 10.6 The Organization Server C-Org -- 10.6.1 Implementation -- 10.6.2 Usage of C-Org -- 10.6.3 C-Org from the Viewpoint of S-BPM -- 10.6.4 Additional Features -- 10.7 Conclusion and Takeaway -- References -- 11 Embodying Business Rules in S-BPM -- Abstract -- 11.1 A Business Rules Primer -- 11.1.1 Introduction -- 11.1.2 Illustrative Example -- 11.1.3 Business Processes and Rules -- 11.2 S-BPM and Business Rules -- 11.2.1 Concept -- 11.2.2 Implementation -- 11.3 The Case of ABC Logistics -- 11.4 Results -- 11.4.1 Impact of Actions -- 11.4.2 Open Issues -- 11.4.3 Takeaway -- References -- 12 Agents Implementing Subject Behaviour: A Manufacturing Scenario -- Abstract -- 12.1 Introduction -- 12.2 Specifying a Production Process in S-BPM -- 12.3 Mapping Subjects to Agents -- 12.4 Developing Control Mechanisms for Subject Execution -- 12.5 Conclusion -- Acknowledgments -- Part IIITechnical Execution Support -- 13 An Abstract State Machine Interpreter for S-BPM -- Abstract -- 13.1 Setting the Stage -- 13.2 Conversation -- 13.3 Closing -- References -- 14 Structured Communication---Approaching S-BPM with Microsoft Technologies -- Abstract -- 14.1 Introduction and Motivation -- 14.2 Structured Communication -- 14.3 How to Execute S-BPM Models.
14.3.1 Workflow Technology -- 14.3.2 S-BPM as Windows Workflow Model -- 14.3.3 The First Prototype (PROMI) -- 14.3.4 Moving into the Cloud -- 14.4 Results -- 14.4.1 Impact of Actions -- 14.4.2 Open Issues -- 14.4.3 Takeaway -- References -- 15 ERP Integration in S-BPM Processes -- Abstract -- 15.1 Introduction -- 15.2 Project SUGGEST -- 15.3 Finding a Way of Communication -- 15.3.1 Talend ESB -- 15.3.2 JCo-API -- 15.3.3 OData -- 15.3.4 Web GUI -- 15.3.5 GUI for Windows -- 15.4 Practical Application -- 15.4.1 Prototype Talend ESB -- 15.4.2 Prototype JCo-API -- 15.4.3 Prototype OData -- 15.4.4 Prototype Web GUI -- 15.4.5 Prototype GUI for Windows -- 15.5 Results and Outlook -- Acknowledgments -- References -- Appendix -- Index.
author_facet Fleischmann, Albert.
Schmidt, Werner.
Stary, Christian.
author_variant a f af
author2 Schmidt, Werner.
Stary, Christian.
author2_variant w s ws
c s cs
author2_role TeilnehmendeR
TeilnehmendeR
author_sort Fleischmann, Albert.
title S-BPM in the Wild : Practical Value Creation.
title_sub Practical Value Creation.
title_full S-BPM in the Wild : Practical Value Creation.
title_fullStr S-BPM in the Wild : Practical Value Creation.
title_full_unstemmed S-BPM in the Wild : Practical Value Creation.
title_auth S-BPM in the Wild : Practical Value Creation.
title_new S-BPM in the Wild :
title_sort s-bpm in the wild : practical value creation.
publisher Springer International Publishing AG,
publishDate 2015
physical 1 online resource (284 pages)
edition 1st ed.
contents Intro -- Preface -- Contents -- About the Authors -- 1 Introduction -- References -- Part IBusiness Operation Support -- 2 Subject-Oriented Business Processes Meet Strategic Management: Two Case Studies from the Manufacturing Industry -- Abstract -- 2.1 Motivation -- 2.2 Strategy-Oriented Business Process Modeling -- 2.2.1 Strategy Map -- 2.2.2 Business Process Model -- 2.2.3 Strategy Process Matrix -- 2.3 Case Study on Strategic Improvement of S-BPM Models -- 2.3.1 Initial Situation -- 2.3.2 As-Is Analysis -- 2.3.3 Optimization Approach -- 2.3.4 To-Be Modeling -- 2.3.5 Evaluation -- 2.4 Case Study on Strategic Monitoring of S-BPM Instances -- 2.4.1 Initial Situation and Approach -- 2.4.2 Architecture of the Monitoring System -- 2.4.3 Sample Calculation -- 2.4.4 Consequences -- 2.5 Summary -- References -- 3 Communication- and Value-Based Organizational Development at the University Clinic for Radiotherapy-Radiation Oncology -- Abstract -- 3.1 Introduction -- 3.2 Initial Situation -- 3.3 Project Implementation -- 3.3.1 Documentation of the Current Situation -- 3.3.2 Development of Model Variants -- 3.3.3 Analysis of the Consequences of Model Implementations -- 3.4 Going Live -- 3.5 Conclusive Summary -- References -- 4 Introducing S-BPM at an IT Service Providers -- Abstract -- 4.1 Project Background and Initial Situation -- 4.2 Course of the Project -- 4.2.1 Retrospective Overview -- 4.2.2 Preparation Phase -- 4.2.3 Initial Workshop -- 4.2.3.1 Workshop Preparation -- 4.2.3.2 Workshop Meeting and Results -- 4.2.4 Follow-ups -- 4.2.4.1 Analysis and Modeling -- 4.2.4.2 Validation and Optimization -- 4.2.4.3 Organizational Embedding -- 4.2.4.4 Implementation and Embedding in IT -- 4.2.4.5 Monitoring -- 4.3 Results -- 4.3.1 Goal Achievement in the Software Deployment Domain -- 4.3.2 Experience with S-BPM Methodology and Software -- Sec17.
References -- 5 A Service Hardware Application Case Fiducia -- Abstract -- 5.1 Background -- 5.1.1 History of PCs -- 5.1.2 History of the `Mainframe Mind Set' -- 5.1.3 The Change Brought by Globalization -- 5.1.4 Effects in the Companies -- 5.1.5 Departmental Expectations Are Changing -- 5.1.6 An Ideal Scenario -- 5.2 Needs at Fiducia -- 5.2.1 The Introduction of S-BPM -- 5.2.2 The Process Modelers -- 5.2.3 The IT Experts -- 5.3 A Sample Project: Managed Service Hardware (IT-Supported Process Introduction) -- 5.3.1 The Need to Introduce Managed Service Hardware -- 5.3.2 Managed Service Hardware as a Solution -- 5.3.3 Project Start: Initial Information-Gathering Process -- 5.3.4 Framework Conditions -- 5.3.5 First Rough Estimate: 150 Person-Days -- 5.3.6 Weaknesses Recognized -- 5.3.6.1 Lack of Detail -- 5.3.6.2 Redundancies in Partial Processes -- 5.3.6.3 Modelling Outcomes Are not Sufficiently Detailed -- 5.3.6.4 Low Level of Identification with the Outcome -- 5.3.6.5 Lack of Confidence in Making Mistakes -- 5.3.7 Project Restart from Scratch -- 5.3.8 Workshops with the Role-Holders -- 5.3.9 S-BPM Supports the Departments' Way of Thinking -- 5.3.10 Methodology Can also Be Used by the Department in Connection with a Tool -- 5.3.11 Full Identification with the Outcome -- 5.3.12 IT Application Could Be Completed at an Early Stage -- 5.4 Summary of Experiences Gained in This Project -- 5.4.1 Outcomes and Recognized Effects of the Actions Taken -- 5.4.2 Several Benefits Have Been Achieved by Introducing S-BPM -- 5.5 Closing Remarks -- 6 Designing an Agile Process Layer for Competitive Differentiation -- Abstract -- 6.1 The Challenge -- 6.2 The Solution -- 6.3 The Project Work -- 6.3.1 Agile Procedure in Scrum Rhythm -- 6.3.2 Participation-Acceptance Model (PAM) -- 6.3.3 Spectrum of Process Transformation -- 6.4 Summary and Outlook.
Part IIConsultancy and Education Support -- 7 Model as You Do: Engaging an S-BPM Vendor on Process Modelling in 3D Virtual Worlds -- Abstract -- 7.1 Metasonic Engages QUT June 2013 -- 7.2 Theoretical Inspirations from Readings Dec. 2013 to Jan. 2014 -- 7.2.1 Customer Involvement in BPM -- 7.2.2 Tacit Knowledge for Process Modelling -- 7.2.3 Situated Cognition via Virtual Worlds -- 7.2.4 Brisbane Design Workshop Jan. 2014 -- 7.3 Designing an Integrated 3D Virtual World S-BPM Approach Feb. 2014 -- 7.3.1 Activity Specification -- 7.3.2 Choice Specification -- 7.4 Evaluation at Metasonic Headquarters April 2014 -- 7.4.1 3D Virtual World Tool Evaluation Approach -- 7.4.2 Quantitative Results -- 7.4.3 Experiment Observations -- 7.4.4 Participant Comments -- 7.4.5 Games Engine Workshop -- 7.4.6 Metasonic Staff Reflections -- 7.4.7 Notable Program Changes -- 7.5 Conclusions -- 7.6 Implications -- Acknowledgments -- References -- 8 A Tangible Modeling Interface for Subject-Oriented Business Process Management -- Abstract -- 8.1 Introduction -- 8.2 Defining a Framework for Modeling: Design and Notation -- 8.3 Developing the S-BPM Buildbook -- 8.3.1 The First Version -- 8.3.2 The Second Version -- 8.4 Tangible-to-Digital Process Model Conversion -- 8.5 Case Studies -- 8.5.1 First Case Study: Novices in Modeling and the S-BPM Buildbook -- 8.5.2 Second Case Study: ``Pen and Paper'' Versus ``the Buildbook'' -- 8.6 Overall Conclusion -- References -- 9 A Reference Model for Maintenance Processes -- Abstract -- 9.1 Importance of Maintenance Processes -- 9.2 Importance of a Reference Model -- 9.3 Selecting S-BPM for Representation -- 9.4 The Maintenance Process Reference Model -- 9.4.1 Subject Behavior Diagram (SBD) of the Working System -- 9.4.2 SBD of the Operations Manager -- 9.4.3 SBD of the Maintenance Manager -- 9.4.4 SBD of the Maintenance Workers.
9.4.5 SBD of the Warehouse/Procurement -- 9.5 Outlook -- Appendix: Guideline for the Expert Interviews -- References -- 10 Role and Rights Management -- Abstract -- 10.1 Role and Rights Management -- 10.2 Motivation -- 10.3 What Role and Rights Management Does -- 10.3.1 Business Processes -- 10.3.2 Data Access -- 10.4 Current Problems and Possible Solutions -- 10.4.1 Redundancy -- 10.4.2 Wrong Models and Meta-Models -- 10.5 Requirements for an Organization Server---A Case Study -- 10.5.1 Knowledge Hierarchy -- 10.5.2 Relationships -- 10.5.3 Intelligent Subject Resolution -- 10.5.4 Multidimensional Organizations -- 10.6 The Organization Server C-Org -- 10.6.1 Implementation -- 10.6.2 Usage of C-Org -- 10.6.3 C-Org from the Viewpoint of S-BPM -- 10.6.4 Additional Features -- 10.7 Conclusion and Takeaway -- References -- 11 Embodying Business Rules in S-BPM -- Abstract -- 11.1 A Business Rules Primer -- 11.1.1 Introduction -- 11.1.2 Illustrative Example -- 11.1.3 Business Processes and Rules -- 11.2 S-BPM and Business Rules -- 11.2.1 Concept -- 11.2.2 Implementation -- 11.3 The Case of ABC Logistics -- 11.4 Results -- 11.4.1 Impact of Actions -- 11.4.2 Open Issues -- 11.4.3 Takeaway -- References -- 12 Agents Implementing Subject Behaviour: A Manufacturing Scenario -- Abstract -- 12.1 Introduction -- 12.2 Specifying a Production Process in S-BPM -- 12.3 Mapping Subjects to Agents -- 12.4 Developing Control Mechanisms for Subject Execution -- 12.5 Conclusion -- Acknowledgments -- Part IIITechnical Execution Support -- 13 An Abstract State Machine Interpreter for S-BPM -- Abstract -- 13.1 Setting the Stage -- 13.2 Conversation -- 13.3 Closing -- References -- 14 Structured Communication---Approaching S-BPM with Microsoft Technologies -- Abstract -- 14.1 Introduction and Motivation -- 14.2 Structured Communication -- 14.3 How to Execute S-BPM Models.
14.3.1 Workflow Technology -- 14.3.2 S-BPM as Windows Workflow Model -- 14.3.3 The First Prototype (PROMI) -- 14.3.4 Moving into the Cloud -- 14.4 Results -- 14.4.1 Impact of Actions -- 14.4.2 Open Issues -- 14.4.3 Takeaway -- References -- 15 ERP Integration in S-BPM Processes -- Abstract -- 15.1 Introduction -- 15.2 Project SUGGEST -- 15.3 Finding a Way of Communication -- 15.3.1 Talend ESB -- 15.3.2 JCo-API -- 15.3.3 OData -- 15.3.4 Web GUI -- 15.3.5 GUI for Windows -- 15.4 Practical Application -- 15.4.1 Prototype Talend ESB -- 15.4.2 Prototype JCo-API -- 15.4.3 Prototype OData -- 15.4.4 Prototype Web GUI -- 15.4.5 Prototype GUI for Windows -- 15.5 Results and Outlook -- Acknowledgments -- References -- Appendix -- Index.
isbn 9783319175423
9783319175416
callnumber-first H - Social Science
callnumber-subject HD - Industries, Land Use, Labor
callnumber-label HD30
callnumber-sort HD 230.19 229
genre Electronic books.
genre_facet Electronic books.
url https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6422803
illustrated Not Illustrated
oclc_num 913775944
work_keys_str_mv AT fleischmannalbert sbpminthewildpracticalvaluecreation
AT schmidtwerner sbpminthewildpracticalvaluecreation
AT starychristian sbpminthewildpracticalvaluecreation
status_str n
ids_txt_mv (MiAaPQ)5006422803
(Au-PeEL)EBL6422803
(OCoLC)913775944
carrierType_str_mv cr
is_hierarchy_title S-BPM in the Wild : Practical Value Creation.
author2_original_writing_str_mv noLinkedField
noLinkedField
marc_error Info : Unimarc and ISO-8859-1 translations identical, choosing ISO-8859-1. --- [ 856 : z ]
_version_ 1792331059402113025
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>09800nam a22004453i 4500</leader><controlfield tag="001">5006422803</controlfield><controlfield tag="003">MiAaPQ</controlfield><controlfield tag="005">20240229073838.0</controlfield><controlfield tag="006">m o d | </controlfield><controlfield tag="007">cr cnu||||||||</controlfield><controlfield tag="008">240229s2015 xx o ||||0 eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783319175423</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">9783319175416</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(MiAaPQ)5006422803</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(Au-PeEL)EBL6422803</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)913775944</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">MiAaPQ</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="e">pn</subfield><subfield code="c">MiAaPQ</subfield><subfield code="d">MiAaPQ</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">HD30.19-.29</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Fleischmann, Albert.</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">S-BPM in the Wild :</subfield><subfield code="b">Practical Value Creation.</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1st ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Cham :</subfield><subfield code="b">Springer International Publishing AG,</subfield><subfield code="c">2015.</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">Ã2015.</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (284 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">Intro -- Preface -- Contents -- About the Authors -- 1 Introduction -- References -- Part IBusiness Operation Support -- 2 Subject-Oriented Business Processes Meet Strategic Management: Two Case Studies from the Manufacturing Industry -- Abstract -- 2.1 Motivation -- 2.2 Strategy-Oriented Business Process Modeling -- 2.2.1 Strategy Map -- 2.2.2 Business Process Model -- 2.2.3 Strategy Process Matrix -- 2.3 Case Study on Strategic Improvement of S-BPM Models -- 2.3.1 Initial Situation -- 2.3.2 As-Is Analysis -- 2.3.3 Optimization Approach -- 2.3.4 To-Be Modeling -- 2.3.5 Evaluation -- 2.4 Case Study on Strategic Monitoring of S-BPM Instances -- 2.4.1 Initial Situation and Approach -- 2.4.2 Architecture of the Monitoring System -- 2.4.3 Sample Calculation -- 2.4.4 Consequences -- 2.5 Summary -- References -- 3 Communication- and Value-Based Organizational Development at the University Clinic for Radiotherapy-Radiation Oncology -- Abstract -- 3.1 Introduction -- 3.2 Initial Situation -- 3.3 Project Implementation -- 3.3.1 Documentation of the Current Situation -- 3.3.2 Development of Model Variants -- 3.3.3 Analysis of the Consequences of Model Implementations -- 3.4 Going Live -- 3.5 Conclusive Summary -- References -- 4 Introducing S-BPM at an IT Service Providers -- Abstract -- 4.1 Project Background and Initial Situation -- 4.2 Course of the Project -- 4.2.1 Retrospective Overview -- 4.2.2 Preparation Phase -- 4.2.3 Initial Workshop -- 4.2.3.1 Workshop Preparation -- 4.2.3.2 Workshop Meeting and Results -- 4.2.4 Follow-ups -- 4.2.4.1 Analysis and Modeling -- 4.2.4.2 Validation and Optimization -- 4.2.4.3 Organizational Embedding -- 4.2.4.4 Implementation and Embedding in IT -- 4.2.4.5 Monitoring -- 4.3 Results -- 4.3.1 Goal Achievement in the Software Deployment Domain -- 4.3.2 Experience with S-BPM Methodology and Software -- Sec17.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">References -- 5 A Service Hardware Application Case Fiducia -- Abstract -- 5.1 Background -- 5.1.1 History of PCs -- 5.1.2 History of the `Mainframe Mind Set' -- 5.1.3 The Change Brought by Globalization -- 5.1.4 Effects in the Companies -- 5.1.5 Departmental Expectations Are Changing -- 5.1.6 An Ideal Scenario -- 5.2 Needs at Fiducia -- 5.2.1 The Introduction of S-BPM -- 5.2.2 The Process Modelers -- 5.2.3 The IT Experts -- 5.3 A Sample Project: Managed Service Hardware (IT-Supported Process Introduction) -- 5.3.1 The Need to Introduce Managed Service Hardware -- 5.3.2 Managed Service Hardware as a Solution -- 5.3.3 Project Start: Initial Information-Gathering Process -- 5.3.4 Framework Conditions -- 5.3.5 First Rough Estimate: 150 Person-Days -- 5.3.6 Weaknesses Recognized -- 5.3.6.1 Lack of Detail -- 5.3.6.2 Redundancies in Partial Processes -- 5.3.6.3 Modelling Outcomes Are not Sufficiently Detailed -- 5.3.6.4 Low Level of Identification with the Outcome -- 5.3.6.5 Lack of Confidence in Making Mistakes -- 5.3.7 Project Restart from Scratch -- 5.3.8 Workshops with the Role-Holders -- 5.3.9 S-BPM Supports the Departments' Way of Thinking -- 5.3.10 Methodology Can also Be Used by the Department in Connection with a Tool -- 5.3.11 Full Identification with the Outcome -- 5.3.12 IT Application Could Be Completed at an Early Stage -- 5.4 Summary of Experiences Gained in This Project -- 5.4.1 Outcomes and Recognized Effects of the Actions Taken -- 5.4.2 Several Benefits Have Been Achieved by Introducing S-BPM -- 5.5 Closing Remarks -- 6 Designing an Agile Process Layer for Competitive Differentiation -- Abstract -- 6.1 The Challenge -- 6.2 The Solution -- 6.3 The Project Work -- 6.3.1 Agile Procedure in Scrum Rhythm -- 6.3.2 Participation-Acceptance Model (PAM) -- 6.3.3 Spectrum of Process Transformation -- 6.4 Summary and Outlook.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">Part IIConsultancy and Education Support -- 7 Model as You Do: Engaging an S-BPM Vendor on Process Modelling in 3D Virtual Worlds -- Abstract -- 7.1 Metasonic Engages QUT June 2013 -- 7.2 Theoretical Inspirations from Readings Dec. 2013 to Jan. 2014 -- 7.2.1 Customer Involvement in BPM -- 7.2.2 Tacit Knowledge for Process Modelling -- 7.2.3 Situated Cognition via Virtual Worlds -- 7.2.4 Brisbane Design Workshop Jan. 2014 -- 7.3 Designing an Integrated 3D Virtual World S-BPM Approach Feb. 2014 -- 7.3.1 Activity Specification -- 7.3.2 Choice Specification -- 7.4 Evaluation at Metasonic Headquarters April 2014 -- 7.4.1 3D Virtual World Tool Evaluation Approach -- 7.4.2 Quantitative Results -- 7.4.3 Experiment Observations -- 7.4.4 Participant Comments -- 7.4.5 Games Engine Workshop -- 7.4.6 Metasonic Staff Reflections -- 7.4.7 Notable Program Changes -- 7.5 Conclusions -- 7.6 Implications -- Acknowledgments -- References -- 8 A Tangible Modeling Interface for Subject-Oriented Business Process Management -- Abstract -- 8.1 Introduction -- 8.2 Defining a Framework for Modeling: Design and Notation -- 8.3 Developing the S-BPM Buildbook -- 8.3.1 The First Version -- 8.3.2 The Second Version -- 8.4 Tangible-to-Digital Process Model Conversion -- 8.5 Case Studies -- 8.5.1 First Case Study: Novices in Modeling and the S-BPM Buildbook -- 8.5.2 Second Case Study: ``Pen and Paper'' Versus ``the Buildbook'' -- 8.6 Overall Conclusion -- References -- 9 A Reference Model for Maintenance Processes -- Abstract -- 9.1 Importance of Maintenance Processes -- 9.2 Importance of a Reference Model -- 9.3 Selecting S-BPM for Representation -- 9.4 The Maintenance Process Reference Model -- 9.4.1 Subject Behavior Diagram (SBD) of the Working System -- 9.4.2 SBD of the Operations Manager -- 9.4.3 SBD of the Maintenance Manager -- 9.4.4 SBD of the Maintenance Workers.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">9.4.5 SBD of the Warehouse/Procurement -- 9.5 Outlook -- Appendix: Guideline for the Expert Interviews -- References -- 10 Role and Rights Management -- Abstract -- 10.1 Role and Rights Management -- 10.2 Motivation -- 10.3 What Role and Rights Management Does -- 10.3.1 Business Processes -- 10.3.2 Data Access -- 10.4 Current Problems and Possible Solutions -- 10.4.1 Redundancy -- 10.4.2 Wrong Models and Meta-Models -- 10.5 Requirements for an Organization Server---A Case Study -- 10.5.1 Knowledge Hierarchy -- 10.5.2 Relationships -- 10.5.3 Intelligent Subject Resolution -- 10.5.4 Multidimensional Organizations -- 10.6 The Organization Server C-Org -- 10.6.1 Implementation -- 10.6.2 Usage of C-Org -- 10.6.3 C-Org from the Viewpoint of S-BPM -- 10.6.4 Additional Features -- 10.7 Conclusion and Takeaway -- References -- 11 Embodying Business Rules in S-BPM -- Abstract -- 11.1 A Business Rules Primer -- 11.1.1 Introduction -- 11.1.2 Illustrative Example -- 11.1.3 Business Processes and Rules -- 11.2 S-BPM and Business Rules -- 11.2.1 Concept -- 11.2.2 Implementation -- 11.3 The Case of ABC Logistics -- 11.4 Results -- 11.4.1 Impact of Actions -- 11.4.2 Open Issues -- 11.4.3 Takeaway -- References -- 12 Agents Implementing Subject Behaviour: A Manufacturing Scenario -- Abstract -- 12.1 Introduction -- 12.2 Specifying a Production Process in S-BPM -- 12.3 Mapping Subjects to Agents -- 12.4 Developing Control Mechanisms for Subject Execution -- 12.5 Conclusion -- Acknowledgments -- Part IIITechnical Execution Support -- 13 An Abstract State Machine Interpreter for S-BPM -- Abstract -- 13.1 Setting the Stage -- 13.2 Conversation -- 13.3 Closing -- References -- 14 Structured Communication---Approaching S-BPM with Microsoft Technologies -- Abstract -- 14.1 Introduction and Motivation -- 14.2 Structured Communication -- 14.3 How to Execute S-BPM Models.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">14.3.1 Workflow Technology -- 14.3.2 S-BPM as Windows Workflow Model -- 14.3.3 The First Prototype (PROMI) -- 14.3.4 Moving into the Cloud -- 14.4 Results -- 14.4.1 Impact of Actions -- 14.4.2 Open Issues -- 14.4.3 Takeaway -- References -- 15 ERP Integration in S-BPM Processes -- Abstract -- 15.1 Introduction -- 15.2 Project SUGGEST -- 15.3 Finding a Way of Communication -- 15.3.1 Talend ESB -- 15.3.2 JCo-API -- 15.3.3 OData -- 15.3.4 Web GUI -- 15.3.5 GUI for Windows -- 15.4 Practical Application -- 15.4.1 Prototype Talend ESB -- 15.4.2 Prototype JCo-API -- 15.4.3 Prototype OData -- 15.4.4 Prototype Web GUI -- 15.4.5 Prototype GUI for Windows -- 15.5 Results and Outlook -- Acknowledgments -- References -- Appendix -- Index.</subfield></datafield><datafield tag="588" ind1=" " ind2=" "><subfield code="a">Description based on publisher supplied metadata and other sources.</subfield></datafield><datafield tag="590" ind1=" " ind2=" "><subfield code="a">Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries. </subfield></datafield><datafield tag="655" ind1=" " ind2="4"><subfield code="a">Electronic books.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Schmidt, Werner.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Stary, Christian.</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Print version:</subfield><subfield code="a">Fleischmann, Albert</subfield><subfield code="t">S-BPM in the Wild</subfield><subfield code="d">Cham : Springer International Publishing AG,c2015</subfield><subfield code="z">9783319175416</subfield></datafield><datafield tag="797" ind1="2" ind2=" "><subfield code="a">ProQuest (Firm)</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6422803</subfield><subfield code="z">Click to View</subfield></datafield></record></collection>