Digital Transformation of the Design, Construction and Management Processes of the Built Environment.
Saved in:
Superior document: | Research for Development Series |
---|---|
: | |
TeilnehmendeR: | |
Place / Publishing House: | Cham : : Springer International Publishing AG,, 2019. ©2020. |
Year of Publication: | 2019 |
Edition: | 1st ed. |
Language: | English |
Series: | Research for Development Series
|
Online Access: | |
Physical Description: | 1 online resource (391 pages) |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Table of Contents:
- Intro
- Preface
- Introduction
- Contents
- About the Editors
- Interoperable Management of the Process
- National BIM Digital Platform for Construction (INNOVance Project)
- 1 Introduction
- 2 The Project
- 3 The Prototype
- 4 Conclusion
- References
- From Cloud to BIM Model of the Built Environment: The Digitized Process for Competitive Tender, Project, Construction and Management
- 1 Digitization Process of Building Construction
- 2 Reference Regulations
- 3 Level of Development: Geometry and Information
- 4 Case Study: From Point Cloud to BIM Model of a Square in Milan
- 5 Categorization of BIM Elements
- 6 Conclusion
- References
- The Construction Contract Execution Through the Integration of Blockchain Technology
- 1 Introduction
- 2 Blockchain Technology
- 3 Integration Between BIM and Blockchain
- 3.1 Benefits in the Construction Process
- 3.2 Implementation in Contract Execution
- 4 Conclusion
- References
- BIMReL: The Interoperable BIM Library for Construction Products Data Sharing
- 1 The Development of an Interoperable Platform
- 2 Research Project Objectives
- 3 Compliance with the Reference Framework
- 4 The Development of an Advanced BIM Library for the Construction Sector
- 5 The Role of the Citizen in the Pursuit of Sustainability
- 6 The Project's Partners
- 7 The Web Portal
- 7.1 User Management
- 7.2 New Product
- 7.3 Edit and Review
- 7.4 XML (eXtensible Markup Language) and Digital CE
- 7.5 BIMReL IFC
- 8 Concluding Remarks
- References
- Life Cycle BIM-Oriented Data Collection: A Framework for Supporting Practitioners
- 1 Change of Paradigm of BIM Toward LCT
- 2 Joining Life Cycle Information, Building Elements and Actors
- 3 Life Cycle Information Flow During the Process
- 3.1 Pre-design Phase
- 3.2 Schematic Design Phase
- 3.3 Design Development Phase.
- 3.4 Construction Document Phase
- 4 Outlook of the Resulting Life Cycle BIM Database
- References
- Decision-Making BIM Platform for Chemical Building Products
- 1 Introduction
- 2 Current Italian Situation Regarding BIM Utilization
- 3 The Information Management Process for Chemical Products in a BIM-Based Approach
- 4 Conclusion
- References
- BIM Electric Objects Plug-in for Industry 4.0
- 1 Introduction
- 2 The Project
- 3 Method
- 4 Results
- 5 Conclusion
- References
- Da.Ma.Tra: Material Traceability Database
- 1 Introduction
- 2 The Research Project
- 3 Innovative Ecological Materials and the Circular Economy
- 4 Conclusions
- References
- Natural Language Processing for Information and Project Management
- 1 Introduction
- 2 Natural Language Processing (NLP): Rule Based, Statistical and Deep NLP
- 3 NLP Application for Project Management in AECO Sector
- 4 An Application: NLP for Risk Management
- 5 Conclusions and Further Developments: NLP for Requirements Engineering
- References
- Structuring General Information Specifications for Contracts in Accordance with the UNI 11337:2017 Standard
- 1 Introduction
- 2 Models Development and Coordination
- 3 Organization of Graphic Models
- 4 Specifications for the Use of Objects in Digital Models
- 5 Documentation
- 6 Data Sharing and Collaboration
- 7 Data Exchange Format
- 8 Level of Development of Digital Objects
- 9 Conclusion
- References
- Design Stage
- Clash Detection and Code Checking BIM Platform for the Italian Market
- 1 Introduction
- 2 Methods
- 3 Results
- 4 Conclusion
- References
- Digital Culture for Optimization
- 1 Introduction
- 2 Optimization
- 3 Simulation in Architecture
- 4 Case Study: Adaptive Topology
- References
- Performance-Based Design Approach for Tailored Acoustic Surfaces
- 1 Introduction.
- 2 Room Acoustics Modelling Techniques
- 2.1 Simulating Acoustic Phenomena
- 2.2 Integrated Approaches for Architectural Acoustics
- 3 Methodology
- 3.1 Performance-Driven Design for Global Form-Finding of Acoustic Surfaces
- 3.2 Empirical Studies on Materials and Absorption Coefficients
- 4 Case Study
- 4.1 Case Study Selection and Criteria
- 4.2 Simulation and Analysis of the State-of-the-Art Conditions
- 5 Surfaces for Tailored Performance
- 6 Simulation and Results
- 7 Conclusions and Discussion
- References
- Do Smart City Policies Work?
- 1 Introduction
- 2 Defining Smart Cities
- 3 Delimiting Smart City Policies
- 4 Methods and Data for Policy Impact Assessment
- 5 Empirical Results
- 6 Conclusions and Ways Forward
- References
- Digital Design and Wooden Architecture for Arte Sella Land Art Park
- 1 Introduction
- 2 Process Methodology
- 3 Case Studies
- 3.1 Wooden Byobu: Atsushi Kitagawara
- 3.2 Kodama: Kengo Kuma
- 4 Conclusions and Further Developments of the Research Project
- References
- The Impact of Digitalization on Processes and Organizational Structures of Architecture and Engineering Firms
- 1 Introduction
- 2 Research Approach
- 2.1 Case-Study Analysis: Process-Oriented Changes in the Italian Firm
- 2.2 Case-Study Analysis: Organizational Changes in the Canadian Firm
- 3 Findings
- 3.1 Process-Oriented Changes
- 3.2 Organizational Changes
- 4 Discussion
- 4.1 Collaboration
- 4.2 Integration
- 5 Final Considerations and Future Directions
- References
- Execution Stage
- BIM Management Guidelines of the Construction Process for General Contractors
- 1 Introduction
- 2 Identify BIM Goals and Uses
- 3 Design the BIM Execution Process
- 4 Develop Information Exchanges
- 5 Define Supporting Infrastructure
- 6 Pilot-Projects
- 7 Conclusion
- References.
- BIM Methodology and Tools Implementation for Construction Companies (GreenBIM Project)
- 1 Introduction
- 2 Background
- 2.1 BIM in Small and Medium Enterprises
- 2.2 Cost Estimating in BIM
- 2.3 Implementation Process
- 3 Conclusion
- References
- Adaptive Skins: Towards New Material Systems
- 1 The Role of Adaptivity
- 2 Stimulus-Responsive Materials and Control Systems
- 3 Shape Memory Alloys for a Dynamic Shading System
- 3.1 Methodology and Design Strategy
- 3.2 Simulation and Prototyping
- 4 Soft-Robotic Weather-Responsive Envelope
- 4.1 Methodology and Design Strategy
- 4.2 Simulation and Prototyping
- 5 Conclusion
- References
- Development of a System for the Production of Disposable Carbon Fiber Formworks
- 1 Choice of Materials
- 2 Innovation in Design, Process, and Product
- Management Stage
- Built Heritage Information Modelling/Management. Research Perspectives
- 1 Introduction
- 2 Built Cultural Heritage Process
- 3 Survey and LoDs
- 4 Model, Platform, Common Data Environment
- 5 Towards Semantic Interoperability
- References
- Digital Asset Management
- 1 Shifting Towards a New Real Estate Market
- 2 State of the Art
- 3 Aim of the Research
- 4 Methods and Tools
- 5 Case Studies and Tools
- 5.1 Artificial Neural Networks and GIS for Energy Retrofit Policy
- 5.2 BIM-Based Building Resilience Rating System
- 5.3 Building Maintenance Budget Allocation
- 5.4 Green BIM
- 6 Smart Contract for Optimised Facility Management of Cognitive Buildings
- 7 Conclusions and Next Development
- References
- Building and District Data Organization to Improve Facility and Property Management
- 1 Introduction
- 2 Information Management for Built Environments
- 3 Building Logbook
- 4 District Logbook
- 5 Facility and Property Process Support
- 6 Discussion and Conclusions
- References.
- Digital Transformation in Facility Management (FM). IoT and Big Data for Service Innovation
- 1 Information and Communication Technologies as Driver for Innovation of FM Sector
- 2 FM-Related Information: The Role of IoT and Big Data Management
- 3 IoT Platforms for Advanced FM Service Management
- 4 Definition of FM IoT-Based Strategies
- 4.1 Strategies for Monitoring and Controlling Service Performance
- 4.2 Operation and Maintenance Strategies
- 4.3 Strategies for Stakeholders Management
- References
- BIM Digital Platform for First Aid: Firefighters, Police, Red Cross
- 1 Introduction
- 2 3D BIM Project
- 3 Method
- 3.1 Interviews and Questionnaires
- 3.2 Structuring Technical Data Sheets and BIM Object Management
- 3.3 Geographic Information System (GIS) Use in the Project
- 4 Results
- 5 Conclusion
- References
- The Effect of Real-Time Sensing of a Window on Energy Efficiency, Comfort, Health and User Behavior
- 1 Smart Buildings Operation
- 1.1 Building Smartness Degree
- 1.2 Data Collection and Processing
- 2 Conclusions
- References
- Digital 3D Control Room for Healthcare
- 1 The Role of Digital Technologies in the Construction Process
- 1.1 The Digital 3D Project
- 2 The Elaboration of the Digital 3D Model
- 3 Interoperability System of the Model
- 4 Final Considerations
- References
- Guidelines to Integrate BIM for Asset and Facility Management of a Public University
- 1 Introduction
- 2 Information Management According to International Standard
- 3 State of the Art of International Guidelines for Information Modelling
- 4 Research Methodology
- 5 Case Study
- 5.1 Geometric and Non-geometric Data Survey for the Creation of a BIM Library
- 5.2 Master Model and DataBase
- 5.3 Model Output
- 6 Discussion and Further Development
- References.
- BIM and Post-occupancy Evaluations for Building Management System: Weaknesses and Opportunities.