Environmental management in construction : : a quantitative approach / / Zhen Chen and Heng Li.

Demands on the construction industry are changing, and it is now virtually essential for environmental management to be considered at all stages of a project. Many construction managers are finding a quantitative approach useful, and this book outlines four quantitative methods which can be applied...

Full description

Saved in:
Bibliographic Details
VerfasserIn:
TeilnehmendeR:
Place / Publishing House:London ;, New York : : Taylor & Francis,, 2006.
Year of Publication:2006
Language:English
Physical Description:1 online resource (232 p.)
Notes:Description based upon print version of record.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 03368cam a2200649Ii 4500
001 993660433004498
005 20240424230542.0
006 m o d |
007 cr -n---------
008 180331s2006 enka ob 001 0 eng d
010 |z  2005031998 
020 |a 1-134-19883-3 
020 |a 1-134-19884-1 
020 |a 1-280-71971-0 
020 |a 9786610719716 
020 |a 0-203-03036-2 
024 7 |a 10.4324/9780203030363   |2 doi 
035 |a (CKB)1000000000359389 
035 |a (EBL)292821 
035 |a (OCoLC)263593283 
035 |a (SSID)ssj0000148414 
035 |a (PQKBManifestationID)11144803 
035 |a (PQKBTitleCode)TC0000148414 
035 |a (PQKBWorkID)10224742 
035 |a (PQKB)10178708 
035 |a (MiAaPQ)EBC292821 
035 |a (OCoLC)84833698 
035 |a (EXLCZ)991000000000359389 
040 |a MiAaPQ  |c MiAaPQ  |d MiAaPQ 
041 |a eng 
050 4 |a TH437  |b .C435 2006 
082 0 0 |a 690.0286 
084 |a 56.40  |2 bcl 
100 1 |a Chen, Zhen,  |d 1967,  |e author. 
245 1 0 |a Environmental management in construction :  |b a quantitative approach /  |c Zhen Chen and Heng Li. 
246 |a Environmental Management in Construction  
264 1 |a London ;  |a New York :  |b Taylor & Francis,  |c 2006. 
300 |a 1 online resource (232 p.) 
336 |a text  |b txt 
337 |a computer  |b c 
338 |a online resource  |b cr 
500 |a Description based upon print version of record. 
505 0 |a Book Cover; Title; Copyright; Contents; Tables; Figures; About the authors; Foreword; Preface; Acknowledgements; List of abbreviations; Chapter 1 Introduction; Chapter 2 E+: An integrative methodology; Chapter 3 Effective prevention at pre-construction stage; Chapter 4 Effective control at construction stage; Chapter 5 Effective reduction at post-construction stage; Chapter 6 Knowledge-driven evaluation; Appendix A A questionnaire about EMS application; Appendix B A decision-making model; Appendix C Sample waste exchange websites; Appendix D Webfill function menu; Glossary; References 
505 8 |a Author indexSubject index 
520 |a Demands on the construction industry are changing, and it is now virtually essential for environmental management to be considered at all stages of a project. Many construction managers are finding a quantitative approach useful, and this book outlines four quantitative methods which can be applied at different construction stages, and which fit within a comprehensive framework of dynamic Environmental Impact Assessment (EIA). These include:a method to quantitatively evaluate and reduce pollution and hazards levelsa method to evaluate the environmental-consciousness of  
546 |a English 
504 |a Includes bibliographical references and index. 
540 |a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International  |f CC BY-NC-ND 4.0  |u https://creativecommons.org/licenses/by-nc-nd/4.0/legalcode 
588 |a Description based on print version record; resource not viewed. 
506 0 |f Unrestricted online access  |2 star 
650 0 |a Building  |x Data processing. 
650 0 |a Construction industry  |x Environmental aspects  |x Measurement. 
650 0 |a Environmental protection  |x Management. 
650 0 |a Sustainable buildings  |x Design and construction. 
700 1 |a Li, Heng. 
776 |z 1-138-96889-7 
776 |z 0-415-37055-8 
906 |a BOOK 
ADM |b 2024-04-26 03:15:03 Europe/Vienna  |f system  |c marc21  |a 2012-02-26 02:09:28 Europe/Vienna  |g false 
AVE |i DOAB Directory of Open Access Books  |P DOAB Directory of Open Access Books  |x https://eu02.alma.exlibrisgroup.com/view/uresolver/43ACC_OEAW/openurl?u.ignore_date_coverage=true&portfolio_pid=5338359130004498&Force_direct=true  |Z 5338359130004498  |b Available  |8 5338359130004498