Prolonged cycle times and schedule growth in defense acquisition : : a literature review / / Jessie Riposo [et al.]

This report summarizes a selection of the defense acquisition literature from the 1960s to the present on potential sources of prolonged acquisition cycle times and schedule growth, as well as potential opportunities for improvement. It presents the range of possible causes of schedule-related probl...

Full description

Saved in:
Bibliographic Details
:
VerfasserIn:
TeilnehmendeR:
Place / Publishing House:Santa Monica, CA : : Rand ;, 2014
Year of Publication:2014
Language:English
Physical Description:1 online resource (xviii, 83 pages)
Notes:Bibliographic Level Mode of Issuance: Monograph
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 02779cam-a2200385zu-4500
001 993628425804498
005 20220902154705.0
008 160829s2014 cau on o000 0 eng d
020 |a 0-8330-8673-1 
035 |a (CKB)2560000000315366 
035 |a (SSID)ssj0001400668 
035 |a (PQKBManifestationID)12484131 
035 |a (PQKBTitleCode)TC0001400668 
035 |a (PQKBWorkID)11344248 
035 |a (PQKB)11211745 
035 |a (EXLCZ)992560000000315366 
040 |a PQKB 
041 |a eng 
050 0 |a UC260.R57 2014 
082 0 |a 355.6/212 
100 1 |a Riposo, Jessie  |e Author 
245 1 0 |a Prolonged cycle times and schedule growth in defense acquisition :  |b a literature review /  |c Jessie Riposo [et al.] 
264 3 1 |a Santa Monica, CA :  |b Rand ;  |c 2014 
300 |a 1 online resource (xviii, 83 pages) 
336 |a text  |b txt 
337 |a computer  |b c 
338 |a online resource  |b cr 
500 |a Bibliographic Level Mode of Issuance: Monograph 
546 |a English 
520 |a This report summarizes a selection of the defense acquisition literature from the 1960s to the present on potential sources of prolonged acquisition cycle times and schedule growth, as well as potential opportunities for improvement. It presents the range of possible causes of schedule-related problems and various recommendations cited for improving schedules by various authors and organizations. This report does not provide critical analysis or an assessment of the strengths or weaknesses of the claims made in the literature. Rather, it provides a starting point for further research or consideration by government acquisition professionals, oversight organizations, and the analytic community. We identified the following reasons for schedule delays in the literature: (1) the difficulty of managing technical risk (e.g., program complexity, immature technology, and unanticipated technical issues), (2) initial assumptions or expectations that were difficult to fulfill (e.g., schedule estimates, risk control, requirements, and performance assumptions), and (3) funding instability. The most commonly cited recommendations for reducing cycle time and controlling schedule growth in the literature are strategies that manage or reduce technical risk. Some of those recommendations include using incremental fielding or evolutionary acquisition strategies, developing derivative products (rather than brand-new designs), using mature or proven technology (i.e., commercial, off-the-shelf components), maintaining stable funding, and using atypical contracting vehicles. 
650 0 |a Armed Forces  |x Procurement 
700 1 |a McKernan, Megan  |e Author 
700 1 |a Duran, Chelsea Kaihoi  |e Author 
710 2 |a National Defense Research Institute (U.S.) 
776 |z 0-8330-8515-8 
906 |a BOOK 
ADM |b 2024-03-19 00:39:45 Europe/Vienna  |d 00  |f system  |c marc21  |a 2015-01-31 21:58:14 Europe/Vienna  |g false 
AVE |i DOAB Directory of Open Access Books  |P DOAB Directory of Open Access Books  |x https://eu02.alma.exlibrisgroup.com/view/uresolver/43ACC_OEAW/openurl?u.ignore_date_coverage=true&portfolio_pid=5350467290004498&Force_direct=true  |Z 5350467290004498  |b Available  |8 5350467290004498