Algorithms for scheduling problems / / edited by Frank Werner, Larysa Burtseva, Yuri Sotskov.

This edited book presents new results in the area of algorithm development for different types of scheduling problems. In eleven chapters, algorithms for single machine problems, flow-shop and job-shop scheduling problems (including their hybrid (flexible) variants), the resource-constrained project...

Full description

Saved in:
Bibliographic Details
TeilnehmendeR:
Place / Publishing House:Basel, Switzerland : : MDPI,, 2018.
Year of Publication:2018
Language:English
Physical Description:1 online resource (208 pages) :; illustrations
Tags: Add Tag
No Tags, Be the first to tag this record!
id 993603207604498
ctrlnum (CKB)5400000000000502
(NjHacI)995400000000000502
(EXLCZ)995400000000000502
collection bib_alma
record_format marc
spelling Algorithms for scheduling problems / edited by Frank Werner, Larysa Burtseva, Yuri Sotskov.
Basel, Switzerland : MDPI, 2018.
1 online resource (208 pages) : illustrations
text txt rdacontent
computer c rdamedia
online resource cr rdacarrier
Description based on publisher supplied metadata and other sources.
This edited book presents new results in the area of algorithm development for different types of scheduling problems. In eleven chapters, algorithms for single machine problems, flow-shop and job-shop scheduling problems (including their hybrid (flexible) variants), the resource-constrained project scheduling problem, scheduling problems in complex manufacturing systems and supply chains, and workflow scheduling problems are given. The chapters address such subjects as insertion heuristics for energy-efficient scheduling, the re-scheduling of train traffic in real time, control algorithms for short-term scheduling in manufacturing systems, bi-objective optimization of tortilla production, scheduling problems with uncertain (interval) processing times, workflow scheduling for digital signal processor (DSP) clusters, and many more.
About the Special Issue Editors -- Preface to "Algorithms for Scheduling Problems" -- Hongliang Zhang, Youcai Fang, Ruilin Pan and Chuanming Ge A New Greedy Insertion Heuristic Algorithm with a Multi-Stage Filtering Mechanism for Energy-Efficient Single Machine Scheduling Problems Reprinted from: Algorithms 2018, 11, 18, doi: 10.3390/a11020018 -- Yuri N. Sotskov and Natalja G. Egorova Single Machine Scheduling Problem with Interval Processing Times and Total Completion Time Objective Reprinted from: Algorithms 2018, 11, 66, doi: 10.3390/a11050066 -- Nodari Vakhania Scheduling a Single Machine with Primary and Secondary Objectives Reprinted from: Algorithms 2018, 11, 80, doi: 10.3390/a11060080 -- Helio Yochihiro Fuchigami, Ruhul Sarker and Socorro Rangel Near-Optimal Heuristics for Just-In-Time Jobs Maximization in Flow Shop Scheduling Reprinted from: Algorithms 2018, 11, 43, doi: 10.3390/a11040043 -- Victor Hugo Yaurima-Basaldua, Andrei Tchernykh, Francisco Villalobos-Rodríguez and Ricardo Salomon-Torres Hybrid Flow Shop with Unrelated Machines, Setup Time, and Work in Progress Buffers for Bi-Objective Optimization of Tortilla Manufacturing Reprinted from: Algorithms 2018, 11, 68, doi: 10.3390/a11050068 -- Omid Gholami and Johanna Törnquist Krasemann A Heuristic Approach to Solving the Train Traffic Re-Scheduling Problem in Real Time Reprinted from: Algorithms 2018, 11, 55, doi: 10.3390/a11040055 -- Alexander A. Lazarev, Ivan Nekrasov and Nikolay Pravdivets Evaluating Typical Algorithms of Combinatorial Optimization to Solve Continuous-Time Based Scheduling Problem Reprinted from: Algorithms 2018, 11, 50, doi: 10.3390/a11040050 -- D. G. Mogale, Geet Lahoti, Shashi Bhushan Jha, Manish Shukla, Narasimha Kamath and Manoj Kumar Tiwari Dual Market Facility Network Design under Bounded Rationality Reprinted from: Algorithms 2018, 11, 54, doi: 10.3390/a11040054 -- Boris Sokolov, Alexandre Dolgui and Dmitry Ivanov Optimal Control Algorithms and Their Analysis Manufacturing Systems for Short-Term Scheduling in Reprinted from: Algorithms 2018, 11, 57, doi: 10.3390/a11050057 -- Boris Kriheli and Eugene Levner Entropy-Based Algorithm for Supply-Chain Complexity Assessment Reprinted from: Algorithms 2018, 11, 35, doi: 10.3390/a11040035 -- Alexander Yu. Drozdov, Andrei Tchernykh, Sergey V. Novikov, Victor E. Vladislavlev and PHEFT: Pessimistic Image Processing Workflow Scheduling for DSP Clusters Raul Rivera-Rodriguez Reprinted from: Algorithms 2018, 11, 76, doi: 10.3390/a11050076.
Automated guided vehicle systems.
Werner, Frank, editor.
Burtseva, Larysa, editor.
Sotskov, Yuri, editor.
language English
format eBook
author2 Werner, Frank,
Burtseva, Larysa,
Sotskov, Yuri,
author_facet Werner, Frank,
Burtseva, Larysa,
Sotskov, Yuri,
author2_variant f w fw
l b lb
y s ys
author2_role TeilnehmendeR
TeilnehmendeR
TeilnehmendeR
title Algorithms for scheduling problems /
spellingShingle Algorithms for scheduling problems /
About the Special Issue Editors -- Preface to "Algorithms for Scheduling Problems" -- Hongliang Zhang, Youcai Fang, Ruilin Pan and Chuanming Ge A New Greedy Insertion Heuristic Algorithm with a Multi-Stage Filtering Mechanism for Energy-Efficient Single Machine Scheduling Problems Reprinted from: Algorithms 2018, 11, 18, doi: 10.3390/a11020018 -- Yuri N. Sotskov and Natalja G. Egorova Single Machine Scheduling Problem with Interval Processing Times and Total Completion Time Objective Reprinted from: Algorithms 2018, 11, 66, doi: 10.3390/a11050066 -- Nodari Vakhania Scheduling a Single Machine with Primary and Secondary Objectives Reprinted from: Algorithms 2018, 11, 80, doi: 10.3390/a11060080 -- Helio Yochihiro Fuchigami, Ruhul Sarker and Socorro Rangel Near-Optimal Heuristics for Just-In-Time Jobs Maximization in Flow Shop Scheduling Reprinted from: Algorithms 2018, 11, 43, doi: 10.3390/a11040043 -- Victor Hugo Yaurima-Basaldua, Andrei Tchernykh, Francisco Villalobos-Rodríguez and Ricardo Salomon-Torres Hybrid Flow Shop with Unrelated Machines, Setup Time, and Work in Progress Buffers for Bi-Objective Optimization of Tortilla Manufacturing Reprinted from: Algorithms 2018, 11, 68, doi: 10.3390/a11050068 -- Omid Gholami and Johanna Törnquist Krasemann A Heuristic Approach to Solving the Train Traffic Re-Scheduling Problem in Real Time Reprinted from: Algorithms 2018, 11, 55, doi: 10.3390/a11040055 -- Alexander A. Lazarev, Ivan Nekrasov and Nikolay Pravdivets Evaluating Typical Algorithms of Combinatorial Optimization to Solve Continuous-Time Based Scheduling Problem Reprinted from: Algorithms 2018, 11, 50, doi: 10.3390/a11040050 -- D. G. Mogale, Geet Lahoti, Shashi Bhushan Jha, Manish Shukla, Narasimha Kamath and Manoj Kumar Tiwari Dual Market Facility Network Design under Bounded Rationality Reprinted from: Algorithms 2018, 11, 54, doi: 10.3390/a11040054 -- Boris Sokolov, Alexandre Dolgui and Dmitry Ivanov Optimal Control Algorithms and Their Analysis Manufacturing Systems for Short-Term Scheduling in Reprinted from: Algorithms 2018, 11, 57, doi: 10.3390/a11050057 -- Boris Kriheli and Eugene Levner Entropy-Based Algorithm for Supply-Chain Complexity Assessment Reprinted from: Algorithms 2018, 11, 35, doi: 10.3390/a11040035 -- Alexander Yu. Drozdov, Andrei Tchernykh, Sergey V. Novikov, Victor E. Vladislavlev and PHEFT: Pessimistic Image Processing Workflow Scheduling for DSP Clusters Raul Rivera-Rodriguez Reprinted from: Algorithms 2018, 11, 76, doi: 10.3390/a11050076.
title_full Algorithms for scheduling problems / edited by Frank Werner, Larysa Burtseva, Yuri Sotskov.
title_fullStr Algorithms for scheduling problems / edited by Frank Werner, Larysa Burtseva, Yuri Sotskov.
title_full_unstemmed Algorithms for scheduling problems / edited by Frank Werner, Larysa Burtseva, Yuri Sotskov.
title_auth Algorithms for scheduling problems /
title_new Algorithms for scheduling problems /
title_sort algorithms for scheduling problems /
publisher MDPI,
publishDate 2018
physical 1 online resource (208 pages) : illustrations
contents About the Special Issue Editors -- Preface to "Algorithms for Scheduling Problems" -- Hongliang Zhang, Youcai Fang, Ruilin Pan and Chuanming Ge A New Greedy Insertion Heuristic Algorithm with a Multi-Stage Filtering Mechanism for Energy-Efficient Single Machine Scheduling Problems Reprinted from: Algorithms 2018, 11, 18, doi: 10.3390/a11020018 -- Yuri N. Sotskov and Natalja G. Egorova Single Machine Scheduling Problem with Interval Processing Times and Total Completion Time Objective Reprinted from: Algorithms 2018, 11, 66, doi: 10.3390/a11050066 -- Nodari Vakhania Scheduling a Single Machine with Primary and Secondary Objectives Reprinted from: Algorithms 2018, 11, 80, doi: 10.3390/a11060080 -- Helio Yochihiro Fuchigami, Ruhul Sarker and Socorro Rangel Near-Optimal Heuristics for Just-In-Time Jobs Maximization in Flow Shop Scheduling Reprinted from: Algorithms 2018, 11, 43, doi: 10.3390/a11040043 -- Victor Hugo Yaurima-Basaldua, Andrei Tchernykh, Francisco Villalobos-Rodríguez and Ricardo Salomon-Torres Hybrid Flow Shop with Unrelated Machines, Setup Time, and Work in Progress Buffers for Bi-Objective Optimization of Tortilla Manufacturing Reprinted from: Algorithms 2018, 11, 68, doi: 10.3390/a11050068 -- Omid Gholami and Johanna Törnquist Krasemann A Heuristic Approach to Solving the Train Traffic Re-Scheduling Problem in Real Time Reprinted from: Algorithms 2018, 11, 55, doi: 10.3390/a11040055 -- Alexander A. Lazarev, Ivan Nekrasov and Nikolay Pravdivets Evaluating Typical Algorithms of Combinatorial Optimization to Solve Continuous-Time Based Scheduling Problem Reprinted from: Algorithms 2018, 11, 50, doi: 10.3390/a11040050 -- D. G. Mogale, Geet Lahoti, Shashi Bhushan Jha, Manish Shukla, Narasimha Kamath and Manoj Kumar Tiwari Dual Market Facility Network Design under Bounded Rationality Reprinted from: Algorithms 2018, 11, 54, doi: 10.3390/a11040054 -- Boris Sokolov, Alexandre Dolgui and Dmitry Ivanov Optimal Control Algorithms and Their Analysis Manufacturing Systems for Short-Term Scheduling in Reprinted from: Algorithms 2018, 11, 57, doi: 10.3390/a11050057 -- Boris Kriheli and Eugene Levner Entropy-Based Algorithm for Supply-Chain Complexity Assessment Reprinted from: Algorithms 2018, 11, 35, doi: 10.3390/a11040035 -- Alexander Yu. Drozdov, Andrei Tchernykh, Sergey V. Novikov, Victor E. Vladislavlev and PHEFT: Pessimistic Image Processing Workflow Scheduling for DSP Clusters Raul Rivera-Rodriguez Reprinted from: Algorithms 2018, 11, 76, doi: 10.3390/a11050076.
isbn 3-03897-120-0
callnumber-first T - Technology
callnumber-subject TS - Manufactures
callnumber-label TS191
callnumber-sort TS 3191 A446 42018
illustrated Illustrated
dewey-hundreds 600 - Technology
dewey-tens 670 - Manufacturing
dewey-ones 670 - Manufacturing
dewey-full 670.427
dewey-sort 3670.427
dewey-raw 670.427
dewey-search 670.427
work_keys_str_mv AT wernerfrank algorithmsforschedulingproblems
AT burtsevalarysa algorithmsforschedulingproblems
AT sotskovyuri algorithmsforschedulingproblems
status_str n
ids_txt_mv (CKB)5400000000000502
(NjHacI)995400000000000502
(EXLCZ)995400000000000502
carrierType_str_mv cr
is_hierarchy_title Algorithms for scheduling problems /
author2_original_writing_str_mv noLinkedField
noLinkedField
noLinkedField
_version_ 1796653209251479553
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>04383nam a2200313 i 4500</leader><controlfield tag="001">993603207604498</controlfield><controlfield tag="005">20230630174849.0</controlfield><controlfield tag="006">m o d </controlfield><controlfield tag="007">cr |||||||||||</controlfield><controlfield tag="008">230630s2018 sz a o 000 0 eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">3-03897-120-0</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(CKB)5400000000000502</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(NjHacI)995400000000000502</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(EXLCZ)995400000000000502</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">NjHacI</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="c">NjHacl</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TS191</subfield><subfield code="b">.A446 2018</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">670.427</subfield><subfield code="2">23</subfield></datafield><datafield tag="245" ind1="0" ind2="0"><subfield code="a">Algorithms for scheduling problems /</subfield><subfield code="c">edited by Frank Werner, Larysa Burtseva, Yuri Sotskov.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Basel, Switzerland :</subfield><subfield code="b">MDPI,</subfield><subfield code="c">2018.</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (208 pages) :</subfield><subfield code="b">illustrations</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="588" ind1=" " ind2=" "><subfield code="a">Description based on publisher supplied metadata and other sources.</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This edited book presents new results in the area of algorithm development for different types of scheduling problems. In eleven chapters, algorithms for single machine problems, flow-shop and job-shop scheduling problems (including their hybrid (flexible) variants), the resource-constrained project scheduling problem, scheduling problems in complex manufacturing systems and supply chains, and workflow scheduling problems are given. The chapters address such subjects as insertion heuristics for energy-efficient scheduling, the re-scheduling of train traffic in real time, control algorithms for short-term scheduling in manufacturing systems, bi-objective optimization of tortilla production, scheduling problems with uncertain (interval) processing times, workflow scheduling for digital signal processor (DSP) clusters, and many more.</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">About the Special Issue Editors -- Preface to "Algorithms for Scheduling Problems" -- Hongliang Zhang, Youcai Fang, Ruilin Pan and Chuanming Ge A New Greedy Insertion Heuristic Algorithm with a Multi-Stage Filtering Mechanism for Energy-Efficient Single Machine Scheduling Problems Reprinted from: Algorithms 2018, 11, 18, doi: 10.3390/a11020018 -- Yuri N. Sotskov and Natalja G. Egorova Single Machine Scheduling Problem with Interval Processing Times and Total Completion Time Objective Reprinted from: Algorithms 2018, 11, 66, doi: 10.3390/a11050066 -- Nodari Vakhania Scheduling a Single Machine with Primary and Secondary Objectives Reprinted from: Algorithms 2018, 11, 80, doi: 10.3390/a11060080 -- Helio Yochihiro Fuchigami, Ruhul Sarker and Socorro Rangel Near-Optimal Heuristics for Just-In-Time Jobs Maximization in Flow Shop Scheduling Reprinted from: Algorithms 2018, 11, 43, doi: 10.3390/a11040043 -- Victor Hugo Yaurima-Basaldua, Andrei Tchernykh, Francisco Villalobos-Rodríguez and Ricardo Salomon-Torres Hybrid Flow Shop with Unrelated Machines, Setup Time, and Work in Progress Buffers for Bi-Objective Optimization of Tortilla Manufacturing Reprinted from: Algorithms 2018, 11, 68, doi: 10.3390/a11050068 -- Omid Gholami and Johanna Törnquist Krasemann A Heuristic Approach to Solving the Train Traffic Re-Scheduling Problem in Real Time Reprinted from: Algorithms 2018, 11, 55, doi: 10.3390/a11040055 -- Alexander A. Lazarev, Ivan Nekrasov and Nikolay Pravdivets Evaluating Typical Algorithms of Combinatorial Optimization to Solve Continuous-Time Based Scheduling Problem Reprinted from: Algorithms 2018, 11, 50, doi: 10.3390/a11040050 -- D. G. Mogale, Geet Lahoti, Shashi Bhushan Jha, Manish Shukla, Narasimha Kamath and Manoj Kumar Tiwari Dual Market Facility Network Design under Bounded Rationality Reprinted from: Algorithms 2018, 11, 54, doi: 10.3390/a11040054 -- Boris Sokolov, Alexandre Dolgui and Dmitry Ivanov Optimal Control Algorithms and Their Analysis Manufacturing Systems for Short-Term Scheduling in Reprinted from: Algorithms 2018, 11, 57, doi: 10.3390/a11050057 -- Boris Kriheli and Eugene Levner Entropy-Based Algorithm for Supply-Chain Complexity Assessment Reprinted from: Algorithms 2018, 11, 35, doi: 10.3390/a11040035 -- Alexander Yu. Drozdov, Andrei Tchernykh, Sergey V. Novikov, Victor E. Vladislavlev and PHEFT: Pessimistic Image Processing Workflow Scheduling for DSP Clusters Raul Rivera-Rodriguez Reprinted from: Algorithms 2018, 11, 76, doi: 10.3390/a11050076.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Automated guided vehicle systems.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Werner, Frank,</subfield><subfield code="e">editor.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Burtseva, Larysa,</subfield><subfield code="e">editor.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Sotskov, Yuri,</subfield><subfield code="e">editor.</subfield></datafield><datafield tag="906" ind1=" " ind2=" "><subfield code="a">BOOK</subfield></datafield><datafield tag="ADM" ind1=" " ind2=" "><subfield code="b">2023-07-08 12:10:16 Europe/Vienna</subfield><subfield code="f">system</subfield><subfield code="c">marc21</subfield><subfield code="a">2020-10-31 22:37:04 Europe/Vienna</subfield><subfield code="g">false</subfield></datafield><datafield tag="AVE" ind1=" " ind2=" "><subfield code="i">DOAB Directory of Open Access Books</subfield><subfield code="P">DOAB Directory of Open Access Books</subfield><subfield code="x">https://eu02.alma.exlibrisgroup.com/view/uresolver/43ACC_OEAW/openurl?u.ignore_date_coverage=true&amp;portfolio_pid=5338024420004498&amp;Force_direct=true</subfield><subfield code="Z">5338024420004498</subfield><subfield code="b">Available</subfield><subfield code="8">5338024420004498</subfield></datafield></record></collection>