Production scheduling / / edited by Rodrigo da Rosa Righi.
Generally speaking, scheduling is the procedure of mapping a set of tasks or jobs (studied objects) to a set of target resources efficiently. More specifically, as a part of a larger planning and scheduling process, production scheduling is essential for the proper functioning of a manufacturing ent...
Saved in:
TeilnehmendeR: | |
---|---|
Place / Publishing House: | Rijeka, Croatia : : InTech,, [2012] ©2012 |
Year of Publication: | 2012 |
Language: | English |
Physical Description: | 1 online resource (x, 230 pages) :; illustrations |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
993547936904498 |
---|---|
ctrlnum |
(CKB)3230000000076743 (NjHacI)993230000000076743 (oapen)https://directory.doabooks.org/handle/20.500.12854/65411 (EXLCZ)993230000000076743 |
collection |
bib_alma |
record_format |
marc |
spelling |
da Rosa Righi, Rodrigo edt Production scheduling / edited by Rodrigo da Rosa Righi. IntechOpen 2012 Rijeka, Croatia : InTech, [2012] ©2012 1 online resource (x, 230 pages) : illustrations text txt rdacontent computer c rdamedia online resource cr rdacarrier Description based on: online resource; title from PDF information screen (InTech, viewed October 17, 2022). Generally speaking, scheduling is the procedure of mapping a set of tasks or jobs (studied objects) to a set of target resources efficiently. More specifically, as a part of a larger planning and scheduling process, production scheduling is essential for the proper functioning of a manufacturing enterprise. This book presents ten chapters divided into five sections. Section 1 discusses rescheduling strategies, policies, and methods for production scheduling. Section 2 presents two chapters about flow shop scheduling. Section 3 describes heuristic and metaheuristic methods for treating the scheduling problem in an efficient manner. In addition, two test cases are presented in Section 4. The first uses simulation, while the second shows a real implementation of a production scheduling system. Finally, Section 5 presents some modeling strategies for building production scheduling systems. This book will be of interest to those working in the decision-making branches of production, in various operational research areas, as well as computational methods design. People from a diverse background ranging from academia and research to those working in industry, can take advantage of this volume. English Production scheduling. Production engineering 953-307-935-5 Righi, Rodrigo da Rosa, editor. |
language |
English |
format |
eBook |
author2 |
Righi, Rodrigo da Rosa, |
author_facet |
Righi, Rodrigo da Rosa, |
author2_variant |
r r r d rrr rrrd r d r r rdr rdrr |
author2_role |
TeilnehmendeR |
title |
Production scheduling / |
spellingShingle |
Production scheduling / |
title_full |
Production scheduling / edited by Rodrigo da Rosa Righi. |
title_fullStr |
Production scheduling / edited by Rodrigo da Rosa Righi. |
title_full_unstemmed |
Production scheduling / edited by Rodrigo da Rosa Righi. |
title_auth |
Production scheduling / |
title_new |
Production scheduling / |
title_sort |
production scheduling / |
publisher |
IntechOpen InTech, |
publishDate |
2012 |
physical |
1 online resource (x, 230 pages) : illustrations |
isbn |
953-51-6107-5 953-307-935-5 |
callnumber-first |
T - Technology |
callnumber-subject |
TS - Manufactures |
callnumber-label |
TS157 |
callnumber-sort |
TS 3157.5 P763 42012 |
illustrated |
Illustrated |
dewey-hundreds |
600 - Technology |
dewey-tens |
650 - Management & public relations |
dewey-ones |
658 - General management |
dewey-full |
658.53 |
dewey-sort |
3658.53 |
dewey-raw |
658.53 |
dewey-search |
658.53 |
work_keys_str_mv |
AT darosarighirodrigo productionscheduling AT righirodrigodarosa productionscheduling |
status_str |
n |
ids_txt_mv |
(CKB)3230000000076743 (NjHacI)993230000000076743 (oapen)https://directory.doabooks.org/handle/20.500.12854/65411 (EXLCZ)993230000000076743 |
carrierType_str_mv |
cr |
is_hierarchy_title |
Production scheduling / |
author2_original_writing_str_mv |
noLinkedField |
_version_ |
1796652159502123008 |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00968nam a2200289 i 4500</leader><controlfield tag="001">993547936904498</controlfield><controlfield tag="005">20221017112348.0</controlfield><controlfield tag="006">m o d </controlfield><controlfield tag="007">cr |||||||||||</controlfield><controlfield tag="008">221017s2012 ci a o 000 0 eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">953-51-6107-5</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(CKB)3230000000076743</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(NjHacI)993230000000076743</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(oapen)https://directory.doabooks.org/handle/20.500.12854/65411</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(EXLCZ)993230000000076743</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">NjHacI</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="c">NjHacl</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TS157.5</subfield><subfield code="b">.P763 2012</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">658.53</subfield><subfield code="2">23</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">da Rosa Righi, Rodrigo</subfield><subfield code="4">edt</subfield></datafield><datafield tag="245" ind1="0" ind2="0"><subfield code="a">Production scheduling /</subfield><subfield code="c">edited by Rodrigo da Rosa Righi.</subfield></datafield><datafield tag="260" ind1=" " ind2=" "><subfield code="b">IntechOpen</subfield><subfield code="c">2012</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Rijeka, Croatia :</subfield><subfield code="b">InTech,</subfield><subfield code="c">[2012]</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">©2012</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (x, 230 pages) :</subfield><subfield code="b">illustrations</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="588" ind1=" " ind2=" "><subfield code="a">Description based on: online resource; title from PDF information screen (InTech, viewed October 17, 2022).</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Generally speaking, scheduling is the procedure of mapping a set of tasks or jobs (studied objects) to a set of target resources efficiently. More specifically, as a part of a larger planning and scheduling process, production scheduling is essential for the proper functioning of a manufacturing enterprise. This book presents ten chapters divided into five sections. Section 1 discusses rescheduling strategies, policies, and methods for production scheduling. Section 2 presents two chapters about flow shop scheduling. Section 3 describes heuristic and metaheuristic methods for treating the scheduling problem in an efficient manner. In addition, two test cases are presented in Section 4. The first uses simulation, while the second shows a real implementation of a production scheduling system. Finally, Section 5 presents some modeling strategies for building production scheduling systems. This book will be of interest to those working in the decision-making branches of production, in various operational research areas, as well as computational methods design. People from a diverse background ranging from academia and research to those working in industry, can take advantage of this volume.</subfield></datafield><datafield tag="546" ind1=" " ind2=" "><subfield code="a">English</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Production scheduling.</subfield></datafield><datafield tag="653" ind1=" " ind2=" "><subfield code="a">Production engineering</subfield></datafield><datafield tag="776" ind1=" " ind2=" "><subfield code="z">953-307-935-5</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Righi, Rodrigo da Rosa,</subfield><subfield code="e">editor.</subfield></datafield><datafield tag="906" ind1=" " ind2=" "><subfield code="a">BOOK</subfield></datafield><datafield tag="ADM" ind1=" " ind2=" "><subfield code="b">2023-02-22 20:58:02 Europe/Vienna</subfield><subfield code="f">system</subfield><subfield code="c">marc21</subfield><subfield code="a">2012-12-09 08:17:33 Europe/Vienna</subfield><subfield code="g">false</subfield></datafield><datafield tag="AVE" ind1=" " ind2=" "><subfield code="i">DOAB Directory of Open Access Books</subfield><subfield code="P">DOAB Directory of Open Access Books</subfield><subfield code="x">https://eu02.alma.exlibrisgroup.com/view/uresolver/43ACC_OEAW/openurl?u.ignore_date_coverage=true&portfolio_pid=5338713630004498&Force_direct=true</subfield><subfield code="Z">5338713630004498</subfield><subfield code="b">Available</subfield><subfield code="8">5338713630004498</subfield></datafield></record></collection> |