Referenzprozesse im Bereich von Facility Management / von Gregor Franz Fleischmann

ger: Zur Abwicklung der im Facility Management (FM) getätigten Aktivitäten wird von zahlreichen Normen und Standards prozessorientiertes Handeln gefordert.<br />Für die Optimierung von Kernprozessen ist die Methode des Business Process Reengineering (BPR) bereits anerkannt. Bis jetzt wird BPR...

Full description

Saved in:
Bibliographic Details
VerfasserIn:
Place / Publishing House:2007
Year of Publication:2007
Language:German
Subjects:
Classification:56.04 - Ausbildung, Beruf, Organisationen
Online Access:
Physical Description:VIII, 201 teilw. gef. Bl.; graph. Darst.
Notes:Zsfassung in engl. Sprache
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 07244nam#a2200493#c#4500
001 990001380170504498
005 20230317193431.0
007 cr#|||||||||||
007 tu
008 070306|2007####|||######m####|||#|#ger#c
009 AC05033973
015 |a OeBB  |2 oeb 
035 |a (AT-OBV)AC05033973 
035 |a AC05033973 
035 |a (Aleph)005773117ACC01 
035 |a (DE-599)OBVAC05033973 
035 |a (EXLNZ-43ACC_NETWORK)990057731170203331 
040 |a TUW  |b ger  |d AT-UBTUW  |e rakwb 
041 |a ger 
044 |c XA-AT 
084 |a 56.04  |2 bkl 
100 1 |a Fleischmann, Gregor Franz  |4 aut 
245 1 0 |a Referenzprozesse im Bereich von Facility Management  |c von Gregor Franz Fleischmann 
264 1 |c 2007 
300 |a VIII, 201 teilw. gef. Bl.  |b graph. Darst. 
500 |a Zsfassung in engl. Sprache 
502 |a Wien, Techn. Univ., Diss., 2007 
520 |a ger: Zur Abwicklung der im Facility Management (FM) getätigten Aktivitäten wird von zahlreichen Normen und Standards prozessorientiertes Handeln gefordert.<br />Für die Optimierung von Kernprozessen ist die Methode des Business Process Reengineering (BPR) bereits anerkannt. Bis jetzt wird BPR innerhalb des Facility Management jedoch wegen des hohen Zeitaufwands und der damit verbundenen Kosten noch nicht angewandt (vergl. [ReFl06]).<br />Durch den Einsatz von Best-Practice Modellen kann die Erstellung von Prozessen im Allgemeinen beschleunigt und ihr Qualitätsstandard erhöht werden (vergl. [Beck97]). Der Aufwand für die umfangreiche und anspruchsvolle Definition des Ist-Zustandes und der Soll-Prozesse kann somit durch den Gebrauch von Referenzprozessen verringert werden.<br />Derzeit gibt es jedoch keine wissenschaftlich fundierten Referenzprozesse innerhalb des Facility Management.<br />Diese Arbeit stellt die Methoden der Modellierung von Referenzprozessen dar und wendet diese im Bereich von Facility Management an. Die Modellbildung erfolgt hier im Wesentlichen nach den vier Hauptschritten Definition Modellierung Evaluierung Aktualisierung Im Schritt Definition werden die notwendigen Objekte und Grundlagen für die weitere Modellierung festgelegt. Im zweiten Schritt werden die Prozesse selbst modelliert. Im Schritt Evaluierung werden die fertigen Prozesse auf ihre Anwendbarkeit hin bestätigt, wohingegen die Aktualisierung der Zusammenarbeit späterer Nutzer bedarf.<br />Als Grundlage für den Schritt Definition dienten Standards, Richtlinien und einschlägige Literatur. Diese Recherche wurde durch Case Studies validiert.<br />Die Modellbildung erfolgt nach akzeptierten Richtlinien und Normen. Als Basis für die Standardisierung wurden Fallstudien innerhalb der FM-Abteilungen von 22 Unternehmen durchgeführt. Diese dienten zur Modellierung und Validierung der Prozesse. Die Resultate wurden sachlich und formal evaluiert.<br />Durch abschließende Experteninterviews werden die Modelle inhaltlich validiert. Dadurch wird nachgewiesen, dass die Methoden des Modellierens von Referenzprozessen innerhalb von Facility Management anwendbar sind.<br />Somit wird sich die zeit- und kostenintensive Prozessdefinition in Zukunft effektiver gestalten.<br />Im Rahmen der vorliegenden Forschungsarbeit wurden zunächst die für das zukünftige Facility Management der Österreichischen Akademie der Wissenschaften relevanten Prozesse definiert und so die Grundlagen für eine optimale Implementation von FM erarbeitet. Aufgrund der im weiteren Verlauf der Forschungsthematik definierten Referenzprozesse kann eine Optimierung dieser Prozesse erfolgen.<br /> 
520 |a eng: For carrying out the activities performed in Facility Management (FM), process-orientated action is demanded by numerous norms and standards.<br />For the optimisation of core processes, the method of Business Process Reengineering (BPR) is already recognised. However, up to now, BPR is not used yet within Facility Management because of the high expenditure of time and the costs associated with it (cp. [ReFl06]).<br />By the employment of Best Practice models, the development of processes can generally be accelerated, and their quality standard can be increased (cp. [Beck97]). The expenditure for the extensive and ambitious definition of the actual condition and of the target processes can be reduced, thus, by the use of reference processes. However, currently, there are no scientifically well-founded reference processes existing within Facility Management.<br />This research work presents the methods of modelling reference processes and their application in the area of Facility Management. Basically, the development of the model is realised here according to the four main steps Definition Modelling Evaluation Actualisation In the step "definition", the necessary objects and bases are specified for the further modelling. In the second step, the processes themselves are modelled. In the step "evaluation", the finished processes are approved for their applicability, whereas the actualisation requires the co-operation of future users.<br />As basis for the step "definition" standards, guidelines and relevant literature have served. This investigation was validated by case studies.<br />The development of the model is carried out according to accepted guidelines and standards. As basis for the standardisation, case studies were accomplished within the FM departments of 22 companies. They served for modelling and validation of the processes. The results were evaluated factually and formally.<br />Finally, by expert interviews, the models are validated by their contents and by doing so, it is proven that the methods of modelling reference processes are applicable within Facility Management.<br />Thus, in the future, the time-consuming and cost-intensive process definition will prove to be more effective.<br />Within the research work on hand, at first, the processes relevant for the future Facility Management of the Austrian Academy of Sciences were defined and so, the fundamentals for an ideal implementation of FM were compiled. Because of the reference processes defined in the further progress of the research topic, an optimisation of these processes can be carried out. 
689 0 0 |a Facility-Management  |D s  |0 (DE-588)4372194-1 
689 0 1 |a Restrukturierung  |D s  |0 (DE-588)4335640-0 
689 0 |5 AT-OBV  |5 ONBREB 
776 0 8 |i Erscheint auch als  |n Online-Ausgabe  |o urn:nbn:at:at-ubtuw:1-17440  |o 20.500.12708/12457 
856 4 1 |q text/html  |u http://hdl.handle.net/20.500.12708/12457  |x TUW  |z kostenfrei  |3 Volltext  |r In Copyright  |7 0 
856 4 1 |m V:AT-OBV;B:AT-TUW  |q application/pdf  |u http://media.obvsg.at/AC05033973-2001  |x TUW  |3 Volltext  |o OBV-EDOC 
970 1 |c 41 
970 2 |a  TUW  |d HS-DISS 
970 0 |a OPUS7919 
971 1 |a Redlein, Alexander 
971 1 |a Mang, Herbert A. 
971 3 |a 2007-03 
971 4 |a Dr. techn. 
971 5 |a Technische Universität Wien  |b Fakultät für Bauingenieurwesen  |c Institut für interdisziplinäres Bauprozessmanagement  |d E324  |0 ioo:TU:BI:E234 
971 8 |a Facility Management / Referenzprozesse / Best Practice / Business Process Reengineering 
971 9 |a Facility Management / Reference Processes / Best Practise / Business Process Reengineering 
ADM |b 2024-08-05 15:46:30 Europe/Vienna  |d 20  |f System  |c marc21  |a 2018-12-24 05:18:20 Europe/Vienna  |g false 
HOL 8 |b YWOAW  |h 35901-C  |c MAG1-3  |8 2213990950004498 
852 8 |b YWOAW  |c MAG1-3  |h 35901-C  |8 2213990950004498 
ITM |9 2213990950004498  |e 1  |m BOOK  |b +YW8861407  |i 35901-C  |2 MAG1-3  |o 20070515  |8 2313990940004498  |f 02  |p 2007-05-15 02:00:00 Europe/Vienna  |h 35901-C  |1 YWOAW  |q 2022-06-09 11:13:04 Europe/Vienna