Early Estimation of Project Determinants : : Predictions through Establishing the Basis of New Building Projects in Germany.
The study initiated with underlying principles of construction production which is an impetus to ill-conditioned prediction of project determinants at the early phases of building projects. To enhance the precision of these estimations, unique solutions relying on the statistical evidences were offe...
Saved in:
Superior document: | Title is part of eBook package: De Gruyter DGBA Backlist Business and Economics 2000-2014 (EN) |
---|---|
VerfasserIn: | |
Place / Publishing House: | München ;, Wien : : De Gruyter Oldenbourg, , [2013] ©2014 |
Year of Publication: | 2013 |
Language: | English |
Series: | Schriftenreihe Bauökonomie ;
1 |
Online Access: | |
Physical Description: | 1 online resource (136 p.) |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 05086nam a22009615i 4500 | ||
---|---|---|---|
001 | 9783110347876 | ||
003 | DE-B1597 | ||
005 | 20211129102213.0 | ||
006 | m|||||o||d|||||||| | ||
007 | cr || |||||||| | ||
008 | 211129t20132014gw fo d z eng d | ||
020 | |a 9783110347876 | ||
024 | 7 | |a 10.1524/9783110347876 |2 doi | |
035 | |a (DE-B1597)246609 | ||
035 | |a (OCoLC)979969549 | ||
040 | |a DE-B1597 |b eng |c DE-B1597 |e rda | ||
041 | 0 | |a eng | |
044 | |a gw |c DE | ||
050 | 4 | |a NA2542.4 |b .D877 2014eb | |
072 | 7 | |a BUS070080 |2 bisacsh | |
082 | 0 | 4 | |a 692.50943 |2 23 |
100 | 1 | |a Dursun, Onur, |e author. |4 aut |4 http://id.loc.gov/vocabulary/relators/aut | |
245 | 1 | 0 | |a Early Estimation of Project Determinants : |b Predictions through Establishing the Basis of New Building Projects in Germany. |
264 | 1 | |a München ; |a Wien : |b De Gruyter Oldenbourg, |c [2013] | |
264 | 4 | |c ©2014 | |
300 | |a 1 online resource (136 p.) | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
347 | |a text file |b PDF |2 rda | ||
490 | 0 | |a Schriftenreihe Bauökonomie ; |v 1 | |
502 | |a Dissertation |c Univ. Stuttgart |d 2013. | ||
505 | 0 | 0 | |t Frontmatter -- |t Contents -- |t List of Abbreviations -- |t List of Figures -- |t List of Tables -- |t Abstract -- |t Zusammenfassung -- |t 1 Introduction -- |t 2 Literature Review -- |t 3 Methodology -- |t 4 Sample -- |t 5 Results of Analysis -- |t 6 Comparison of the Frameworks -- |t 7 Implementation -- |t 8 Conclusions -- |t References |
506 | 0 | |a restricted access |u http://purl.org/coar/access_right/c_16ec |f online access with authorization |2 star | |
520 | |a The study initiated with underlying principles of construction production which is an impetus to ill-conditioned prediction of project determinants at the early phases of building projects. To enhance the precision of these estimations, unique solutions relying on the statistical evidences were offered. | ||
520 | |a The study initiated with underlying principles of construction production which is an impetus to ill-conditioned prediction of project determinants at the early phases of building projects. To enhance the precision of these estimations, unique solutions relying on the statistical evidences were offered. Two alternative methods of analysis, namely linear regression and artificial neural networks, were employed to recognize the patterns in the sampled projects. Comparison was conducted on the basis of prediction measurements that were computed with the help of unseen test sample. The evidences of the empirical investigation suggest offered solutions provide superior prediction accuracy when compared to current practices. Last but not least, implementation of the solutions was illustrated on a random office development. | ||
538 | |a Mode of access: Internet via World Wide Web. | ||
546 | |a In English. | ||
588 | 0 | |a Description based on online resource; title from PDF title page (publisher's Web site, viewed 29. Nov 2021) | |
650 | 0 | |a Architecture and society |z Germany. | |
650 | 0 | |a Construction industry |z Germany |x Management. | |
650 | 0 | |a Project management |z Germany. | |
650 | 4 | |a Artificial neutral networks. | |
650 | 4 | |a Construction duration. | |
650 | 4 | |a Cost of structure. | |
650 | 4 | |a Germany. | |
650 | 4 | |a Linear regression. | |
650 | 4 | |a Modeling. | |
650 | 4 | |a Multi-way forecasting. | |
650 | 4 | |a Predictions. | |
650 | 7 | |a BUSINESS & ECONOMICS / Industries / Service. |2 bisacsh | |
773 | 0 | 8 | |i Title is part of eBook package: |d De Gruyter |t DGBA Backlist Business and Economics 2000-2014 (EN) |z 9783110621143 |
773 | 0 | 8 | |i Title is part of eBook package: |d De Gruyter |t DGBA Backlist Complete English Language 2000-2014 PART1 |z 9783110238570 |
773 | 0 | 8 | |i Title is part of eBook package: |d De Gruyter |t DGBA Business and Economics 2000 - 2014 |z 9783110635737 |o ZDB-23-GBE |
773 | 0 | 8 | |i Title is part of eBook package: |d De Gruyter |t eBook-Paket OWV/AV BWL, VWL 2013 |z 9783110342659 |o ZDB-23-OAV |
776 | 0 | |c print |z 9783110346381 | |
856 | 4 | 0 | |u https://doi.org/10.1524/9783110347876 |
856 | 4 | 0 | |u https://www.degruyter.com/isbn/9783110347876 |
856 | 4 | 2 | |3 Cover |u https://www.degruyter.com/document/cover/isbn/9783110347876/original |
912 | |a 978-3-11-023857-0 DGBA Backlist Complete English Language 2000-2014 PART1 |c 2000 |d 2014 | ||
912 | |a 978-3-11-062114-3 DGBA Backlist Business and Economics 2000-2014 (EN) |c 2000 |d 2014 | ||
912 | |a EBA_BACKALL | ||
912 | |a EBA_CL_AD | ||
912 | |a EBA_CL_LAEC | ||
912 | |a EBA_DGALL | ||
912 | |a EBA_EBACKALL | ||
912 | |a EBA_EBKALL | ||
912 | |a EBA_ECL_AD | ||
912 | |a EBA_ECL_LAEC | ||
912 | |a EBA_EEBKALL | ||
912 | |a EBA_ESSHALL | ||
912 | |a EBA_ESTMALL | ||
912 | |a EBA_SSHALL | ||
912 | |a EBA_STMALL | ||
912 | |a GBV-deGruyter-alles | ||
912 | |a PDA11SSHE | ||
912 | |a PDA12STME | ||
912 | |a PDA13ENGE | ||
912 | |a PDA17SSHEE | ||
912 | |a PDA18STMEE | ||
912 | |a PDA5EBK | ||
912 | |a ZDB-23-GBE |c 2000 |d 2014 | ||
912 | |a ZDB-23-OAV |b 2013 |