Standard Definitions for Water Losses.

Saved in:
Bibliographic Details
:
Place / Publishing House:London : : IWA Publishing,, 2019.
Ã2019.
Year of Publication:2019
Edition:1st ed.
Language:English
Online Access:
Physical Description:1 online resource (78 pages)
Tags: Add Tag
No Tags, Be the first to tag this record!
Table of Contents:
  • Cover
  • Contents
  • List of Acronyms
  • Standard Symbols for Numeric Values
  • Standard Abbreviations for Units
  • Standard Abbreviations for Pipe Materials
  • Water Resources
  • Potable Water
  • NON-potable Water
  • Raw Water
  • Yield of Water Resource System
  • Deployable Output
  • Available Supply
  • Outage
  • Demand
  • Water Resource Zone (WRZ)
  • Water Supply Zone (WSZ)
  • Supply Reliability
  • Headroom
  • Water Supply Coverage
  • Water Supply Network
  • Water Distribution Network
  • Network Hierarchy
  • Drought
  • Drought Restrictions
  • Supply
  • Rotational Supply
  • Rotational Supply Designation
  • Supply Time (ST)
  • Intermittent Water Supply (IWS)
  • Distribution Network Assets
  • Aqueduct
  • Transmission Main
  • Service Reservoir (SR)
  • Main
  • Edge of Street (EoS)
  • Service Pipe
  • Service Connection
  • Shared Connection
  • Short-side Connection
  • Long-side Connection
  • Private Service Pipe
  • Common Private Service Pipe
  • Private Service Pipe
  • Connection
  • Legal Connection
  • Illegal Connection
  • Connection Density
  • Connection Ratio
  • Active Property
  • Inactive Property
  • Property
  • Property Density
  • Occupancy
  • Step Valve
  • Circulating Valve
  • Boundary Valve
  • Meter Box
  • Stop Tap Chamber
  • External Stop Tap
  • Internal Stop Tap
  • Stop Tap
  • Tapping
  • Tapping Point
  • Tapping Tee
  • Ferrule
  • Appurtenances
  • Fittings
  • Wash Out (WO)
  • Fire Hydrant (FH)
  • Hydrant
  • Air Valve (AV)
  • Sluice Valve (SV)
  • Butterfly Valve
  • Pressure Control Valve
  • Altitude Control Valve
  • Pressure Sustaining Valve (PSV)
  • Pressure Reducing Valve (PRV)
  • Pressure Relief Valve
  • Flow Metering
  • Volumetric Meter
  • Positive Displacement Meter
  • Turbine Meter
  • Electromagnetic Meter (EM)
  • Ultrasonic Meter
  • Full-bore Meter
  • Insertion Meter
  • Meter Calibration
  • Meter Verification
  • Flow
  • Flow Meter.
  • Flow Logger
  • Pulse Unit
  • Abstraction Meter
  • Production Meter
  • Distribution Input Meter
  • DMA Meter
  • Bulk Meter
  • Non-revenue Meter
  • Revenue Meter
  • Meter Reading Lag
  • Automatic Meter Reading (AMR)
  • Advanced Metering Infrastructure (AMI)
  • Smart Meter
  • IWA Standard Water Balance
  • System Input Volume
  • Authorised Consumption
  • Revenue Water
  • Billed Authorised Consumption
  • Billed Metered Consumption
  • Billed Unmetered Consumption
  • Unbilled Authorised Consumption
  • Unbilled Metered Consumption
  • Unbilled Unmetered Consumption
  • Non-Revenue Water (NRW)
  • Unaccounted for Water (UFW)
  • Water Losses
  • Non-technical Losses
  • Apparent Losses (AL)
  • Unauthorised Consumption
  • Data Handling and Billing Errors
  • Underestimation of Unmeasured Consumption
  • Customer Metering Inaccuracies
  • Technical Losses
  • Real Losses (RL)
  • Leakage and Overflows from Utility Storage Tanks
  • Leakage on Service Connections up to the Point of Customer Metering
  • Leakage on Transmission and&amp
  • sol
  • or Distribution Mains
  • Point of Supply
  • Plumbing Losses
  • Consumption
  • Per Capita Consumption (PCC)
  • Per Household Consumption (PHC)
  • Small Area Monitor (SAM)
  • Individual Household Monitor (IHM)
  • Diurnal Demand Pattern
  • Leakage Management
  • Leakage Control
  • Leakage
  • Daily Leakage
  • Night Leakage
  • Zone
  • District Metered Area (DMA)
  • Net Flow
  • Sub-DMA
  • Attributes
  • Minimum Night Flow (MNF)
  • Minimum Flow (MF)
  • Total Integrated Flow Method (TIF Method)
  • Minimum Night Flow Method (MNF Method)
  • Legitimate Night Consumption (LNC)
  • Legitimate Domestic Night Consumption (LDNC)
  • Legitimate Non-household Night Consumption (LNHHNC)
  • Continuous Logged User (CLU)
  • Operability Test
  • Top Down Leakage Assessment (TD)
  • Bottom Up Leakage Assessment (BU)
  • Downstream Leakage
  • Upstream Leakage.
  • Minimum Achieved Night Flow
  • Minimum Achievable Night Flow (Mabl)
  • Unavoidable Annual Real Losses (UARL)
  • Background Leakage
  • Unavoidable Background Leakage (UBL)
  • Infrastructure Condition Factor (ICF)
  • Burst Frequency
  • Mains Burst Frequency
  • Service Pipe Burst Frequency
  • Service Connection Burst Frequency
  • Private Service Pipe Burst Frequency
  • Natural Rate of Rise of Leakage (NRR)
  • Smart Network
  • Leaks
  • Circumferential Break
  • Longitudinal Break
  • Split
  • Other Failure Modes
  • Leak
  • Leak on Main
  • Leak on Service Connection
  • Leak on Private Service Pipe
  • Leak on Appurtenances
  • Reported Leak
  • Unreported Leak
  • Leak Duration
  • Awareness Time
  • Location Time
  • Repair Time
  • Leakage Detection
  • Active Leakage Control (ALC)
  • Leakage Detection Survey
  • Regular Sounding
  • Passive Leakage Control
  • Reactive Survey
  • Locate, Localise, Pinpoint
  • Area of Interest (AOI)
  • Equivalent Service Pipe Burst (ESPB)
  • Leakage Detection Techniques
  • Leak Noise Correlator (LNC)
  • Correlator Survey
  • Stop Tap Sounding Survey
  • Mains Appurtenances Only Sounding Survey
  • Surface Sounding
  • Manual Listening Stick
  • Electronic Listening Stick
  • Ground Microphone
  • Pressure Zero Test (PZT)
  • Acoustic (Noise) Loggers
  • Correlating Acoustic Loggers (CAL)
  • Remote Sensing
  • Non-Intrusive Leak Detection
  • Intrusive Leak Detection
  • Ground Penetrating Radar (GPR)
  • Gas Injection
  • Step Test
  • Temporary DMA Rezoning Test
  • Leak Repairs
  • Repair Clamp
  • Piece Through Repair
  • Pressure Management (PM)
  • Pressure Gauge
  • Pressure Logger
  • Pressure
  • Transients
  • Pressure Reduction
  • Fixed Outlet Pressure Management
  • Time Modulated Pressure Management
  • Flow Modulated Pressure Management
  • Critical Pressure Control Pressure Management
  • Discrete Pressure Area (DPA)
  • Pressure Managed Area (PMA).
  • Critical Point (CP)
  • Average Zone Point (AZP)
  • Average Zone Pressure
  • Average Zone Night Pressure (AZNP)
  • Average Operating Pressure (AOP)
  • Hour to Day Factor (HDF)
  • Fixed and Variable Area Discharge (FAVAD)
  • N1 Factor
  • N1 Step Test
  • N2 Factor
  • N3 Factor
  • Mains and Service Pipe Rehabilitation
  • Mains Relining
  • Open Cut Replacement
  • Pipe Bursting
  • Slip Lining
  • Roll Down
  • Die Drawing
  • Service Pipe Rehabilitation
  • Pipe Condition Surveying
  • Pigging Chamber
  • Mains Flushing
  • Leakage Modelling
  • Demand Calibration
  • Component Loss Model (CLM)
  • Hydraulic Modelling
  • Economic Level of Leakage (ELL)
  • Apparent Loss Management
  • Meter Under-Registration (MUR)
  • Economic Level of Apparent Losses (ELAL)
  • Performance Indicators (PIs)
  • Performance Indicators for Non-Revenue Water
  • Performance Indicator for Apparent Losses
  • Performance Indicators for Real Losses
  • Current Annual Real Losses (CARL)
  • Infrastructure Leakage Index (ILI)
  • Losses per Connection (when system pressurised)
  • Losses per Unit Length of Main (when system pressurised)
  • Pressure Management Index (PMI)
  • Normalised Mains Burst Frequency
  • Normalised Service Pipe Burst Frequency
  • Normalised Service Connection Burst Frequency
  • Normalised Private Service Pipe Burst Frequency
  • Financial
  • Marginal Cost of Water (MCW)
  • Marginal Value of Water (MVW)
  • Marginal Cost of Revenue (MCR)
  • Capital Expenditure (CAPEX)
  • Operational Expenditure (OPEX)
  • Discounted Cash Flow (DCF)
  • Information Technology
  • Geographical Information System (GIS)
  • Work Management System (WMS)
  • Leakage Management System (LMS)
  • Customer Contact System
  • Customer Billing System
  • Waste Notice System
  • Index.