Contracting and Safety : : Exploring Outsourcing Practices in High-Hazard Industries.
Saved in:
Superior document: | SpringerBriefs in Applied Sciences and Technology Series |
---|---|
: | |
TeilnehmendeR: | |
Place / Publishing House: | Cham : : Springer International Publishing AG,, 2022. ©2022. |
Year of Publication: | 2022 |
Edition: | 1st ed. |
Language: | English |
Series: | SpringerBriefs in Applied Sciences and Technology Series
|
Online Access: | |
Physical Description: | 1 online resource (120 pages) |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
5006884913 |
---|---|
ctrlnum |
(MiAaPQ)5006884913 (Au-PeEL)EBL6884913 (OCoLC)1297832670 |
collection |
bib_alma |
record_format |
marc |
spelling |
Hayes, Jan. Contracting and Safety : Exploring Outsourcing Practices in High-Hazard Industries. 1st ed. Cham : Springer International Publishing AG, 2022. ©2022. 1 online resource (120 pages) text txt rdacontent computer c rdamedia online resource cr rdacarrier SpringerBriefs in Applied Sciences and Technology Series Intro -- Foreword -- Preface -- Contents -- 1 Outsourcing and Safety-An Introduction -- 1.1 Why Outsourcing and Safety? -- 1.2 Research Approach -- 1.3 The Structure of the Book -- References -- 2 Contracting and Safety: Lessons from Observing an Outsourcing Process "in the Making" -- 2.1 Introduction -- 2.2 Outsourcing, Contracting Out and Safe Industrial Performance -- 2.3 The Trajectory of an Outsourcing Process in a Nuclear Plant -- 2.3.1 The Issue of Defining Precisely the Outsourced Activity from the Beginning -- 2.3.2 The Trickle-Down Effects of Outsourcing on Safe Industrial Performance -- 2.4 Conclusion: Lessons Learned -- 2.4.1 Lesson 1: A Correct Assessment of the Nature of an Activity Before Outsourcing Is Essential -- 2.4.2 Lesson 2: Hidden Temporalities and Embracing Distant Past and Future Are Key in the Contracting-Out Process -- 2.4.3 Lesson 3: Contracting Out Is a Dynamic Process, Which Requires Heedful Interactions Between Principal and Contractor in the Long Term -- References -- 3 Workload Planning Management of Maintenance Activities in Nuclear Power Plants: Compensation Mechanisms at the Contractor Interface -- 3.1 Introduction -- 3.2 Maintenance Workload Planning at the Contractor Interface -- 3.2.1 Anticipation and Adaptation -- 3.2.2 Effects of Contracting -- 3.3 Research Context, Method and Data -- 3.4 Findings and Analysis -- 3.4.1 Preparing for Maintenance Outages -- 3.4.2 Implementation of Provisions Related to Workload Planning -- 3.4.3 Restoring the Workload-Resource Balance -- 3.4.4 Contractor Adaptability -- 3.5 Discussion and Conclusion -- References -- 4 Inter-organisational Collaboration for the Safety of Railway Vehicles: A Japanese Case -- 4.1 A Serious Incident -- 4.2 The MAIS Approach -- 4.3 Inter-organisational Relations and Efforts to Shape Railway Vehicle Safety in Japan -- 4.4 Analysis. 4.5 Conclusion -- References -- 5 Engaged Scholarship for Exploring Applicability of Relational Contracting to Nuclear Industry Projects -- 5.1 Introduction -- 5.2 Contractual Approaches -- 5.2.1 Traditional Contractual Approaches in the Nuclear Industry -- 5.2.2 Project Alliancing Approach -- 5.2.3 A Legal Perspective to Relational Contracting -- 5.3 Method -- 5.4 Results -- 5.5 Conclusion -- References -- 6 Contracting Qualities that Challenge Reliability: A Case of the Utility Sector -- 6.1 Introduction -- 6.2 Organising for Process Reliability -- 6.3 Contracting Qualities and Reliability in Utility Construction -- 6.3.1 Specialisation -- 6.3.2 Transience -- 6.3.3 Price Competition -- 6.4 Unintended, Unanticipated Events Occur -- 6.5 Recommendations -- 6.6 Conclusions -- References -- 7 Managing Workplace Safety in the Temporary Organisation-Theoretical and Practical Challenges Associated with Large Construction Projects -- 7.1 Introduction -- 7.2 Action-Based Theory of Temporary Organising -- 7.3 Current Safety Management Approaches in Large Construction Projects and Some Limitations -- 7.4 Safety and the Temporary Organising of Construction Projects -- 7.4.1 Time in Large Construction Projects -- 7.4.2 Tasks in Large Construction Projects -- 7.4.3 Teams in Large Construction Projects -- 7.4.4 Transition in Large Construction Projects -- 7.5 Taking Account of Temporary Organising Towards an Action-Based Approach to Workplace Safety -- References -- 8 When the Project Ends and Operations Begin: Ensuring Safety During Commissioning Through Boundary Work -- 8.1 Introduction -- 8.2 Outsourcing, Projects and Safety -- 8.3 A Safety-Critical Project: Building and Operating a New Facility at NucStor Plant -- 8.4 Challenges Encountered in the Commissioning Phase -- 8.5 Boundary Work for Improved Reliability -- 8.6 Discussion and Conclusion -- References. 9 Outsourcing Risk Governance: Using Consultants to Deliver Regulatory Functions -- 9.1 Introduction -- 9.2 Effective Regulation and Effective Regulators -- 9.3 Outsourcing of Regulatory Functions -- 9.4 Economic and Technical Regulation of Gas Supply -- 9.5 Method -- 9.6 Findings -- 9.7 Discussion -- 9.8 Conclusion -- References -- 10 Outsourcing in Theory and Practice: Insights from Nuclear Risk Governance -- 10.1 Introduction -- 10.2 Organisational Hypocrisy: A Definition and Two Gaps -- 10.3 Situated Organisational Hypocrisy and Outsourcing -- 10.4 Research Settings and Cases -- 10.5 Data Collection and Analysis -- 10.6 Organisational Hypocrisy in Action -- 10.7 Normal Organisational Hypocrisy and Outsourcing -- References -- 11 Outsourced Enforcement: Improving the Public Accountability of Building Inspectors -- 11.1 Introduction -- 11.2 Effective Regulation and Effective Regulators -- 11.3 Public Accountability -- 11.4 Grenfell Tower -- 11.5 Incidents in the Australian Building Sector -- 11.6 Discussion -- 11.7 Conclusion -- References -- 12 Implications for Safe Outsourcing -- 12.1 Introduction -- 12.2 The Problem of Fragmentation -- 12.3 Transience and Temporality -- 12.4 Taking Stock and Looking Forward: Advancing Safety Theory -- References. Description based on publisher supplied metadata and other sources. Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries. Electronic books. Tillement, Stéphanie. Print version: Hayes, Jan Contracting and Safety Cham : Springer International Publishing AG,c2022 9783030897918 ProQuest (Firm) https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6884913 Click to View |
language |
English |
format |
eBook |
author |
Hayes, Jan. |
spellingShingle |
Hayes, Jan. Contracting and Safety : Exploring Outsourcing Practices in High-Hazard Industries. SpringerBriefs in Applied Sciences and Technology Series Intro -- Foreword -- Preface -- Contents -- 1 Outsourcing and Safety-An Introduction -- 1.1 Why Outsourcing and Safety? -- 1.2 Research Approach -- 1.3 The Structure of the Book -- References -- 2 Contracting and Safety: Lessons from Observing an Outsourcing Process "in the Making" -- 2.1 Introduction -- 2.2 Outsourcing, Contracting Out and Safe Industrial Performance -- 2.3 The Trajectory of an Outsourcing Process in a Nuclear Plant -- 2.3.1 The Issue of Defining Precisely the Outsourced Activity from the Beginning -- 2.3.2 The Trickle-Down Effects of Outsourcing on Safe Industrial Performance -- 2.4 Conclusion: Lessons Learned -- 2.4.1 Lesson 1: A Correct Assessment of the Nature of an Activity Before Outsourcing Is Essential -- 2.4.2 Lesson 2: Hidden Temporalities and Embracing Distant Past and Future Are Key in the Contracting-Out Process -- 2.4.3 Lesson 3: Contracting Out Is a Dynamic Process, Which Requires Heedful Interactions Between Principal and Contractor in the Long Term -- References -- 3 Workload Planning Management of Maintenance Activities in Nuclear Power Plants: Compensation Mechanisms at the Contractor Interface -- 3.1 Introduction -- 3.2 Maintenance Workload Planning at the Contractor Interface -- 3.2.1 Anticipation and Adaptation -- 3.2.2 Effects of Contracting -- 3.3 Research Context, Method and Data -- 3.4 Findings and Analysis -- 3.4.1 Preparing for Maintenance Outages -- 3.4.2 Implementation of Provisions Related to Workload Planning -- 3.4.3 Restoring the Workload-Resource Balance -- 3.4.4 Contractor Adaptability -- 3.5 Discussion and Conclusion -- References -- 4 Inter-organisational Collaboration for the Safety of Railway Vehicles: A Japanese Case -- 4.1 A Serious Incident -- 4.2 The MAIS Approach -- 4.3 Inter-organisational Relations and Efforts to Shape Railway Vehicle Safety in Japan -- 4.4 Analysis. 4.5 Conclusion -- References -- 5 Engaged Scholarship for Exploring Applicability of Relational Contracting to Nuclear Industry Projects -- 5.1 Introduction -- 5.2 Contractual Approaches -- 5.2.1 Traditional Contractual Approaches in the Nuclear Industry -- 5.2.2 Project Alliancing Approach -- 5.2.3 A Legal Perspective to Relational Contracting -- 5.3 Method -- 5.4 Results -- 5.5 Conclusion -- References -- 6 Contracting Qualities that Challenge Reliability: A Case of the Utility Sector -- 6.1 Introduction -- 6.2 Organising for Process Reliability -- 6.3 Contracting Qualities and Reliability in Utility Construction -- 6.3.1 Specialisation -- 6.3.2 Transience -- 6.3.3 Price Competition -- 6.4 Unintended, Unanticipated Events Occur -- 6.5 Recommendations -- 6.6 Conclusions -- References -- 7 Managing Workplace Safety in the Temporary Organisation-Theoretical and Practical Challenges Associated with Large Construction Projects -- 7.1 Introduction -- 7.2 Action-Based Theory of Temporary Organising -- 7.3 Current Safety Management Approaches in Large Construction Projects and Some Limitations -- 7.4 Safety and the Temporary Organising of Construction Projects -- 7.4.1 Time in Large Construction Projects -- 7.4.2 Tasks in Large Construction Projects -- 7.4.3 Teams in Large Construction Projects -- 7.4.4 Transition in Large Construction Projects -- 7.5 Taking Account of Temporary Organising Towards an Action-Based Approach to Workplace Safety -- References -- 8 When the Project Ends and Operations Begin: Ensuring Safety During Commissioning Through Boundary Work -- 8.1 Introduction -- 8.2 Outsourcing, Projects and Safety -- 8.3 A Safety-Critical Project: Building and Operating a New Facility at NucStor Plant -- 8.4 Challenges Encountered in the Commissioning Phase -- 8.5 Boundary Work for Improved Reliability -- 8.6 Discussion and Conclusion -- References. 9 Outsourcing Risk Governance: Using Consultants to Deliver Regulatory Functions -- 9.1 Introduction -- 9.2 Effective Regulation and Effective Regulators -- 9.3 Outsourcing of Regulatory Functions -- 9.4 Economic and Technical Regulation of Gas Supply -- 9.5 Method -- 9.6 Findings -- 9.7 Discussion -- 9.8 Conclusion -- References -- 10 Outsourcing in Theory and Practice: Insights from Nuclear Risk Governance -- 10.1 Introduction -- 10.2 Organisational Hypocrisy: A Definition and Two Gaps -- 10.3 Situated Organisational Hypocrisy and Outsourcing -- 10.4 Research Settings and Cases -- 10.5 Data Collection and Analysis -- 10.6 Organisational Hypocrisy in Action -- 10.7 Normal Organisational Hypocrisy and Outsourcing -- References -- 11 Outsourced Enforcement: Improving the Public Accountability of Building Inspectors -- 11.1 Introduction -- 11.2 Effective Regulation and Effective Regulators -- 11.3 Public Accountability -- 11.4 Grenfell Tower -- 11.5 Incidents in the Australian Building Sector -- 11.6 Discussion -- 11.7 Conclusion -- References -- 12 Implications for Safe Outsourcing -- 12.1 Introduction -- 12.2 The Problem of Fragmentation -- 12.3 Transience and Temporality -- 12.4 Taking Stock and Looking Forward: Advancing Safety Theory -- References. |
author_facet |
Hayes, Jan. Tillement, Stéphanie. |
author_variant |
j h jh |
author2 |
Tillement, Stéphanie. |
author2_variant |
s t st |
author2_role |
TeilnehmendeR |
author_sort |
Hayes, Jan. |
title |
Contracting and Safety : Exploring Outsourcing Practices in High-Hazard Industries. |
title_sub |
Exploring Outsourcing Practices in High-Hazard Industries. |
title_full |
Contracting and Safety : Exploring Outsourcing Practices in High-Hazard Industries. |
title_fullStr |
Contracting and Safety : Exploring Outsourcing Practices in High-Hazard Industries. |
title_full_unstemmed |
Contracting and Safety : Exploring Outsourcing Practices in High-Hazard Industries. |
title_auth |
Contracting and Safety : Exploring Outsourcing Practices in High-Hazard Industries. |
title_new |
Contracting and Safety : |
title_sort |
contracting and safety : exploring outsourcing practices in high-hazard industries. |
series |
SpringerBriefs in Applied Sciences and Technology Series |
series2 |
SpringerBriefs in Applied Sciences and Technology Series |
publisher |
Springer International Publishing AG, |
publishDate |
2022 |
physical |
1 online resource (120 pages) |
edition |
1st ed. |
contents |
Intro -- Foreword -- Preface -- Contents -- 1 Outsourcing and Safety-An Introduction -- 1.1 Why Outsourcing and Safety? -- 1.2 Research Approach -- 1.3 The Structure of the Book -- References -- 2 Contracting and Safety: Lessons from Observing an Outsourcing Process "in the Making" -- 2.1 Introduction -- 2.2 Outsourcing, Contracting Out and Safe Industrial Performance -- 2.3 The Trajectory of an Outsourcing Process in a Nuclear Plant -- 2.3.1 The Issue of Defining Precisely the Outsourced Activity from the Beginning -- 2.3.2 The Trickle-Down Effects of Outsourcing on Safe Industrial Performance -- 2.4 Conclusion: Lessons Learned -- 2.4.1 Lesson 1: A Correct Assessment of the Nature of an Activity Before Outsourcing Is Essential -- 2.4.2 Lesson 2: Hidden Temporalities and Embracing Distant Past and Future Are Key in the Contracting-Out Process -- 2.4.3 Lesson 3: Contracting Out Is a Dynamic Process, Which Requires Heedful Interactions Between Principal and Contractor in the Long Term -- References -- 3 Workload Planning Management of Maintenance Activities in Nuclear Power Plants: Compensation Mechanisms at the Contractor Interface -- 3.1 Introduction -- 3.2 Maintenance Workload Planning at the Contractor Interface -- 3.2.1 Anticipation and Adaptation -- 3.2.2 Effects of Contracting -- 3.3 Research Context, Method and Data -- 3.4 Findings and Analysis -- 3.4.1 Preparing for Maintenance Outages -- 3.4.2 Implementation of Provisions Related to Workload Planning -- 3.4.3 Restoring the Workload-Resource Balance -- 3.4.4 Contractor Adaptability -- 3.5 Discussion and Conclusion -- References -- 4 Inter-organisational Collaboration for the Safety of Railway Vehicles: A Japanese Case -- 4.1 A Serious Incident -- 4.2 The MAIS Approach -- 4.3 Inter-organisational Relations and Efforts to Shape Railway Vehicle Safety in Japan -- 4.4 Analysis. 4.5 Conclusion -- References -- 5 Engaged Scholarship for Exploring Applicability of Relational Contracting to Nuclear Industry Projects -- 5.1 Introduction -- 5.2 Contractual Approaches -- 5.2.1 Traditional Contractual Approaches in the Nuclear Industry -- 5.2.2 Project Alliancing Approach -- 5.2.3 A Legal Perspective to Relational Contracting -- 5.3 Method -- 5.4 Results -- 5.5 Conclusion -- References -- 6 Contracting Qualities that Challenge Reliability: A Case of the Utility Sector -- 6.1 Introduction -- 6.2 Organising for Process Reliability -- 6.3 Contracting Qualities and Reliability in Utility Construction -- 6.3.1 Specialisation -- 6.3.2 Transience -- 6.3.3 Price Competition -- 6.4 Unintended, Unanticipated Events Occur -- 6.5 Recommendations -- 6.6 Conclusions -- References -- 7 Managing Workplace Safety in the Temporary Organisation-Theoretical and Practical Challenges Associated with Large Construction Projects -- 7.1 Introduction -- 7.2 Action-Based Theory of Temporary Organising -- 7.3 Current Safety Management Approaches in Large Construction Projects and Some Limitations -- 7.4 Safety and the Temporary Organising of Construction Projects -- 7.4.1 Time in Large Construction Projects -- 7.4.2 Tasks in Large Construction Projects -- 7.4.3 Teams in Large Construction Projects -- 7.4.4 Transition in Large Construction Projects -- 7.5 Taking Account of Temporary Organising Towards an Action-Based Approach to Workplace Safety -- References -- 8 When the Project Ends and Operations Begin: Ensuring Safety During Commissioning Through Boundary Work -- 8.1 Introduction -- 8.2 Outsourcing, Projects and Safety -- 8.3 A Safety-Critical Project: Building and Operating a New Facility at NucStor Plant -- 8.4 Challenges Encountered in the Commissioning Phase -- 8.5 Boundary Work for Improved Reliability -- 8.6 Discussion and Conclusion -- References. 9 Outsourcing Risk Governance: Using Consultants to Deliver Regulatory Functions -- 9.1 Introduction -- 9.2 Effective Regulation and Effective Regulators -- 9.3 Outsourcing of Regulatory Functions -- 9.4 Economic and Technical Regulation of Gas Supply -- 9.5 Method -- 9.6 Findings -- 9.7 Discussion -- 9.8 Conclusion -- References -- 10 Outsourcing in Theory and Practice: Insights from Nuclear Risk Governance -- 10.1 Introduction -- 10.2 Organisational Hypocrisy: A Definition and Two Gaps -- 10.3 Situated Organisational Hypocrisy and Outsourcing -- 10.4 Research Settings and Cases -- 10.5 Data Collection and Analysis -- 10.6 Organisational Hypocrisy in Action -- 10.7 Normal Organisational Hypocrisy and Outsourcing -- References -- 11 Outsourced Enforcement: Improving the Public Accountability of Building Inspectors -- 11.1 Introduction -- 11.2 Effective Regulation and Effective Regulators -- 11.3 Public Accountability -- 11.4 Grenfell Tower -- 11.5 Incidents in the Australian Building Sector -- 11.6 Discussion -- 11.7 Conclusion -- References -- 12 Implications for Safe Outsourcing -- 12.1 Introduction -- 12.2 The Problem of Fragmentation -- 12.3 Transience and Temporality -- 12.4 Taking Stock and Looking Forward: Advancing Safety Theory -- References. |
isbn |
9783030897925 9783030897918 |
callnumber-first |
T - Technology |
callnumber-subject |
T - General Technology |
callnumber-label |
T55 |
callnumber-sort |
T 255.4 260.8 |
genre |
Electronic books. |
genre_facet |
Electronic books. |
url |
https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6884913 |
illustrated |
Not Illustrated |
oclc_num |
1297832670 |
work_keys_str_mv |
AT hayesjan contractingandsafetyexploringoutsourcingpracticesinhighhazardindustries AT tillementstephanie contractingandsafetyexploringoutsourcingpracticesinhighhazardindustries |
status_str |
n |
ids_txt_mv |
(MiAaPQ)5006884913 (Au-PeEL)EBL6884913 (OCoLC)1297832670 |
carrierType_str_mv |
cr |
hierarchy_parent_title |
SpringerBriefs in Applied Sciences and Technology Series |
is_hierarchy_title |
Contracting and Safety : Exploring Outsourcing Practices in High-Hazard Industries. |
container_title |
SpringerBriefs in Applied Sciences and Technology Series |
author2_original_writing_str_mv |
noLinkedField |
marc_error |
Info : MARC8 translation shorter than ISO-8859-1, choosing MARC8. --- [ 856 : z ] |
_version_ |
1792331062101147648 |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>07347nam a22004333i 4500</leader><controlfield tag="001">5006884913</controlfield><controlfield tag="003">MiAaPQ</controlfield><controlfield tag="005">20240229073845.0</controlfield><controlfield tag="006">m o d | </controlfield><controlfield tag="007">cr cnu||||||||</controlfield><controlfield tag="008">240229s2022 xx o ||||0 eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783030897925</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">9783030897918</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(MiAaPQ)5006884913</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(Au-PeEL)EBL6884913</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1297832670</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">MiAaPQ</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="e">pn</subfield><subfield code="c">MiAaPQ</subfield><subfield code="d">MiAaPQ</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">T55.4-60.8</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Hayes, Jan.</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Contracting and Safety :</subfield><subfield code="b">Exploring Outsourcing Practices in High-Hazard Industries.</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1st ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Cham :</subfield><subfield code="b">Springer International Publishing AG,</subfield><subfield code="c">2022.</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">©2022.</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (120 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="1" ind2=" "><subfield code="a">SpringerBriefs in Applied Sciences and Technology Series</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">Intro -- Foreword -- Preface -- Contents -- 1 Outsourcing and Safety-An Introduction -- 1.1 Why Outsourcing and Safety? -- 1.2 Research Approach -- 1.3 The Structure of the Book -- References -- 2 Contracting and Safety: Lessons from Observing an Outsourcing Process "in the Making" -- 2.1 Introduction -- 2.2 Outsourcing, Contracting Out and Safe Industrial Performance -- 2.3 The Trajectory of an Outsourcing Process in a Nuclear Plant -- 2.3.1 The Issue of Defining Precisely the Outsourced Activity from the Beginning -- 2.3.2 The Trickle-Down Effects of Outsourcing on Safe Industrial Performance -- 2.4 Conclusion: Lessons Learned -- 2.4.1 Lesson 1: A Correct Assessment of the Nature of an Activity Before Outsourcing Is Essential -- 2.4.2 Lesson 2: Hidden Temporalities and Embracing Distant Past and Future Are Key in the Contracting-Out Process -- 2.4.3 Lesson 3: Contracting Out Is a Dynamic Process, Which Requires Heedful Interactions Between Principal and Contractor in the Long Term -- References -- 3 Workload Planning Management of Maintenance Activities in Nuclear Power Plants: Compensation Mechanisms at the Contractor Interface -- 3.1 Introduction -- 3.2 Maintenance Workload Planning at the Contractor Interface -- 3.2.1 Anticipation and Adaptation -- 3.2.2 Effects of Contracting -- 3.3 Research Context, Method and Data -- 3.4 Findings and Analysis -- 3.4.1 Preparing for Maintenance Outages -- 3.4.2 Implementation of Provisions Related to Workload Planning -- 3.4.3 Restoring the Workload-Resource Balance -- 3.4.4 Contractor Adaptability -- 3.5 Discussion and Conclusion -- References -- 4 Inter-organisational Collaboration for the Safety of Railway Vehicles: A Japanese Case -- 4.1 A Serious Incident -- 4.2 The MAIS Approach -- 4.3 Inter-organisational Relations and Efforts to Shape Railway Vehicle Safety in Japan -- 4.4 Analysis.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">4.5 Conclusion -- References -- 5 Engaged Scholarship for Exploring Applicability of Relational Contracting to Nuclear Industry Projects -- 5.1 Introduction -- 5.2 Contractual Approaches -- 5.2.1 Traditional Contractual Approaches in the Nuclear Industry -- 5.2.2 Project Alliancing Approach -- 5.2.3 A Legal Perspective to Relational Contracting -- 5.3 Method -- 5.4 Results -- 5.5 Conclusion -- References -- 6 Contracting Qualities that Challenge Reliability: A Case of the Utility Sector -- 6.1 Introduction -- 6.2 Organising for Process Reliability -- 6.3 Contracting Qualities and Reliability in Utility Construction -- 6.3.1 Specialisation -- 6.3.2 Transience -- 6.3.3 Price Competition -- 6.4 Unintended, Unanticipated Events Occur -- 6.5 Recommendations -- 6.6 Conclusions -- References -- 7 Managing Workplace Safety in the Temporary Organisation-Theoretical and Practical Challenges Associated with Large Construction Projects -- 7.1 Introduction -- 7.2 Action-Based Theory of Temporary Organising -- 7.3 Current Safety Management Approaches in Large Construction Projects and Some Limitations -- 7.4 Safety and the Temporary Organising of Construction Projects -- 7.4.1 Time in Large Construction Projects -- 7.4.2 Tasks in Large Construction Projects -- 7.4.3 Teams in Large Construction Projects -- 7.4.4 Transition in Large Construction Projects -- 7.5 Taking Account of Temporary Organising Towards an Action-Based Approach to Workplace Safety -- References -- 8 When the Project Ends and Operations Begin: Ensuring Safety During Commissioning Through Boundary Work -- 8.1 Introduction -- 8.2 Outsourcing, Projects and Safety -- 8.3 A Safety-Critical Project: Building and Operating a New Facility at NucStor Plant -- 8.4 Challenges Encountered in the Commissioning Phase -- 8.5 Boundary Work for Improved Reliability -- 8.6 Discussion and Conclusion -- References.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">9 Outsourcing Risk Governance: Using Consultants to Deliver Regulatory Functions -- 9.1 Introduction -- 9.2 Effective Regulation and Effective Regulators -- 9.3 Outsourcing of Regulatory Functions -- 9.4 Economic and Technical Regulation of Gas Supply -- 9.5 Method -- 9.6 Findings -- 9.7 Discussion -- 9.8 Conclusion -- References -- 10 Outsourcing in Theory and Practice: Insights from Nuclear Risk Governance -- 10.1 Introduction -- 10.2 Organisational Hypocrisy: A Definition and Two Gaps -- 10.3 Situated Organisational Hypocrisy and Outsourcing -- 10.4 Research Settings and Cases -- 10.5 Data Collection and Analysis -- 10.6 Organisational Hypocrisy in Action -- 10.7 Normal Organisational Hypocrisy and Outsourcing -- References -- 11 Outsourced Enforcement: Improving the Public Accountability of Building Inspectors -- 11.1 Introduction -- 11.2 Effective Regulation and Effective Regulators -- 11.3 Public Accountability -- 11.4 Grenfell Tower -- 11.5 Incidents in the Australian Building Sector -- 11.6 Discussion -- 11.7 Conclusion -- References -- 12 Implications for Safe Outsourcing -- 12.1 Introduction -- 12.2 The Problem of Fragmentation -- 12.3 Transience and Temporality -- 12.4 Taking Stock and Looking Forward: Advancing Safety Theory -- References.</subfield></datafield><datafield tag="588" ind1=" " ind2=" "><subfield code="a">Description based on publisher supplied metadata and other sources.</subfield></datafield><datafield tag="590" ind1=" " ind2=" "><subfield code="a">Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries. </subfield></datafield><datafield tag="655" ind1=" " ind2="4"><subfield code="a">Electronic books.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Tillement, Stéphanie.</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Print version:</subfield><subfield code="a">Hayes, Jan</subfield><subfield code="t">Contracting and Safety</subfield><subfield code="d">Cham : Springer International Publishing AG,c2022</subfield><subfield code="z">9783030897918</subfield></datafield><datafield tag="797" ind1="2" ind2=" "><subfield code="a">ProQuest (Firm)</subfield></datafield><datafield tag="830" ind1=" " ind2="0"><subfield code="a">SpringerBriefs in Applied Sciences and Technology Series</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6884913</subfield><subfield code="z">Click to View</subfield></datafield></record></collection> |