The Belt and Road Initiative Green Development Case Studies Report 2020.

Saved in:
Bibliographic Details
:
Place / Publishing House:Singapore : : Springer Singapore Pte. Limited,, 2021.
©2022.
Year of Publication:2021
Edition:1st ed.
Language:English
Online Access:
Physical Description:1 online resource (121 pages)
Tags: Add Tag
No Tags, Be the first to tag this record!
id 5006827686
ctrlnum (MiAaPQ)5006827686
(Au-PeEL)EBL6827686
(OCoLC)1289856522
collection bib_alma
record_format marc
spelling Development, BRI International Green.
The Belt and Road Initiative Green Development Case Studies Report 2020.
1st ed.
Singapore : Springer Singapore Pte. Limited, 2021.
©2022.
1 online resource (121 pages)
text txt rdacontent
computer c rdamedia
online resource cr rdacarrier
Intro -- Preface -- Congratulatory Message -- Advisor Group -- Report Team -- Executive Summary -- Contents -- About the Author -- 1 Biodiversity and Ecological System -- 1.1 Nairobi-Malaba Standard Gauge Railway (Phase I) -- 1.1.1 Background -- 1.1.2 Project Overview -- 1.1.3 Boosting Local Employment and Technological Development -- 1.1.4 Protecting the Migration Corridors of Wildlife -- 1.1.5 Collecting Materials According to Local Conditions to Protect the Rivers -- 1.2 New Container Terminal Project of Tema, Ghana -- 1.2.1 Background -- 1.2.2 Project Overview -- 1.2.3 Strict Environmental Protection Measures -- 1.2.4 Sea Turtle Breeding Center -- 1.2.5 Main Experience of the Project -- 2 Clean Energy -- 2.1 Karot Hydropower Station in Pakistan -- 2.1.1 Background -- 2.1.2 Project Overview -- 2.1.3 Sustainability of Project Financing -- 2.1.4 Strict Administrative Measures for the Environment and Biodiversity -- 2.1.5 Green Construction Measures -- 2.1.6 Building of Supporting Infrastructure -- 2.1.7 Establishment of Permanent Exchange Mechanisms with Local Governments and Communities -- 2.1.8 Boosting Local Employment and Skills Training -- 2.2 Mozura Wind Park in Montenegro -- 2.2.1 Background -- 2.2.2 Project Overview -- 2.2.3 China's "Smart Wind Power" Technology -- 2.2.4 Contribution to Energy Technology Transfer -- 3 Clean Water -- 3.1 Cabinda Water Supply Project in Angola -- 3.1.1 Background -- 3.1.2 Project Overview -- 3.1.3 Strict Measures for Environmental Protection -- 3.1.4 Solution to Surface Runoff and Rainfall Erosion -- 3.1.5 Sound Environmental and Social Benefits -- 3.2 Padma (Jashaldia) Water Treatment Plant Project in Bangladesh -- 3.2.1 Background -- 3.2.2 Project Overview -- 3.2.3 Measures for Pollution Control -- 3.2.4 Application of Green Technology -- 4 Sustainable Traffic -- 4.1 South-North Expressway of Montenegro.
4.1.1 Background -- 4.1.2 Project Overview -- 4.1.3 Green Design Strategies and Technical Solutions -- 4.1.4 Environmental Benefits and Related Experience -- 4.2 Peljesac Cross-Sea Bridge of Croatia -- 4.2.1 Background -- 4.2.2 Project Overview -- 4.2.3 Plan of Green Construction -- 4.2.4 Sound Social Benefit -- 5 Solid Waste Treatment -- 5.1 Can The Waste-To-Energy Plant in Vietnam -- 5.1.1 Background -- 5.1.2 Project Overview -- 5.1.3 Environmental Protection Technologies -- 5.1.4 Boosting Development of the Local Industries and Creating More Jobs -- 5.1.5 Actively Communicating with the Local Governments and Communities -- 6 Sustainable Consumption and Production -- 6.1 FINEX™ Fiber Project -- 6.1.1 Background -- 6.1.2 Project Overview -- 6.1.3 Main Techniques and Applications -- 6.1.4 Environmental Benefits -- 6.2 Yanbu Refinery in Saudi Arabia -- 6.2.1 Background -- 6.2.2 Project Overview -- 6.2.3 Strict Environmental Management System -- 6.2.4 Green Production -- 6.2.5 Promotion of Local Employment -- 7 Green Architecture -- 7.1 Lusail Stadium in Qatar -- 7.1.1 Background -- 7.1.2 Project Overview -- 7.1.3 Establishment of a Strict Environmental Management System to Implement the Project -- 7.1.4 Implementation of the Green Building -- 8 Sustainable Food Production -- 8.1 Zambian Solar-Powered Mill Program -- 8.1.1 Background -- 8.1.2 Project Overview -- 8.1.3 Actions -- 8.1.4 Outcomes -- 8.1.5 Experience and Insights -- 8.2 Wanbao Mozambique Rice Farm -- 8.2.1 Background -- 8.2.2 Project Overview -- 8.2.3 Actions -- 8.2.4 Outcomes -- 8.2.5 Experience and Insights -- 9 Corporate Social Responsibility -- 9.1 Uganda Isimba Hydropower Plant -- 9.1.1 Background -- 9.1.2 Project Overview -- 9.1.3 Environment and Social Management -- 9.1.4 Employment and Training -- 9.1.5 Active Fulfillment of Corporate Social Responsibilities -- 10 Conclusion.
Description based on publisher supplied metadata and other sources.
Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries.
Electronic books.
Print version: Development, BRI International Green The Belt and Road Initiative Green Development Case Studies Report 2020 Singapore : Springer Singapore Pte. Limited,c2021 9789811631870
ProQuest (Firm)
https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6827686 Click to View
language English
format eBook
author Development, BRI International Green.
spellingShingle Development, BRI International Green.
The Belt and Road Initiative Green Development Case Studies Report 2020.
Intro -- Preface -- Congratulatory Message -- Advisor Group -- Report Team -- Executive Summary -- Contents -- About the Author -- 1 Biodiversity and Ecological System -- 1.1 Nairobi-Malaba Standard Gauge Railway (Phase I) -- 1.1.1 Background -- 1.1.2 Project Overview -- 1.1.3 Boosting Local Employment and Technological Development -- 1.1.4 Protecting the Migration Corridors of Wildlife -- 1.1.5 Collecting Materials According to Local Conditions to Protect the Rivers -- 1.2 New Container Terminal Project of Tema, Ghana -- 1.2.1 Background -- 1.2.2 Project Overview -- 1.2.3 Strict Environmental Protection Measures -- 1.2.4 Sea Turtle Breeding Center -- 1.2.5 Main Experience of the Project -- 2 Clean Energy -- 2.1 Karot Hydropower Station in Pakistan -- 2.1.1 Background -- 2.1.2 Project Overview -- 2.1.3 Sustainability of Project Financing -- 2.1.4 Strict Administrative Measures for the Environment and Biodiversity -- 2.1.5 Green Construction Measures -- 2.1.6 Building of Supporting Infrastructure -- 2.1.7 Establishment of Permanent Exchange Mechanisms with Local Governments and Communities -- 2.1.8 Boosting Local Employment and Skills Training -- 2.2 Mozura Wind Park in Montenegro -- 2.2.1 Background -- 2.2.2 Project Overview -- 2.2.3 China's "Smart Wind Power" Technology -- 2.2.4 Contribution to Energy Technology Transfer -- 3 Clean Water -- 3.1 Cabinda Water Supply Project in Angola -- 3.1.1 Background -- 3.1.2 Project Overview -- 3.1.3 Strict Measures for Environmental Protection -- 3.1.4 Solution to Surface Runoff and Rainfall Erosion -- 3.1.5 Sound Environmental and Social Benefits -- 3.2 Padma (Jashaldia) Water Treatment Plant Project in Bangladesh -- 3.2.1 Background -- 3.2.2 Project Overview -- 3.2.3 Measures for Pollution Control -- 3.2.4 Application of Green Technology -- 4 Sustainable Traffic -- 4.1 South-North Expressway of Montenegro.
4.1.1 Background -- 4.1.2 Project Overview -- 4.1.3 Green Design Strategies and Technical Solutions -- 4.1.4 Environmental Benefits and Related Experience -- 4.2 Peljesac Cross-Sea Bridge of Croatia -- 4.2.1 Background -- 4.2.2 Project Overview -- 4.2.3 Plan of Green Construction -- 4.2.4 Sound Social Benefit -- 5 Solid Waste Treatment -- 5.1 Can The Waste-To-Energy Plant in Vietnam -- 5.1.1 Background -- 5.1.2 Project Overview -- 5.1.3 Environmental Protection Technologies -- 5.1.4 Boosting Development of the Local Industries and Creating More Jobs -- 5.1.5 Actively Communicating with the Local Governments and Communities -- 6 Sustainable Consumption and Production -- 6.1 FINEX™ Fiber Project -- 6.1.1 Background -- 6.1.2 Project Overview -- 6.1.3 Main Techniques and Applications -- 6.1.4 Environmental Benefits -- 6.2 Yanbu Refinery in Saudi Arabia -- 6.2.1 Background -- 6.2.2 Project Overview -- 6.2.3 Strict Environmental Management System -- 6.2.4 Green Production -- 6.2.5 Promotion of Local Employment -- 7 Green Architecture -- 7.1 Lusail Stadium in Qatar -- 7.1.1 Background -- 7.1.2 Project Overview -- 7.1.3 Establishment of a Strict Environmental Management System to Implement the Project -- 7.1.4 Implementation of the Green Building -- 8 Sustainable Food Production -- 8.1 Zambian Solar-Powered Mill Program -- 8.1.1 Background -- 8.1.2 Project Overview -- 8.1.3 Actions -- 8.1.4 Outcomes -- 8.1.5 Experience and Insights -- 8.2 Wanbao Mozambique Rice Farm -- 8.2.1 Background -- 8.2.2 Project Overview -- 8.2.3 Actions -- 8.2.4 Outcomes -- 8.2.5 Experience and Insights -- 9 Corporate Social Responsibility -- 9.1 Uganda Isimba Hydropower Plant -- 9.1.1 Background -- 9.1.2 Project Overview -- 9.1.3 Environment and Social Management -- 9.1.4 Employment and Training -- 9.1.5 Active Fulfillment of Corporate Social Responsibilities -- 10 Conclusion.
author_facet Development, BRI International Green.
author_variant b i g d big bigd
author_sort Development, BRI International Green.
title The Belt and Road Initiative Green Development Case Studies Report 2020.
title_full The Belt and Road Initiative Green Development Case Studies Report 2020.
title_fullStr The Belt and Road Initiative Green Development Case Studies Report 2020.
title_full_unstemmed The Belt and Road Initiative Green Development Case Studies Report 2020.
title_auth The Belt and Road Initiative Green Development Case Studies Report 2020.
title_new The Belt and Road Initiative Green Development Case Studies Report 2020.
title_sort the belt and road initiative green development case studies report 2020.
publisher Springer Singapore Pte. Limited,
publishDate 2021
physical 1 online resource (121 pages)
edition 1st ed.
contents Intro -- Preface -- Congratulatory Message -- Advisor Group -- Report Team -- Executive Summary -- Contents -- About the Author -- 1 Biodiversity and Ecological System -- 1.1 Nairobi-Malaba Standard Gauge Railway (Phase I) -- 1.1.1 Background -- 1.1.2 Project Overview -- 1.1.3 Boosting Local Employment and Technological Development -- 1.1.4 Protecting the Migration Corridors of Wildlife -- 1.1.5 Collecting Materials According to Local Conditions to Protect the Rivers -- 1.2 New Container Terminal Project of Tema, Ghana -- 1.2.1 Background -- 1.2.2 Project Overview -- 1.2.3 Strict Environmental Protection Measures -- 1.2.4 Sea Turtle Breeding Center -- 1.2.5 Main Experience of the Project -- 2 Clean Energy -- 2.1 Karot Hydropower Station in Pakistan -- 2.1.1 Background -- 2.1.2 Project Overview -- 2.1.3 Sustainability of Project Financing -- 2.1.4 Strict Administrative Measures for the Environment and Biodiversity -- 2.1.5 Green Construction Measures -- 2.1.6 Building of Supporting Infrastructure -- 2.1.7 Establishment of Permanent Exchange Mechanisms with Local Governments and Communities -- 2.1.8 Boosting Local Employment and Skills Training -- 2.2 Mozura Wind Park in Montenegro -- 2.2.1 Background -- 2.2.2 Project Overview -- 2.2.3 China's "Smart Wind Power" Technology -- 2.2.4 Contribution to Energy Technology Transfer -- 3 Clean Water -- 3.1 Cabinda Water Supply Project in Angola -- 3.1.1 Background -- 3.1.2 Project Overview -- 3.1.3 Strict Measures for Environmental Protection -- 3.1.4 Solution to Surface Runoff and Rainfall Erosion -- 3.1.5 Sound Environmental and Social Benefits -- 3.2 Padma (Jashaldia) Water Treatment Plant Project in Bangladesh -- 3.2.1 Background -- 3.2.2 Project Overview -- 3.2.3 Measures for Pollution Control -- 3.2.4 Application of Green Technology -- 4 Sustainable Traffic -- 4.1 South-North Expressway of Montenegro.
4.1.1 Background -- 4.1.2 Project Overview -- 4.1.3 Green Design Strategies and Technical Solutions -- 4.1.4 Environmental Benefits and Related Experience -- 4.2 Peljesac Cross-Sea Bridge of Croatia -- 4.2.1 Background -- 4.2.2 Project Overview -- 4.2.3 Plan of Green Construction -- 4.2.4 Sound Social Benefit -- 5 Solid Waste Treatment -- 5.1 Can The Waste-To-Energy Plant in Vietnam -- 5.1.1 Background -- 5.1.2 Project Overview -- 5.1.3 Environmental Protection Technologies -- 5.1.4 Boosting Development of the Local Industries and Creating More Jobs -- 5.1.5 Actively Communicating with the Local Governments and Communities -- 6 Sustainable Consumption and Production -- 6.1 FINEX™ Fiber Project -- 6.1.1 Background -- 6.1.2 Project Overview -- 6.1.3 Main Techniques and Applications -- 6.1.4 Environmental Benefits -- 6.2 Yanbu Refinery in Saudi Arabia -- 6.2.1 Background -- 6.2.2 Project Overview -- 6.2.3 Strict Environmental Management System -- 6.2.4 Green Production -- 6.2.5 Promotion of Local Employment -- 7 Green Architecture -- 7.1 Lusail Stadium in Qatar -- 7.1.1 Background -- 7.1.2 Project Overview -- 7.1.3 Establishment of a Strict Environmental Management System to Implement the Project -- 7.1.4 Implementation of the Green Building -- 8 Sustainable Food Production -- 8.1 Zambian Solar-Powered Mill Program -- 8.1.1 Background -- 8.1.2 Project Overview -- 8.1.3 Actions -- 8.1.4 Outcomes -- 8.1.5 Experience and Insights -- 8.2 Wanbao Mozambique Rice Farm -- 8.2.1 Background -- 8.2.2 Project Overview -- 8.2.3 Actions -- 8.2.4 Outcomes -- 8.2.5 Experience and Insights -- 9 Corporate Social Responsibility -- 9.1 Uganda Isimba Hydropower Plant -- 9.1.1 Background -- 9.1.2 Project Overview -- 9.1.3 Environment and Social Management -- 9.1.4 Employment and Training -- 9.1.5 Active Fulfillment of Corporate Social Responsibilities -- 10 Conclusion.
isbn 9789811631887
9789811631870
callnumber-first G - Geography, Anthropology, Recreation
callnumber-subject GE - Environmental Sciences
callnumber-label GE300-350
callnumber-sort GE 3300 3350
genre Electronic books.
genre_facet Electronic books.
url https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6827686
illustrated Not Illustrated
oclc_num 1289856522
work_keys_str_mv AT developmentbriinternationalgreen thebeltandroadinitiativegreendevelopmentcasestudiesreport2020
AT developmentbriinternationalgreen beltandroadinitiativegreendevelopmentcasestudiesreport2020
status_str n
ids_txt_mv (MiAaPQ)5006827686
(Au-PeEL)EBL6827686
(OCoLC)1289856522
carrierType_str_mv cr
is_hierarchy_title The Belt and Road Initiative Green Development Case Studies Report 2020.
marc_error Info : MARC8 translation shorter than ISO-8859-1, choosing MARC8. --- [ 856 : z ]
_version_ 1792331061231878144
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>05645nam a22003853i 4500</leader><controlfield tag="001">5006827686</controlfield><controlfield tag="003">MiAaPQ</controlfield><controlfield tag="005">20240229073845.0</controlfield><controlfield tag="006">m o d | </controlfield><controlfield tag="007">cr cnu||||||||</controlfield><controlfield tag="008">240229s2021 xx o ||||0 eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9789811631887</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">9789811631870</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(MiAaPQ)5006827686</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(Au-PeEL)EBL6827686</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1289856522</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">MiAaPQ</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="e">pn</subfield><subfield code="c">MiAaPQ</subfield><subfield code="d">MiAaPQ</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">GE300-350</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Development, BRI International Green.</subfield></datafield><datafield tag="245" ind1="1" ind2="4"><subfield code="a">The Belt and Road Initiative Green Development Case Studies Report 2020.</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">1st ed.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Singapore :</subfield><subfield code="b">Springer Singapore Pte. Limited,</subfield><subfield code="c">2021.</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">©2022.</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (121 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">Intro -- Preface -- Congratulatory Message -- Advisor Group -- Report Team -- Executive Summary -- Contents -- About the Author -- 1 Biodiversity and Ecological System -- 1.1 Nairobi-Malaba Standard Gauge Railway (Phase I) -- 1.1.1 Background -- 1.1.2 Project Overview -- 1.1.3 Boosting Local Employment and Technological Development -- 1.1.4 Protecting the Migration Corridors of Wildlife -- 1.1.5 Collecting Materials According to Local Conditions to Protect the Rivers -- 1.2 New Container Terminal Project of Tema, Ghana -- 1.2.1 Background -- 1.2.2 Project Overview -- 1.2.3 Strict Environmental Protection Measures -- 1.2.4 Sea Turtle Breeding Center -- 1.2.5 Main Experience of the Project -- 2 Clean Energy -- 2.1 Karot Hydropower Station in Pakistan -- 2.1.1 Background -- 2.1.2 Project Overview -- 2.1.3 Sustainability of Project Financing -- 2.1.4 Strict Administrative Measures for the Environment and Biodiversity -- 2.1.5 Green Construction Measures -- 2.1.6 Building of Supporting Infrastructure -- 2.1.7 Establishment of Permanent Exchange Mechanisms with Local Governments and Communities -- 2.1.8 Boosting Local Employment and Skills Training -- 2.2 Mozura Wind Park in Montenegro -- 2.2.1 Background -- 2.2.2 Project Overview -- 2.2.3 China's "Smart Wind Power" Technology -- 2.2.4 Contribution to Energy Technology Transfer -- 3 Clean Water -- 3.1 Cabinda Water Supply Project in Angola -- 3.1.1 Background -- 3.1.2 Project Overview -- 3.1.3 Strict Measures for Environmental Protection -- 3.1.4 Solution to Surface Runoff and Rainfall Erosion -- 3.1.5 Sound Environmental and Social Benefits -- 3.2 Padma (Jashaldia) Water Treatment Plant Project in Bangladesh -- 3.2.1 Background -- 3.2.2 Project Overview -- 3.2.3 Measures for Pollution Control -- 3.2.4 Application of Green Technology -- 4 Sustainable Traffic -- 4.1 South-North Expressway of Montenegro.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">4.1.1 Background -- 4.1.2 Project Overview -- 4.1.3 Green Design Strategies and Technical Solutions -- 4.1.4 Environmental Benefits and Related Experience -- 4.2 Peljesac Cross-Sea Bridge of Croatia -- 4.2.1 Background -- 4.2.2 Project Overview -- 4.2.3 Plan of Green Construction -- 4.2.4 Sound Social Benefit -- 5 Solid Waste Treatment -- 5.1 Can The Waste-To-Energy Plant in Vietnam -- 5.1.1 Background -- 5.1.2 Project Overview -- 5.1.3 Environmental Protection Technologies -- 5.1.4 Boosting Development of the Local Industries and Creating More Jobs -- 5.1.5 Actively Communicating with the Local Governments and Communities -- 6 Sustainable Consumption and Production -- 6.1 FINEX™ Fiber Project -- 6.1.1 Background -- 6.1.2 Project Overview -- 6.1.3 Main Techniques and Applications -- 6.1.4 Environmental Benefits -- 6.2 Yanbu Refinery in Saudi Arabia -- 6.2.1 Background -- 6.2.2 Project Overview -- 6.2.3 Strict Environmental Management System -- 6.2.4 Green Production -- 6.2.5 Promotion of Local Employment -- 7 Green Architecture -- 7.1 Lusail Stadium in Qatar -- 7.1.1 Background -- 7.1.2 Project Overview -- 7.1.3 Establishment of a Strict Environmental Management System to Implement the Project -- 7.1.4 Implementation of the Green Building -- 8 Sustainable Food Production -- 8.1 Zambian Solar-Powered Mill Program -- 8.1.1 Background -- 8.1.2 Project Overview -- 8.1.3 Actions -- 8.1.4 Outcomes -- 8.1.5 Experience and Insights -- 8.2 Wanbao Mozambique Rice Farm -- 8.2.1 Background -- 8.2.2 Project Overview -- 8.2.3 Actions -- 8.2.4 Outcomes -- 8.2.5 Experience and Insights -- 9 Corporate Social Responsibility -- 9.1 Uganda Isimba Hydropower Plant -- 9.1.1 Background -- 9.1.2 Project Overview -- 9.1.3 Environment and Social Management -- 9.1.4 Employment and Training -- 9.1.5 Active Fulfillment of Corporate Social Responsibilities -- 10 Conclusion.</subfield></datafield><datafield tag="588" ind1=" " ind2=" "><subfield code="a">Description based on publisher supplied metadata and other sources.</subfield></datafield><datafield tag="590" ind1=" " ind2=" "><subfield code="a">Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries. </subfield></datafield><datafield tag="655" ind1=" " ind2="4"><subfield code="a">Electronic books.</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Print version:</subfield><subfield code="a">Development, BRI International Green</subfield><subfield code="t">The Belt and Road Initiative Green Development Case Studies Report 2020</subfield><subfield code="d">Singapore : Springer Singapore Pte. Limited,c2021</subfield><subfield code="z">9789811631870</subfield></datafield><datafield tag="797" ind1="2" ind2=" "><subfield code="a">ProQuest (Firm)</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=6827686</subfield><subfield code="z">Click to View</subfield></datafield></record></collection>