Extension, configuration and the advantages of the shifting bottleneck approach for solving dynamic job shop scheduling problems in production and logistics processes / / Tan Yi.
Saved in:
VerfasserIn: | |
---|---|
Place / Publishing House: | Berlin : : GITO mbH Verlag,, [2017] 2017 |
Year of Publication: | 2017 |
Language: | English |
Online Access: | |
Physical Description: | 1 online resource (116 pages) |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Production scheduling / / edited by Rodrigo da Rosa Righi.
by: da Rosa Righi, Rodrigo
Published: (2012) -
Metaheuristics for production scheduling / edited by Bassem Jarboui, Patrick Siarry, Jacques Teghem ; series editor, Jean-Paul Bourrieres.
Published: (2013.) -
Scheduling problems and solutions / Hussein M. Khodr, editor.
Published: (2012.) -
Scheduling problems : : new applications and trends / / edited by Rodrigo da Rosa Righi.
Published: ([2020]) -
Scheduling theory. / Single-stage systems / / by V. S. Tanaev, V. S. Gordon and Y. M. Shafransky.
by: Tanaev, Viacheslav Sergeevicha,
Published: (1994.)