Incentivizing collaborative BIM-enabled projects : : a synthesis of agency and behavioral approaches / / Chen-Yu Chang, PhD.
Saved in:
VerfasserIn: | |
---|---|
Place / Publishing House: | Newtown Square, Pennsylvania : : Project Management Institute, Inc.,, [2018] 2018 |
Year of Publication: | 2018 |
Language: | English |
Online Access: | |
Physical Description: | 1 online resource (197 pages) |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
5005581013 |
---|---|
ctrlnum |
(MiAaPQ)5005581013 (Au-PeEL)EBL5581013 (OCoLC)1066191631 |
collection |
bib_alma |
record_format |
marc |
spelling |
Chang, Chen-Yu, 1969- author. Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches / Chen-Yu Chang, PhD. Newtown Square, Pennsylvania : Project Management Institute, Inc., [2018] 2018 1 online resource (197 pages) text txt rdacontent computer c rdamedia online resource cr rdacarrier Includes bibliographical references and index. Executive summary -- Introduction -- Literature review -- Analytical framework -- Research method -- Case studies: China -- Empirical investigation: China (1) -- Empirical investigation: China (2) -- Case studies: United Kingdom -- Empirical investigation: United Kingdom -- Case studies: United States -- Empirical investigation: United States. Description based on print version record. Electronic reproduction. Ann Arbor, MI : ProQuest, 2018. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries. Building information modeling. Project management. Electronic books. Print version: Chang, Chen-Yu, 1969- Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches. Newtown Square, Pennsylvania : Project Management Institute, Inc., c2018 197 pages 9781628256239 (DLC) 2018047190 ProQuest (Firm) https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=5581013 Click to View |
language |
English |
format |
eBook |
author |
Chang, Chen-Yu, 1969- |
spellingShingle |
Chang, Chen-Yu, 1969- Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches / Executive summary -- Introduction -- Literature review -- Analytical framework -- Research method -- Case studies: China -- Empirical investigation: China (1) -- Empirical investigation: China (2) -- Case studies: United Kingdom -- Empirical investigation: United Kingdom -- Case studies: United States -- Empirical investigation: United States. |
author_facet |
Chang, Chen-Yu, 1969- |
author_variant |
c y c cyc |
author_role |
VerfasserIn |
author_sort |
Chang, Chen-Yu, 1969- |
title |
Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches / |
title_sub |
a synthesis of agency and behavioral approaches / |
title_full |
Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches / Chen-Yu Chang, PhD. |
title_fullStr |
Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches / Chen-Yu Chang, PhD. |
title_full_unstemmed |
Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches / Chen-Yu Chang, PhD. |
title_auth |
Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches / |
title_new |
Incentivizing collaborative BIM-enabled projects : |
title_sort |
incentivizing collaborative bim-enabled projects : a synthesis of agency and behavioral approaches / |
publisher |
Project Management Institute, Inc., |
publishDate |
2018 |
physical |
1 online resource (197 pages) |
contents |
Executive summary -- Introduction -- Literature review -- Analytical framework -- Research method -- Case studies: China -- Empirical investigation: China (1) -- Empirical investigation: China (2) -- Case studies: United Kingdom -- Empirical investigation: United Kingdom -- Case studies: United States -- Empirical investigation: United States. |
isbn |
9781628256246 (e-book) 9781628256260 (e-book) 9781628256253 (e-book) 9781628256239 |
callnumber-first |
T - Technology |
callnumber-subject |
TH - Building Construction |
callnumber-label |
TH438 |
callnumber-sort |
TH 3438.13 C436 42018 |
genre |
Electronic books. |
genre_facet |
Electronic books. |
url |
https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=5581013 |
illustrated |
Not Illustrated |
dewey-hundreds |
700 - Arts & recreation |
dewey-tens |
720 - Architecture |
dewey-ones |
720 - Architecture |
dewey-full |
720.285 |
dewey-sort |
3720.285 |
dewey-raw |
720.285 |
dewey-search |
720.285 |
oclc_num |
1066191631 |
work_keys_str_mv |
AT changchenyu incentivizingcollaborativebimenabledprojectsasynthesisofagencyandbehavioralapproaches |
status_str |
n |
ids_txt_mv |
(MiAaPQ)5005581013 (Au-PeEL)EBL5581013 (OCoLC)1066191631 |
carrierType_str_mv |
cr |
is_hierarchy_title |
Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches / |
_version_ |
1792330995177881600 |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02220nam a2200433 i 4500</leader><controlfield tag="001">5005581013</controlfield><controlfield tag="003">MiAaPQ</controlfield><controlfield tag="005">20200520144314.0</controlfield><controlfield tag="006">m o d | </controlfield><controlfield tag="007">cr cnu||||||||</controlfield><controlfield tag="008">181213s2018 pau ob 001 0 eng d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">9781628256239</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781628256246 (e-book)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781628256260 (e-book)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781628256253 (e-book)</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(MiAaPQ)5005581013</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(Au-PeEL)EBL5581013</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1066191631</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">MiAaPQ</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="e">pn</subfield><subfield code="c">MiAaPQ</subfield><subfield code="d">MiAaPQ</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TH438.13</subfield><subfield code="b">.C436 2018</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">720.285</subfield><subfield code="2">23</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Chang, Chen-Yu,</subfield><subfield code="d">1969-</subfield><subfield code="e">author.</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Incentivizing collaborative BIM-enabled projects :</subfield><subfield code="b">a synthesis of agency and behavioral approaches /</subfield><subfield code="c">Chen-Yu Chang, PhD.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Newtown Square, Pennsylvania :</subfield><subfield code="b">Project Management Institute, Inc.,</subfield><subfield code="c">[2018]</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">2018</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (197 pages)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="504" ind1=" " ind2=" "><subfield code="a">Includes bibliographical references and index.</subfield></datafield><datafield tag="505" ind1="0" ind2=" "><subfield code="a">Executive summary -- Introduction -- Literature review -- Analytical framework -- Research method -- Case studies: China -- Empirical investigation: China (1) -- Empirical investigation: China (2) -- Case studies: United Kingdom -- Empirical investigation: United Kingdom -- Case studies: United States -- Empirical investigation: United States.</subfield></datafield><datafield tag="588" ind1=" " ind2=" "><subfield code="a">Description based on print version record.</subfield></datafield><datafield tag="590" ind1=" " ind2=" "><subfield code="a">Electronic reproduction. Ann Arbor, MI : ProQuest, 2018. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Building information modeling.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Project management.</subfield></datafield><datafield tag="655" ind1=" " ind2="4"><subfield code="a">Electronic books.</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Print version:</subfield><subfield code="a">Chang, Chen-Yu, 1969-</subfield><subfield code="t">Incentivizing collaborative BIM-enabled projects : a synthesis of agency and behavioral approaches.</subfield><subfield code="d">Newtown Square, Pennsylvania : Project Management Institute, Inc., c2018 </subfield><subfield code="h">197 pages </subfield><subfield code="z">9781628256239 </subfield><subfield code="w">(DLC) 2018047190</subfield></datafield><datafield tag="797" ind1="2" ind2=" "><subfield code="a">ProQuest (Firm)</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=5581013</subfield><subfield code="z">Click to View</subfield></datafield></record></collection> |