Guidelines for Integrating Process Safety into Engineering Projects.

Saved in:
Bibliographic Details
Place / Publishing House:Newark : : John Wiley & Sons, Incorporated,, 2018.
Ã2019.
Year of Publication:2018
Edition:1st ed.
Language:English
Online Access:
Physical Description:1 online resource (423 pages)
Tags: Add Tag
No Tags, Be the first to tag this record!
Table of Contents:
  • Intro
  • GUIDELINES FOR INTEGRATING PROCESS SAFETY INTO ENGINEERING PROJECTS
  • Contents
  • List of Figures
  • List of Tables
  • Acronyms and Abbreviations
  • Glossary
  • Acknowledgments
  • Files on the Web
  • Preface
  • 1 INTRODUCTION
  • 1.1 Background and Scope
  • 1.2 Why Integrating Process Safety is Important
  • 1.3 What Type of Projects Are Included?
  • 1.4 Project Life Cycle
  • 1.5 Relationship to Other Programs
  • 1.6 Structure of this Document
  • 2 PROJECT MANAGEMENT CONCEPTS AND PRINCIPLES
  • 2.1 Common Principles and Structure
  • 2.1.1 Statement of Requirements
  • 2.1.2 Project Scope
  • 2.1.3 Basis of Design
  • 2.1.4 Project Budget
  • 2.1.5 Project Plan
  • 2.1.6 Project Life Cycle
  • 2.2 Project Management
  • 2.3 Project Governance
  • 2.4 Types of Project
  • 2.4.1 Greenfield Projects
  • 2.4.2 Brownfield Projects
  • 2.4.3 Retrofit / Expansion Projects
  • 2.4.4 Control System Upgrade Projects
  • 2.4.5 Demolition Projects
  • 2.4.6 Management of Change Projects
  • 2.4.7 Mothballing Projects
  • 2.4.8 Re-Commissioning Projects
  • 2.4.9 Restarting a Project
  • 2.4.10 Post-Incident Projects
  • 2.5 Project Organization
  • 2.5.1 Pre-Project Team
  • 2.5.2 Typical Project Team
  • 2.5.3 Unit Based Team
  • 2.5.4 Equipment Based Team
  • 2.5.5 Site Based Team
  • 2.5.6 Small Projects
  • 2.5.7 Roles and Responsibilities
  • 2.6 Strategies for Implementation
  • 2.6.1 Contractor Selection
  • 2.6.2 Engineering Only
  • 2.6.3 Engineering and Procurement
  • 2.6.4 Engineering, Procurement and Construction
  • 2.6.5 Operation
  • 2.6.6 Contractor Oversight
  • 2.7 Risk Management
  • 2.8 Project Controls
  • 2.8.1 Planning and Progress
  • 2.8.2 Estimates, Budgets and Cost Control
  • 2.8.3 Reporting
  • 2.8.4 Metrics
  • 2.8.5 Action Tracking
  • 2.8.6 Change Management
  • 2.9 Other Considerations
  • 2.9.1 Materials Management
  • 2.9.2 Quality Management.
  • 2.9.3 Lessons Learned
  • 2.9.4 Post-Project Close-Out
  • 2.10 Stage Gate Reviews
  • 3 FRONT END LOADING 1
  • 3.1 Preliminary Hazard Identification
  • 3.2 Preliminary Inherently Safer Design Review
  • 3.3 Concept Risk Analysis
  • 3.4 Other Activities
  • 3.4.1 Process Safety and EHS Plan
  • 3.4.2 Risk Register
  • 3.4.3 Action Tracking
  • 3.5 Stage Gate Review
  • 3.6 Summary
  • 4 FRONT END LOADING 2
  • 4.1 Evaluation of Development Options
  • 4.1.1 Hazard Identification
  • 4.1.2 Preliminary Inherently Safer Design Review
  • 4.1.3 Concept Risk Analysis
  • 4.1.4 Selection of the Development Option
  • 4.2 Further Definition of the Selected Option
  • 4.2.1 Design Hazard Management Process
  • 4.2.2 Preliminary Inherently Safer Design (ISD)
  • 4.2.3 Hazard Identification and Risk Analysis (HIRA)
  • 4.2.4 Engineering Design Regulations, Codes, and Standards
  • 4.2.5 Design Philosophies/Strategies
  • 4.2.6 Preliminary Facility Siting Study
  • 4.2.7 Preliminary Fire and Explosion Analysis
  • 4.2.8 Transportation Studies
  • 4.2.9 Preliminary Blowdown and Depressurization Study
  • 4.2.10 Preliminary Fire &amp
  • Gas Detection Study
  • 4.2.11 Preliminary Fire Hazard Analysis
  • 4.2.12 Preliminary Firewater Analysis
  • 4.2.13 Preliminary Security Vulnerability Analysis
  • 4.2.14 Other Engineering Design Considerations
  • 4.3 Other Activities
  • 4.3.1 EHS and Process Safety Plan
  • 4.3.2 Risk Register
  • 4.3.3 Action Tracking
  • 4.3.4 HIRA Strategy
  • 4.3.5 Documentation
  • 4.3.6 Stage Gate Review
  • 4.4 Summary
  • 5 FRONT END LOADING 3
  • 5.1 Evaluation of Development Options
  • 5.2 Further Definition of the Selected Option
  • 5.2.1 Design Hazard Management Process
  • 5.2.2 Inherently Safer Design Optimization
  • 5.2.3 Facility Siting and Layout
  • 5.2.4 Refine Design Safety Measures
  • 5.2.5 Set Performance Standards.
  • 5.2.6 Hazard Identification and Risk Analysis (HIRA)
  • 5.2.7 Safety Assessments
  • 5.2.8 Re-Evaluate Major Accident Risk
  • 5.2.9 Finalize Important Safety Decisions
  • 5.2.10 Finalize Basis of Design
  • 5.3 Other Engineering Considerations
  • 5.3.1 Asset Integrity Management
  • 5.3.2 Quality Management
  • 5.3.3 Contractor Selection
  • 5.3.4 Brownfield Developments
  • 5.4 Other Activities
  • 5.4.1 EHS and Process Safety Plans
  • 5.4.2 Risk Register
  • 5.4.3 Action Tracking
  • 5.4.4 Change Management
  • 5.4.5 Documentation
  • 5.4.6 Preparation for Project Execution
  • 5.5 Case for Safety
  • 5.6 Stage Gate Review
  • 5.7 Summary
  • 6 DETAILED DESIGN STAGE
  • 6.1 Detailed Design
  • 6.1.1 Design Hazard Management Process
  • 6.1.2 Inherently Safer Design Optimization
  • 6.1.3 Site Layout
  • 6.1.4 Design Safety Measures
  • 6.1.5 Set Performance Standards
  • 6.1.6 Hazard Identification and Risk Analysis (HIRA)
  • 6.1.7 Safety Assessments
  • 6.1.8 Re-Evaluate Major Accident Risk
  • 6.1.9 Other Design Reviews
  • 6.2 Procurement
  • 6.3 Asset Integrity Management
  • 6.4 Other Process Safety Activities
  • 6.4.1 Case For Safety
  • 6.5 Other Project Activities
  • 6.5.1 EHS and Process Safety Plans
  • 6.5.2 Risk Register
  • 6.5.3 Action Tracking
  • 6.5.4 Change Management
  • 6.5.5 Documentation
  • 6.5.6 Constructability
  • 6.5.7 Contractor Selection
  • 6.6 Preparation for Construction
  • 6.7 Preparation for Pre-Commissioning, Commissioning, and Startup
  • 6.8 Stage Gate Review
  • 6.9 Summary
  • 7 CONSTRUCTION
  • 7.1 Planning
  • 7.2 Pre-Mobilization
  • 7.3 Mobilization
  • 7.4 Execution
  • 7.4.1 Procurement
  • 7.4.2 Fabrication
  • 7.4.3 Safety Culture
  • 7.4.4 Workforce Involvement
  • 7.4.5 Stakeholder Outreach
  • 7.4.6 Contractor Management
  • 7.4.7 Transportation
  • 7.4.8 Equipment and Materials Handling
  • 7.4.9 Hazard Evaluation
  • 7.4.10 Engineering Design.
  • 7.4.11 Safe Work Practices
  • 7.4.12 Operating, EHS and Process Safety Procedures
  • 7.4.13 Training and Competence Assurance
  • 7.4.14 Asset Integrity Management
  • 7.4.15 Change Management
  • 7.4.16 Emergency Response
  • 7.4.17 Incident Investigation
  • 7.4.18 Auditing
  • 7.4.19 Performance Measurement
  • 7.4.20 Operations Case for Safety
  • 7.4.21 Pre-Commissioning
  • 7.4.22 Mechanical Completion
  • 7.4.23 Documentation
  • 7.5 Other Project Activities
  • 7.5.1 EHS and Process Safety Plans
  • 7.5.2 Risk Register
  • 7.5.3 Action Tracking
  • 7.5.4 General Construction Management
  • 7.6 De-Mobilization
  • 7.7 Preparation for Commissioning and Startup
  • 7.8 Final Evaluation and Close-out
  • 7.9 Stage Gate Review
  • 7.10 Summary
  • 8 QUALITY MANAGEMENT
  • 8.1 Design/Engineering
  • 8.2 Procurement
  • 8.3 Fabrication
  • 8.4 Receipt
  • 8.5 Storage and Retrieval
  • 8.6 Construction and Installation
  • 8.7 Operation
  • 8.8 Documentation
  • 8.9 Summary
  • 9 COMMISSIONING AND STARTUP
  • 9.1 Preparation
  • 9.1.1 Planning
  • 9.1.2 Safety
  • 9.2 Operational Readiness
  • 9.2.1 Pre-Startup Stage Gate Review
  • 9.2.2 Operational Readiness Review
  • 9.2.3 Start-Up Efficiency Review
  • 9.3 Commissioning
  • 9.3.1 Equipment Testing
  • 9.3.2 Commissioning Procedures
  • 9.4 Startup
  • 9.4.1 Preparation for Startup
  • 9.4.2 Calibration of Instruments and Analyzers
  • 9.4.3 Startup with Process Chemicals/Fluids
  • 9.5 Common Process Safety Elements
  • 9.5.1 Hazard Evaluation
  • 9.5.2 Safe Work Practices
  • 9.5.3 Procedures
  • 9.5.4 Training and Competence Assurance
  • 9.5.5 Management of Change
  • 9.5.6 Incident Investigation
  • 9.5.7 Emergency Response
  • 9.5.8 Auditing
  • 9.5.9 Documentation
  • 9.5.10 Performance Measurement
  • 9.6 Other Project Activities
  • 9.6.1 EHS and Process Safety Plans
  • 9.6.2 Risk Register
  • 9.6.3 Action Tracking
  • 9.7 Performance Test Runs.
  • 9.8 Handover
  • 9.9 Preparation for Ongoing Operation
  • 9.10 Project Close-Out
  • 9.10.1 Close Out Report
  • 9.10.2 Post-Project Evaluation
  • 9.11 Summary
  • 10 OPERATION
  • 10.1 Process Safety Management System
  • 10.1.1 Process Safety Culture
  • 10.1.2 Compliance with Standards
  • 10.1.3 Process Safety Competency
  • 10.1.4 Workforce Involvement
  • 10.1.5 Stakeholder Outreach
  • 10.1.6 Process Knowledge Management
  • 10.1.7 Hazard Identification and Risk Analysis
  • 10.1.8 Operating Procedures
  • 10.1.9 Safe Work Practices
  • 10.1.10 Asset Integrity and Reliability
  • 10.1.11 Contractor Management
  • 10.1.12 Training and Performance Assurance
  • 10.1.13 Management of Change
  • 10.1.14 Operational Readiness
  • 10.1.15 Conduct of Operations
  • 10.1.16 Emergency Management
  • 10.1.17 Incident Investigation
  • 10.1.18 Measurement and Metrics
  • 10.1.19 Auditing
  • 10.1.20 Management Review and Continuous Improvement
  • 10.1.21 EHS and Process Safety Procedures
  • 10.2 Other Project Activities
  • 10.2.1 EHS and Process Safety Plans
  • 10.2.2 Risk Register
  • 10.2.3 Action Tracking
  • 10.3 Technical Support
  • 10.4 Performance Test Runs
  • 10.5 Operation Stage Gate Review
  • 10.6 Post-Operational Review
  • 10.7 Project Close-Out
  • 10.8 Summary
  • 11 END OF LIFE
  • 11.1 Design for Decommissioning
  • 11.2 Planning for Decommissioning
  • 11.2.1 Engineering Survey
  • 11.2.2 Hazard Evaluation
  • 11.2.3 Hazardous Materials
  • 11.2.4 Process Safety Plan
  • 11.2.5 Utilities
  • 11.2.6 Re-Engineering
  • 11.3 Decommissioning Procedures
  • 11.3.1 Late-Life Operations
  • 11.3.2 Cessation of Production
  • 11.3.3 Cleaning and Decontamination
  • 11.3.4 Mothballed Facilities And Equipment
  • 11.4 Deconstruction and Demolition
  • 11.4.1 Deconstruction
  • 11.4.2 Demolition
  • 11.5 Process Safety for Decommissioning
  • 11.5.1 Contractor Management
  • 11.5.2 Safety Culture.
  • 11.5.3 Workforce Involvement.