The role of communication in large infrastructure : the Bumbuna Hydroelectric Project in post-conflict Sierra Leone / / Leonardo Mazzei, Gianmarco Scuppa.

Saved in:
Bibliographic Details
Superior document:World Bank working paper, no. 84
:
TeilnehmendeR:
Year of Publication:2006
Language:English
Series:World Bank working paper ; no. 84.
Online Access:
Physical Description:xi, 42 p.
Tags: Add Tag
No Tags, Be the first to tag this record!
id 500459590
ctrlnum (MiAaPQ)500459590
(Au-PeEL)EBL459590
(CaPaEBR)ebr10132033
(CaONFJC)MIL51635
(OCoLC)70710014
collection bib_alma
record_format marc
spelling Mazzei, Leonardo, 1973-
The role of communication in large infrastructure [electronic resource] : the Bumbuna Hydroelectric Project in post-conflict Sierra Leone / Leonardo Mazzei, Gianmarco Scuppa.
Washington, DC : World Bank, 2006.
xi, 42 p.
World Bank working paper, 1726-5878 ; no. 84
Includes bibliographical references.
Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.
Bumbuna Hydroelectric Project.
Infrastructure (Economics) Sierra Leone.
Communication in rural development Sierra Leone.
Water-power Sierra Leone.
Hydroelectric power plants Sierra Leone.
Electronic books.
Scuppa, Gianmarco, 1967-
World Bank.
ProQuest (Firm)
World Bank working paper ; no. 84.
https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=459590 Click to View
language English
format Electronic
eBook
author Mazzei, Leonardo, 1973-
spellingShingle Mazzei, Leonardo, 1973-
The role of communication in large infrastructure the Bumbuna Hydroelectric Project in post-conflict Sierra Leone /
World Bank working paper,
author_facet Mazzei, Leonardo, 1973-
Scuppa, Gianmarco, 1967-
World Bank.
ProQuest (Firm)
World Bank.
ProQuest (Firm)
author_variant l m lm
author2 Scuppa, Gianmarco, 1967-
World Bank.
ProQuest (Firm)
author2_variant g s gs
author2_role TeilnehmendeR
TeilnehmendeR
TeilnehmendeR
author_corporate World Bank.
ProQuest (Firm)
author_sort Mazzei, Leonardo, 1973-
title The role of communication in large infrastructure the Bumbuna Hydroelectric Project in post-conflict Sierra Leone /
title_sub the Bumbuna Hydroelectric Project in post-conflict Sierra Leone /
title_full The role of communication in large infrastructure [electronic resource] : the Bumbuna Hydroelectric Project in post-conflict Sierra Leone / Leonardo Mazzei, Gianmarco Scuppa.
title_fullStr The role of communication in large infrastructure [electronic resource] : the Bumbuna Hydroelectric Project in post-conflict Sierra Leone / Leonardo Mazzei, Gianmarco Scuppa.
title_full_unstemmed The role of communication in large infrastructure [electronic resource] : the Bumbuna Hydroelectric Project in post-conflict Sierra Leone / Leonardo Mazzei, Gianmarco Scuppa.
title_auth The role of communication in large infrastructure the Bumbuna Hydroelectric Project in post-conflict Sierra Leone /
title_new The role of communication in large infrastructure
title_sort the role of communication in large infrastructure the bumbuna hydroelectric project in post-conflict sierra leone /
series World Bank working paper,
series2 World Bank working paper,
publisher World Bank,
publishDate 2006
physical xi, 42 p.
issn 1726-5878 ;
callnumber-first H - Social Science
callnumber-subject HC - Economic History and Conditions
callnumber-label HC1065
callnumber-sort HC 41065 Z9 C36 42006
genre Electronic books.
genre_facet Electronic books.
geographic_facet Sierra Leone.
url https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=459590
illustrated Not Illustrated
dewey-hundreds 300 - Social sciences
dewey-tens 330 - Economics
dewey-ones 333 - Economics of land & energy
dewey-full 333.91/409664
dewey-sort 3333.91 6409664
dewey-raw 333.91/409664
dewey-search 333.91/409664
oclc_num 70710014
work_keys_str_mv AT mazzeileonardo theroleofcommunicationinlargeinfrastructurethebumbunahydroelectricprojectinpostconflictsierraleone
AT scuppagianmarco theroleofcommunicationinlargeinfrastructurethebumbunahydroelectricprojectinpostconflictsierraleone
AT worldbank theroleofcommunicationinlargeinfrastructurethebumbunahydroelectricprojectinpostconflictsierraleone
AT proquestfirm theroleofcommunicationinlargeinfrastructurethebumbunahydroelectricprojectinpostconflictsierraleone
AT mazzeileonardo roleofcommunicationinlargeinfrastructurethebumbunahydroelectricprojectinpostconflictsierraleone
AT scuppagianmarco roleofcommunicationinlargeinfrastructurethebumbunahydroelectricprojectinpostconflictsierraleone
AT worldbank roleofcommunicationinlargeinfrastructurethebumbunahydroelectricprojectinpostconflictsierraleone
AT proquestfirm roleofcommunicationinlargeinfrastructurethebumbunahydroelectricprojectinpostconflictsierraleone
status_str n
ids_txt_mv (MiAaPQ)500459590
(Au-PeEL)EBL459590
(CaPaEBR)ebr10132033
(CaONFJC)MIL51635
(OCoLC)70710014
hierarchy_parent_title World Bank working paper, no. 84
hierarchy_sequence no. 84.
is_hierarchy_title The role of communication in large infrastructure the Bumbuna Hydroelectric Project in post-conflict Sierra Leone /
container_title World Bank working paper, no. 84
author2_original_writing_str_mv noLinkedField
noLinkedField
noLinkedField
_version_ 1792330694411681792
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01723nam a2200445Ia 4500</leader><controlfield tag="001">500459590</controlfield><controlfield tag="003">MiAaPQ</controlfield><controlfield tag="005">20200520144314.0</controlfield><controlfield tag="006">m o d | </controlfield><controlfield tag="007">cr cn|||||||||</controlfield><controlfield tag="008">060524s2006 dcu sb i000 0 eng d</controlfield><datafield tag="010" ind1=" " ind2=" "><subfield code="z"> 2006047376</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">0821366823</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">0821366831</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(MiAaPQ)500459590</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(Au-PeEL)EBL459590</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(CaPaEBR)ebr10132033</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(CaONFJC)MIL51635</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)70710014</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">MiAaPQ</subfield><subfield code="c">MiAaPQ</subfield><subfield code="d">MiAaPQ</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">HC1065.Z9</subfield><subfield code="b">C36 2006</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">333.91/409664</subfield><subfield code="2">22</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Mazzei, Leonardo,</subfield><subfield code="d">1973-</subfield></datafield><datafield tag="245" ind1="1" ind2="4"><subfield code="a">The role of communication in large infrastructure</subfield><subfield code="h">[electronic resource] :</subfield><subfield code="b">the Bumbuna Hydroelectric Project in post-conflict Sierra Leone /</subfield><subfield code="c">Leonardo Mazzei, Gianmarco Scuppa.</subfield></datafield><datafield tag="260" ind1=" " ind2=" "><subfield code="a">Washington, DC :</subfield><subfield code="b">World Bank,</subfield><subfield code="c">2006.</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">xi, 42 p.</subfield></datafield><datafield tag="490" ind1="1" ind2=" "><subfield code="a">World Bank working paper,</subfield><subfield code="x">1726-5878 ;</subfield><subfield code="v">no. 84</subfield></datafield><datafield tag="504" ind1=" " ind2=" "><subfield code="a">Includes bibliographical references.</subfield></datafield><datafield tag="533" ind1=" " ind2=" "><subfield code="a">Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.</subfield></datafield><datafield tag="610" ind1="2" ind2="0"><subfield code="a">Bumbuna Hydroelectric Project.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Infrastructure (Economics)</subfield><subfield code="z">Sierra Leone.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Communication in rural development</subfield><subfield code="z">Sierra Leone.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Water-power</subfield><subfield code="z">Sierra Leone.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Hydroelectric power plants</subfield><subfield code="z">Sierra Leone.</subfield></datafield><datafield tag="655" ind1=" " ind2="4"><subfield code="a">Electronic books.</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Scuppa, Gianmarco,</subfield><subfield code="d">1967-</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">World Bank.</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">ProQuest (Firm)</subfield></datafield><datafield tag="830" ind1=" " ind2="0"><subfield code="a">World Bank working paper ;</subfield><subfield code="v">no. 84.</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=459590</subfield><subfield code="z">Click to View</subfield></datafield></record></collection>