AIChE equipment testing procedure. : a guide to performance evaluation / / Trayed & packed columns : / Equipment Testing Procedures Committee of the American Institute of Chemical Engineers.

"Provides a cost-effective and reliable reference for improving the performance of new and existing process equipment Step-by-step procedures are flexible enough to be applied in a number of industrial applications "--

Saved in:
Bibliographic Details
:
TeilnehmendeR:
Place / Publishing House:Hoboken : : Wiley-AIChE,, [2014]
2014
Year of Publication:2014
Edition:Third edition.
Language:English
Online Access:
Physical Description:1 online resource (152 pages) :; illustrations
Tags: Add Tag
No Tags, Be the first to tag this record!
id 5001629182
ctrlnum (MiAaPQ)5001629182
(Au-PeEL)EBL1629182
(CaPaEBR)ebr10837589
(CaONFJC)MIL573962
(OCoLC)870586901
collection bib_alma
record_format marc
spelling AIChE equipment testing procedure. Trayed & packed columns : a guide to performance evaluation / Equipment Testing Procedures Committee of the American Institute of Chemical Engineers.
Trayed & packed columns
Trayed and packed columns
Third edition.
Hoboken : Wiley-AIChE, [2014]
2014
1 online resource (152 pages) : illustrations
text rdacontent
computer rdamedia
online resource rdacarrier
Includes bibliographical references and index.
Machine generated contents note: 100.0 PURPOSE & SCOPE 1 101.0 Purpose 1 102.0 Scope 1 200.0 DEFINITION AND DESCRIPTION OF TERMS 2 201.0 Flow Quantities 2 202.0 Key Components 3 203.0 Mass Transfer Efficiency 4 203.1 Theoretical Trays or Plates or Stages 4 203.2 Overall Column Efficiency 4 203.3 Apparent Murphree Tray Efficiency 4 203.4 Ideal Murphree Tray Efficiency 4 203.5 Murphree Point Efficiency 4 203.6 HETP 4 203.7 HTU 4 203.8 NTU 4 204.0 Operating Lines 5 205.0 Pinch 5 206.0 Maximum Throughput 5 206.1 Maximum Hydraulic Throughput 5 206.2 Maximum Operational Capacity 5 206.3 Maximum Efficient Capacity 5 207.0 Minimum Operating Rate 5 208.0 Operating Section 5 209.0 Hardware 6 209.1 Components of a Trayed Column 6 209.2 Components of a Packed Column 7 300.0 TEST PLANNING 9 301.0 Preliminary Preparation 9 301.1 Safety 10 301.2 Environmental Considerations 10 301.3 Test Objectives 10 301.4 Organizational Resources 10 301.5 Schedule 10 301.6 Review of Historic Operating Data 10 302.0 Column Control and Instrumentation 11 303.0 Peripheral Equipment 11 304.0 Pre-test Calculations 11 304.1 Process Simulation 11 304.2 Dry Run 11 305.0 Types of Tests 12 305.1 Performance Tests 12 305.2 Acceptance Tests 12 306.0 Specific Areas of Interest 12 306.1 Packing Efficiencies 12 306.2 Tray Efficiencies 12 306.3 Overall Column Efficiency 13 306.4 Capacity Limitations 13 307.0 Energy Consumption 14 308.0 Pressure Drop Restrictions 15 309.0 Data Collection Requirements 15 309.1 Process Operating Data 15 309.2 Gamma Scan Data 15 310.0 Conditions of External Streams 18 310.1 Overall and Component Material Balances 18 310.2 Overall Enthalpy Balances 18 311.0 Internal Temperatures 18 311.1 Heat Balances 18 311.2 Internal Profiles 18 312.0 Internal Samples 20 312.1 Internal Samples for Efficiency Checks 20 312.2 Internal Samples for Overall Performance 20 313.0 Pressure Profiles 20 314.0 Data Requirements-Physical Properties 20 314.1 Test Mixtures 20 314.2 Essential Data 21 315.0 Auxiliary Data 21 316.0 Test Procedure Documentation 21 400.0 METHODS OF MEASUREMENT AND SAMPLING 22 401.0 System Controls and Operating Stability 22 402.0 Measurement of Temperatures 22 402.1 Accuracy 22 402.2 Errors 22 403.0 Measurement of Flow Rates 24 403.1 Orifice Meters 24 403.2 Rotameters 25 403.3 Vortex Flow Meters 25 403.4 Coriolis Flow Meters 25 403.5 Magnetic Flow Meters 25 403.6 Pitot Tube (or Annubar) 25 403.7 Direct Volume or Weight Measurement 26 404.0 Measurement of Column Pressure Drop 26 404.1 Instrument 26 404.2 Pressure Taps 26 404.3 Seal Pots 33 404.4 Leakage Check 33 404.5 Accuracy 33 405.0 Sampling Procedure 34 405.1 General 34 405.2 Selection of Sampling Points 34 405.3 Sample Connections 35 405.4 Containers 35 405.5 Sampling of High Boiling Materials 36 405.6 Sampling of Intermediate Boiling Materials 37 405.7 Sampling of Materials Having Boiling Points Below -50°F (-46°C) 40 405.8 Leakage Check 41 405.9 Labeling and Handling the Samples 41 500.0 TEST PROCEDURE 43 501.0 Preliminary 43 502.0 Test Procedure for Maximum Hydraulic Throughput 43 502.1 Flood Symptoms 44 502.2 Performing Capacity Tests 45 502.3 Optional Test Technique - Gamma Scanning 48 503.0 Considerations Affecting Efficiency Test Procedure 48 503.1 Rigorous Versus Shortcut Efficiency Tests 48 503.2 Strategy of Efficiency Testing 49 503.3 Early Preparation for Efficiency Tests 50 503.4 Last-minute Preparations for Efficiency Tests 53 503.5 Establishment of Steady State Conditions 55 503.6 The Test Day 56 503.7 Concluding Test 56 600.0 COMPUTATION OF RESULTS 601.0 Verification of Test Data and Simulation Models 58 602.0 Material Balance 59 602.1 End Effects 59 603.0 Enthalpy Balance 59 603.1 Overall Balance 59 603.2 Internal Flow Rates 60 604.0 Hydraulic Performance 60 604.1 Trayed Column 60 604.2 Packed Column 61 605.0 Efficiency Performance 61 605.1 Trayed Column 62 605.2 Packed Column 69 700.0 INTERPRETATION OF RESULTS 76 701.0 Sources of Experimental Error 76 701.1 Material and Enthalpy Balances 77 702.0 Effects of Experimental Error 78 703.0 Design versus Performance 78 703.1 Mechanical/Tower Equipment 78 703.2 Process Conditions 78 704.0 Hydraulic Performance 79 704.1 Mechanical/Tower Equipment 79 704.2 Tray 79 704.3 Packing 80 704.4 Process Conditions 80 705.0 Mass Transfer Performance 81 705.1 Mechanical/Tower Equipment 81 705.2 Tray 81 705.3 Packing 82 705.4 Maldistribution 82 705.5 Process 84 706.0 Test Troubleshooting 85 706.1 Analysis Procedure 85 706.2 Sampling 85 706.3 Equilibrium Data 85 706.4 Temperature Measurements 85 706.5 Heat and Material Balances 86 706.6 Fluctuation of Process Conditions 86 706.7 Pressure Drop Measurements 86 706.8 Incorrect Prediction of Pressure Drop 86 706.9 Errors in Assumptions in Modeling Mass Transfer 86 706.10 Multicomponent Systems Deviate from Binary Data 87 706.11 High Purity Separation 87 706.12 Test and Design Conditions 87 800.0 APPENDIX 88 801.0 Notation 88 801.1 Greek Symbols 90 802.0 Sample Calculations 90 802.1 General Analysis of Test Data 90 802.2 Packed Column 91 802.3 Trayed Column 107 803.0 References 126.
"Provides a cost-effective and reliable reference for improving the performance of new and existing process equipment Step-by-step procedures are flexible enough to be applied in a number of industrial applications "-- Provided by publisher.
Description based on print version record.
Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.
Plate towers Evaluation.
Plate towers Testing.
Electronic books.
American Institute of Chemical Engineers. Equipment Testing Procedures Committee.
Print version: AIChE equipment testing procedure. Trayed & packed columns : a guide to performance evaluation. Hoboken : Wiley-AIChE, [2014] 9781118627716 (DLC) 2013042725
ProQuest (Firm)
https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=1629182 Click to View
language English
format eBook
author2 American Institute of Chemical Engineers. Equipment Testing Procedures Committee.
author_facet American Institute of Chemical Engineers. Equipment Testing Procedures Committee.
American Institute of Chemical Engineers. Equipment Testing Procedures Committee.
author2_role TeilnehmendeR
author_corporate American Institute of Chemical Engineers. Equipment Testing Procedures Committee.
title AIChE equipment testing procedure. a guide to performance evaluation /
spellingShingle AIChE equipment testing procedure. a guide to performance evaluation /
Machine generated contents note: 100.0 PURPOSE & SCOPE 1 101.0 Purpose 1 102.0 Scope 1 200.0 DEFINITION AND DESCRIPTION OF TERMS 2 201.0 Flow Quantities 2 202.0 Key Components 3 203.0 Mass Transfer Efficiency 4 203.1 Theoretical Trays or Plates or Stages 4 203.2 Overall Column Efficiency 4 203.3 Apparent Murphree Tray Efficiency 4 203.4 Ideal Murphree Tray Efficiency 4 203.5 Murphree Point Efficiency 4 203.6 HETP 4 203.7 HTU 4 203.8 NTU 4 204.0 Operating Lines 5 205.0 Pinch 5 206.0 Maximum Throughput 5 206.1 Maximum Hydraulic Throughput 5 206.2 Maximum Operational Capacity 5 206.3 Maximum Efficient Capacity 5 207.0 Minimum Operating Rate 5 208.0 Operating Section 5 209.0 Hardware 6 209.1 Components of a Trayed Column 6 209.2 Components of a Packed Column 7 300.0 TEST PLANNING 9 301.0 Preliminary Preparation 9 301.1 Safety 10 301.2 Environmental Considerations 10 301.3 Test Objectives 10 301.4 Organizational Resources 10 301.5 Schedule 10 301.6 Review of Historic Operating Data 10 302.0 Column Control and Instrumentation 11 303.0 Peripheral Equipment 11 304.0 Pre-test Calculations 11 304.1 Process Simulation 11 304.2 Dry Run 11 305.0 Types of Tests 12 305.1 Performance Tests 12 305.2 Acceptance Tests 12 306.0 Specific Areas of Interest 12 306.1 Packing Efficiencies 12 306.2 Tray Efficiencies 12 306.3 Overall Column Efficiency 13 306.4 Capacity Limitations 13 307.0 Energy Consumption 14 308.0 Pressure Drop Restrictions 15 309.0 Data Collection Requirements 15 309.1 Process Operating Data 15 309.2 Gamma Scan Data 15 310.0 Conditions of External Streams 18 310.1 Overall and Component Material Balances 18 310.2 Overall Enthalpy Balances 18 311.0 Internal Temperatures 18 311.1 Heat Balances 18 311.2 Internal Profiles 18 312.0 Internal Samples 20 312.1 Internal Samples for Efficiency Checks 20 312.2 Internal Samples for Overall Performance 20 313.0 Pressure Profiles 20 314.0 Data Requirements-Physical Properties 20 314.1 Test Mixtures 20 314.2 Essential Data 21 315.0 Auxiliary Data 21 316.0 Test Procedure Documentation 21 400.0 METHODS OF MEASUREMENT AND SAMPLING 22 401.0 System Controls and Operating Stability 22 402.0 Measurement of Temperatures 22 402.1 Accuracy 22 402.2 Errors 22 403.0 Measurement of Flow Rates 24 403.1 Orifice Meters 24 403.2 Rotameters 25 403.3 Vortex Flow Meters 25 403.4 Coriolis Flow Meters 25 403.5 Magnetic Flow Meters 25 403.6 Pitot Tube (or Annubar) 25 403.7 Direct Volume or Weight Measurement 26 404.0 Measurement of Column Pressure Drop 26 404.1 Instrument 26 404.2 Pressure Taps 26 404.3 Seal Pots 33 404.4 Leakage Check 33 404.5 Accuracy 33 405.0 Sampling Procedure 34 405.1 General 34 405.2 Selection of Sampling Points 34 405.3 Sample Connections 35 405.4 Containers 35 405.5 Sampling of High Boiling Materials 36 405.6 Sampling of Intermediate Boiling Materials 37 405.7 Sampling of Materials Having Boiling Points Below -50°F (-46°C) 40 405.8 Leakage Check 41 405.9 Labeling and Handling the Samples 41 500.0 TEST PROCEDURE 43 501.0 Preliminary 43 502.0 Test Procedure for Maximum Hydraulic Throughput 43 502.1 Flood Symptoms 44 502.2 Performing Capacity Tests 45 502.3 Optional Test Technique - Gamma Scanning 48 503.0 Considerations Affecting Efficiency Test Procedure 48 503.1 Rigorous Versus Shortcut Efficiency Tests 48 503.2 Strategy of Efficiency Testing 49 503.3 Early Preparation for Efficiency Tests 50 503.4 Last-minute Preparations for Efficiency Tests 53 503.5 Establishment of Steady State Conditions 55 503.6 The Test Day 56 503.7 Concluding Test 56 600.0 COMPUTATION OF RESULTS 601.0 Verification of Test Data and Simulation Models 58 602.0 Material Balance 59 602.1 End Effects 59 603.0 Enthalpy Balance 59 603.1 Overall Balance 59 603.2 Internal Flow Rates 60 604.0 Hydraulic Performance 60 604.1 Trayed Column 60 604.2 Packed Column 61 605.0 Efficiency Performance 61 605.1 Trayed Column 62 605.2 Packed Column 69 700.0 INTERPRETATION OF RESULTS 76 701.0 Sources of Experimental Error 76 701.1 Material and Enthalpy Balances 77 702.0 Effects of Experimental Error 78 703.0 Design versus Performance 78 703.1 Mechanical/Tower Equipment 78 703.2 Process Conditions 78 704.0 Hydraulic Performance 79 704.1 Mechanical/Tower Equipment 79 704.2 Tray 79 704.3 Packing 80 704.4 Process Conditions 80 705.0 Mass Transfer Performance 81 705.1 Mechanical/Tower Equipment 81 705.2 Tray 81 705.3 Packing 82 705.4 Maldistribution 82 705.5 Process 84 706.0 Test Troubleshooting 85 706.1 Analysis Procedure 85 706.2 Sampling 85 706.3 Equilibrium Data 85 706.4 Temperature Measurements 85 706.5 Heat and Material Balances 86 706.6 Fluctuation of Process Conditions 86 706.7 Pressure Drop Measurements 86 706.8 Incorrect Prediction of Pressure Drop 86 706.9 Errors in Assumptions in Modeling Mass Transfer 86 706.10 Multicomponent Systems Deviate from Binary Data 87 706.11 High Purity Separation 87 706.12 Test and Design Conditions 87 800.0 APPENDIX 88 801.0 Notation 88 801.1 Greek Symbols 90 802.0 Sample Calculations 90 802.1 General Analysis of Test Data 90 802.2 Packed Column 91 802.3 Trayed Column 107 803.0 References 126.
title_sub a guide to performance evaluation /
title_full AIChE equipment testing procedure. Trayed & packed columns : a guide to performance evaluation / Equipment Testing Procedures Committee of the American Institute of Chemical Engineers.
title_fullStr AIChE equipment testing procedure. Trayed & packed columns : a guide to performance evaluation / Equipment Testing Procedures Committee of the American Institute of Chemical Engineers.
title_full_unstemmed AIChE equipment testing procedure. Trayed & packed columns : a guide to performance evaluation / Equipment Testing Procedures Committee of the American Institute of Chemical Engineers.
title_auth AIChE equipment testing procedure. a guide to performance evaluation /
title_alt Trayed & packed columns
Trayed and packed columns
title_new AIChE equipment testing procedure.
title_sort aiche equipment testing procedure. trayed & packed columns : a guide to performance evaluation /
publisher Wiley-AIChE,
publishDate 2014
physical 1 online resource (152 pages) : illustrations
edition Third edition.
contents Machine generated contents note: 100.0 PURPOSE & SCOPE 1 101.0 Purpose 1 102.0 Scope 1 200.0 DEFINITION AND DESCRIPTION OF TERMS 2 201.0 Flow Quantities 2 202.0 Key Components 3 203.0 Mass Transfer Efficiency 4 203.1 Theoretical Trays or Plates or Stages 4 203.2 Overall Column Efficiency 4 203.3 Apparent Murphree Tray Efficiency 4 203.4 Ideal Murphree Tray Efficiency 4 203.5 Murphree Point Efficiency 4 203.6 HETP 4 203.7 HTU 4 203.8 NTU 4 204.0 Operating Lines 5 205.0 Pinch 5 206.0 Maximum Throughput 5 206.1 Maximum Hydraulic Throughput 5 206.2 Maximum Operational Capacity 5 206.3 Maximum Efficient Capacity 5 207.0 Minimum Operating Rate 5 208.0 Operating Section 5 209.0 Hardware 6 209.1 Components of a Trayed Column 6 209.2 Components of a Packed Column 7 300.0 TEST PLANNING 9 301.0 Preliminary Preparation 9 301.1 Safety 10 301.2 Environmental Considerations 10 301.3 Test Objectives 10 301.4 Organizational Resources 10 301.5 Schedule 10 301.6 Review of Historic Operating Data 10 302.0 Column Control and Instrumentation 11 303.0 Peripheral Equipment 11 304.0 Pre-test Calculations 11 304.1 Process Simulation 11 304.2 Dry Run 11 305.0 Types of Tests 12 305.1 Performance Tests 12 305.2 Acceptance Tests 12 306.0 Specific Areas of Interest 12 306.1 Packing Efficiencies 12 306.2 Tray Efficiencies 12 306.3 Overall Column Efficiency 13 306.4 Capacity Limitations 13 307.0 Energy Consumption 14 308.0 Pressure Drop Restrictions 15 309.0 Data Collection Requirements 15 309.1 Process Operating Data 15 309.2 Gamma Scan Data 15 310.0 Conditions of External Streams 18 310.1 Overall and Component Material Balances 18 310.2 Overall Enthalpy Balances 18 311.0 Internal Temperatures 18 311.1 Heat Balances 18 311.2 Internal Profiles 18 312.0 Internal Samples 20 312.1 Internal Samples for Efficiency Checks 20 312.2 Internal Samples for Overall Performance 20 313.0 Pressure Profiles 20 314.0 Data Requirements-Physical Properties 20 314.1 Test Mixtures 20 314.2 Essential Data 21 315.0 Auxiliary Data 21 316.0 Test Procedure Documentation 21 400.0 METHODS OF MEASUREMENT AND SAMPLING 22 401.0 System Controls and Operating Stability 22 402.0 Measurement of Temperatures 22 402.1 Accuracy 22 402.2 Errors 22 403.0 Measurement of Flow Rates 24 403.1 Orifice Meters 24 403.2 Rotameters 25 403.3 Vortex Flow Meters 25 403.4 Coriolis Flow Meters 25 403.5 Magnetic Flow Meters 25 403.6 Pitot Tube (or Annubar) 25 403.7 Direct Volume or Weight Measurement 26 404.0 Measurement of Column Pressure Drop 26 404.1 Instrument 26 404.2 Pressure Taps 26 404.3 Seal Pots 33 404.4 Leakage Check 33 404.5 Accuracy 33 405.0 Sampling Procedure 34 405.1 General 34 405.2 Selection of Sampling Points 34 405.3 Sample Connections 35 405.4 Containers 35 405.5 Sampling of High Boiling Materials 36 405.6 Sampling of Intermediate Boiling Materials 37 405.7 Sampling of Materials Having Boiling Points Below -50°F (-46°C) 40 405.8 Leakage Check 41 405.9 Labeling and Handling the Samples 41 500.0 TEST PROCEDURE 43 501.0 Preliminary 43 502.0 Test Procedure for Maximum Hydraulic Throughput 43 502.1 Flood Symptoms 44 502.2 Performing Capacity Tests 45 502.3 Optional Test Technique - Gamma Scanning 48 503.0 Considerations Affecting Efficiency Test Procedure 48 503.1 Rigorous Versus Shortcut Efficiency Tests 48 503.2 Strategy of Efficiency Testing 49 503.3 Early Preparation for Efficiency Tests 50 503.4 Last-minute Preparations for Efficiency Tests 53 503.5 Establishment of Steady State Conditions 55 503.6 The Test Day 56 503.7 Concluding Test 56 600.0 COMPUTATION OF RESULTS 601.0 Verification of Test Data and Simulation Models 58 602.0 Material Balance 59 602.1 End Effects 59 603.0 Enthalpy Balance 59 603.1 Overall Balance 59 603.2 Internal Flow Rates 60 604.0 Hydraulic Performance 60 604.1 Trayed Column 60 604.2 Packed Column 61 605.0 Efficiency Performance 61 605.1 Trayed Column 62 605.2 Packed Column 69 700.0 INTERPRETATION OF RESULTS 76 701.0 Sources of Experimental Error 76 701.1 Material and Enthalpy Balances 77 702.0 Effects of Experimental Error 78 703.0 Design versus Performance 78 703.1 Mechanical/Tower Equipment 78 703.2 Process Conditions 78 704.0 Hydraulic Performance 79 704.1 Mechanical/Tower Equipment 79 704.2 Tray 79 704.3 Packing 80 704.4 Process Conditions 80 705.0 Mass Transfer Performance 81 705.1 Mechanical/Tower Equipment 81 705.2 Tray 81 705.3 Packing 82 705.4 Maldistribution 82 705.5 Process 84 706.0 Test Troubleshooting 85 706.1 Analysis Procedure 85 706.2 Sampling 85 706.3 Equilibrium Data 85 706.4 Temperature Measurements 85 706.5 Heat and Material Balances 86 706.6 Fluctuation of Process Conditions 86 706.7 Pressure Drop Measurements 86 706.8 Incorrect Prediction of Pressure Drop 86 706.9 Errors in Assumptions in Modeling Mass Transfer 86 706.10 Multicomponent Systems Deviate from Binary Data 87 706.11 High Purity Separation 87 706.12 Test and Design Conditions 87 800.0 APPENDIX 88 801.0 Notation 88 801.1 Greek Symbols 90 802.0 Sample Calculations 90 802.1 General Analysis of Test Data 90 802.2 Packed Column 91 802.3 Trayed Column 107 803.0 References 126.
isbn 9781118860540
9781118627716
callnumber-first T - Technology
callnumber-subject TP - Chemical Technology
callnumber-label TP159
callnumber-sort TP 3159 D9 A44 42014
genre Electronic books.
genre_facet Electronic books.
url https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=1629182
illustrated Illustrated
dewey-hundreds 600 - Technology
dewey-tens 620 - Engineering
dewey-ones 620 - Engineering & allied operations
dewey-full 620.1/12
dewey-sort 3620.1 212
dewey-raw 620.1/12
dewey-search 620.1/12
oclc_num 870586901
work_keys_str_mv AT americaninstituteofchemicalengineersequipmenttestingprocedurescommittee aicheequipmenttestingprocedureaguidetoperformanceevaluation
AT americaninstituteofchemicalengineersequipmenttestingprocedurescommittee trayedpackedcolumns
AT americaninstituteofchemicalengineersequipmenttestingprocedurescommittee trayedandpackedcolumns
status_str n
ids_txt_mv (MiAaPQ)5001629182
(Au-PeEL)EBL1629182
(CaPaEBR)ebr10837589
(CaONFJC)MIL573962
(OCoLC)870586901
title_part_txt Trayed & packed columns :
is_hierarchy_title AIChE equipment testing procedure. a guide to performance evaluation /
author2_original_writing_str_mv noLinkedField
_version_ 1792330768390815744
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>07360nam a2200481 i 4500</leader><controlfield tag="001">5001629182</controlfield><controlfield tag="003">MiAaPQ</controlfield><controlfield tag="005">20200520144314.0</controlfield><controlfield tag="006">m o d | </controlfield><controlfield tag="007">cr cnu||||||||</controlfield><controlfield tag="008">140115t20142014njua ob 001 0 eng|d</controlfield><datafield tag="020" ind1=" " ind2=" "><subfield code="z">9781118627716 (pbk.)</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9781118860540</subfield><subfield code="q">(electronic bk.)</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(MiAaPQ)5001629182</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(Au-PeEL)EBL1629182</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(CaPaEBR)ebr10837589</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(CaONFJC)MIL573962</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)870586901</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">MiAaPQ</subfield><subfield code="b">eng</subfield><subfield code="e">rda</subfield><subfield code="e">pn</subfield><subfield code="c">MiAaPQ</subfield><subfield code="d">MiAaPQ</subfield></datafield><datafield tag="050" ind1=" " ind2="4"><subfield code="a">TP159.D9</subfield><subfield code="b">A44 2014</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">620.1/12</subfield><subfield code="2">23</subfield></datafield><datafield tag="245" ind1="0" ind2="0"><subfield code="a">AIChE equipment testing procedure.</subfield><subfield code="p">Trayed &amp; packed columns :</subfield><subfield code="b">a guide to performance evaluation /</subfield><subfield code="c">Equipment Testing Procedures Committee of the American Institute of Chemical Engineers.</subfield></datafield><datafield tag="246" ind1="3" ind2="0"><subfield code="a">Trayed &amp; packed columns</subfield></datafield><datafield tag="246" ind1="3" ind2=" "><subfield code="a">Trayed and packed columns</subfield></datafield><datafield tag="250" ind1=" " ind2=" "><subfield code="a">Third edition.</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Hoboken :</subfield><subfield code="b">Wiley-AIChE,</subfield><subfield code="c">[2014]</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">2014</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 online resource (152 pages) :</subfield><subfield code="b">illustrations</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">text</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">computer</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">online resource</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="504" ind1=" " ind2=" "><subfield code="a">Includes bibliographical references and index.</subfield></datafield><datafield tag="505" ind1="8" ind2=" "><subfield code="a">Machine generated contents note: 100.0 PURPOSE &amp; SCOPE 1 101.0 Purpose 1 102.0 Scope 1 200.0 DEFINITION AND DESCRIPTION OF TERMS 2 201.0 Flow Quantities 2 202.0 Key Components 3 203.0 Mass Transfer Efficiency 4 203.1 Theoretical Trays or Plates or Stages 4 203.2 Overall Column Efficiency 4 203.3 Apparent Murphree Tray Efficiency 4 203.4 Ideal Murphree Tray Efficiency 4 203.5 Murphree Point Efficiency 4 203.6 HETP 4 203.7 HTU 4 203.8 NTU 4 204.0 Operating Lines 5 205.0 Pinch 5 206.0 Maximum Throughput 5 206.1 Maximum Hydraulic Throughput 5 206.2 Maximum Operational Capacity 5 206.3 Maximum Efficient Capacity 5 207.0 Minimum Operating Rate 5 208.0 Operating Section 5 209.0 Hardware 6 209.1 Components of a Trayed Column 6 209.2 Components of a Packed Column 7 300.0 TEST PLANNING 9 301.0 Preliminary Preparation 9 301.1 Safety 10 301.2 Environmental Considerations 10 301.3 Test Objectives 10 301.4 Organizational Resources 10 301.5 Schedule 10 301.6 Review of Historic Operating Data 10 302.0 Column Control and Instrumentation 11 303.0 Peripheral Equipment 11 304.0 Pre-test Calculations 11 304.1 Process Simulation 11 304.2 Dry Run 11 305.0 Types of Tests 12 305.1 Performance Tests 12 305.2 Acceptance Tests 12 306.0 Specific Areas of Interest 12 306.1 Packing Efficiencies 12 306.2 Tray Efficiencies 12 306.3 Overall Column Efficiency 13 306.4 Capacity Limitations 13 307.0 Energy Consumption 14 308.0 Pressure Drop Restrictions 15 309.0 Data Collection Requirements 15 309.1 Process Operating Data 15 309.2 Gamma Scan Data 15 310.0 Conditions of External Streams 18 310.1 Overall and Component Material Balances 18 310.2 Overall Enthalpy Balances 18 311.0 Internal Temperatures 18 311.1 Heat Balances 18 311.2 Internal Profiles 18 312.0 Internal Samples 20 312.1 Internal Samples for Efficiency Checks 20 312.2 Internal Samples for Overall Performance 20 313.0 Pressure Profiles 20 314.0 Data Requirements-Physical Properties 20 314.1 Test Mixtures 20 314.2 Essential Data 21 315.0 Auxiliary Data 21 316.0 Test Procedure Documentation 21 400.0 METHODS OF MEASUREMENT AND SAMPLING 22 401.0 System Controls and Operating Stability 22 402.0 Measurement of Temperatures 22 402.1 Accuracy 22 402.2 Errors 22 403.0 Measurement of Flow Rates 24 403.1 Orifice Meters 24 403.2 Rotameters 25 403.3 Vortex Flow Meters 25 403.4 Coriolis Flow Meters 25 403.5 Magnetic Flow Meters 25 403.6 Pitot Tube (or Annubar) 25 403.7 Direct Volume or Weight Measurement 26 404.0 Measurement of Column Pressure Drop 26 404.1 Instrument 26 404.2 Pressure Taps 26 404.3 Seal Pots 33 404.4 Leakage Check 33 404.5 Accuracy 33 405.0 Sampling Procedure 34 405.1 General 34 405.2 Selection of Sampling Points 34 405.3 Sample Connections 35 405.4 Containers 35 405.5 Sampling of High Boiling Materials 36 405.6 Sampling of Intermediate Boiling Materials 37 405.7 Sampling of Materials Having Boiling Points Below -50&amp;deg;F (-46&amp;deg;C) 40 405.8 Leakage Check 41 405.9 Labeling and Handling the Samples 41 500.0 TEST PROCEDURE 43 501.0 Preliminary 43 502.0 Test Procedure for Maximum Hydraulic Throughput 43 502.1 Flood Symptoms 44 502.2 Performing Capacity Tests 45 502.3 Optional Test Technique - Gamma Scanning 48 503.0 Considerations Affecting Efficiency Test Procedure 48 503.1 Rigorous Versus Shortcut Efficiency Tests 48 503.2 Strategy of Efficiency Testing 49 503.3 Early Preparation for Efficiency Tests 50 503.4 Last-minute Preparations for Efficiency Tests 53 503.5 Establishment of Steady State Conditions 55 503.6 The Test Day 56 503.7 Concluding Test 56 600.0 COMPUTATION OF RESULTS 601.0 Verification of Test Data and Simulation Models 58 602.0 Material Balance 59 602.1 End Effects 59 603.0 Enthalpy Balance 59 603.1 Overall Balance 59 603.2 Internal Flow Rates 60 604.0 Hydraulic Performance 60 604.1 Trayed Column 60 604.2 Packed Column 61 605.0 Efficiency Performance 61 605.1 Trayed Column 62 605.2 Packed Column 69 700.0 INTERPRETATION OF RESULTS 76 701.0 Sources of Experimental Error 76 701.1 Material and Enthalpy Balances 77 702.0 Effects of Experimental Error 78 703.0 Design versus Performance 78 703.1 Mechanical/Tower Equipment 78 703.2 Process Conditions 78 704.0 Hydraulic Performance 79 704.1 Mechanical/Tower Equipment 79 704.2 Tray 79 704.3 Packing 80 704.4 Process Conditions 80 705.0 Mass Transfer Performance 81 705.1 Mechanical/Tower Equipment 81 705.2 Tray 81 705.3 Packing 82 705.4 Maldistribution 82 705.5 Process 84 706.0 Test Troubleshooting 85 706.1 Analysis Procedure 85 706.2 Sampling 85 706.3 Equilibrium Data 85 706.4 Temperature Measurements 85 706.5 Heat and Material Balances 86 706.6 Fluctuation of Process Conditions 86 706.7 Pressure Drop Measurements 86 706.8 Incorrect Prediction of Pressure Drop 86 706.9 Errors in Assumptions in Modeling Mass Transfer 86 706.10 Multicomponent Systems Deviate from Binary Data 87 706.11 High Purity Separation 87 706.12 Test and Design Conditions 87 800.0 APPENDIX 88 801.0 Notation 88 801.1 Greek Symbols 90 802.0 Sample Calculations 90 802.1 General Analysis of Test Data 90 802.2 Packed Column 91 802.3 Trayed Column 107 803.0 References 126.</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">"Provides a cost-effective and reliable reference for improving the performance of new and existing process equipment Step-by-step procedures are flexible enough to be applied in a number of industrial applications "--</subfield><subfield code="c">Provided by publisher.</subfield></datafield><datafield tag="588" ind1=" " ind2=" "><subfield code="a">Description based on print version record.</subfield></datafield><datafield tag="590" ind1=" " ind2=" "><subfield code="a">Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Plate towers</subfield><subfield code="x">Evaluation.</subfield></datafield><datafield tag="650" ind1=" " ind2="0"><subfield code="a">Plate towers</subfield><subfield code="x">Testing.</subfield></datafield><datafield tag="655" ind1=" " ind2="4"><subfield code="a">Electronic books.</subfield></datafield><datafield tag="710" ind1="2" ind2=" "><subfield code="a">American Institute of Chemical Engineers.</subfield><subfield code="b">Equipment Testing Procedures Committee.</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Print version:</subfield><subfield code="t">AIChE equipment testing procedure. Trayed &amp; packed columns : a guide to performance evaluation.</subfield><subfield code="d">Hoboken : Wiley-AIChE, [2014]</subfield><subfield code="z">9781118627716</subfield><subfield code="w">(DLC) 2013042725</subfield></datafield><datafield tag="797" ind1="2" ind2=" "><subfield code="a">ProQuest (Firm)</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=1629182</subfield><subfield code="z">Click to View</subfield></datafield></record></collection>