Control system migrations : : a practical project management handbook / / Daniel Roessler.

Reliable and effective control systems are a critical component of safe and profitable operations across process industries. And many of our industrial facilities today continue to operate using legacy control systems from the past four decades that are at or near the end of their lifecycles. Migrat...

Full description

Saved in:
Bibliographic Details
VerfasserIn:
Place / Publishing House:New York [New York] (222 East 46th Street, New York, NY 10017) : : Momentum Press,, 2013.
Year of Publication:2013
Language:English
Online Access:
Physical Description:1 online resource (xxiv, 192 pages) :; illustrations
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 05911nam a2200853 i 4500
001 5001366264
003 MiAaPQ
005 20200520144314.0
006 m o d |
007 cr cnu||||||||
008 130928s2013 nyua foab 001 0 eng d
020 |z 9781606504437 (print) 
020 |z 1606504436 (print) 
020 |a 9781606504451  |q (electronic bk.) 
020 |a 1606504452  |q (electronic bk.) 
024 7 |z 10.5643/9781606504452  |2 doi 
035 |a (MiAaPQ)5001366264 
035 |a (Au-PeEL)EBL1366264 
035 |a (CaPaEBR)ebr10767925 
035 |a (CaONFJC)MIL514181 
035 |a (OCoLC)859338196 
040 |a MiAaPQ  |b eng  |e rda  |e pn  |c MiAaPQ  |d MiAaPQ 
050 4 |a TJ213  |b .R643 2013 
082 0 |a 629.8  |2 23 
100 1 |a Roessler, Daniel.,  |e author. 
245 1 0 |a Control system migrations :  |b a practical project management handbook /  |c Daniel Roessler. 
264 1 |a New York [New York] (222 East 46th Street, New York, NY 10017) :  |b Momentum Press,  |c 2013. 
300 |a 1 online resource (xxiv, 192 pages) :  |b illustrations 
336 |a text  |2 rdacontent 
337 |a computer  |2 rdamedia 
338 |a online resource  |2 rdacarrier 
504 |a Includes bibliographical references (pages 187-188) and index. 
505 0 |a List of tables and figures -- Acknowledgments -- Foreword -- Preface -- About the author --  
505 8 |a 1. Migration project justification -- Determining your approach -- Defining ROI -- System failures -- Parts availability or obsolescence issues -- Difficulty integrating with newer applications and systems -- Reduced availability of support services -- Operational inefficiency -- Summary --  
505 8 |a 2. A comprehensive FEL -- Selecting your FEL resources -- Identifying key engineering deliverables -- Deliverable descriptions and content -- Important FEL decisions -- Summary --  
505 8 |a 3. Bid specifications and vendor selection -- Control system -- The control system functional specification -- Hardware and software requirements specifications -- Control system bid instructions -- Decision criteria matrix -- Selecting a control system vendor -- Engineering, procurement, and construction services -- Requirements definition -- A complete EPC bid request package -- Bid evaluation and project award -- Summary --  
505 8 |a 4. Scope, schedule, and budget scope -- Overall organization and approach -- Instrumentation -- Electrical -- Controls -- Civil-mechanical-building -- Communications and integration -- Testing -- Training and documentation -- Cutover -- Budget -- Schedule -- Summary --  
505 8 |a 5. Project staffing -- Defining project resource requirements -- Project organizational chart -- Roles and responsibilities matrix -- Project schedule resourcing -- Extending the project team -- Establishing team communication -- Building an effective team -- Summary --  
505 8 |a 6. Training -- Engineering -- Maintenance -- Operations -- Others -- Summary --  
505 8 |a 7. Progress monitoring, change orders, and reporting monitoring -- Scope monitoring -- Schedule tracking -- Budget evaluation -- Overall progress calculations -- Adjusting plans -- Change order management -- Project reporting -- Summary --  
505 8 |a 8. High-risk areas -- Graphics -- Third-party systems or application communications -- Staffing changes -- Poor teamwork -- Unforeseen logic complexity -- Field construction obstacles -- Cutover details -- Summary --  
505 8 |a 9. Cutovers -- Correct methodology decision -- Thorough design details -- Comprehensive plan -- Prepared field team -- Control room leadership -- Strong operations coordination -- Complete loop packages -- Efficient checkout process -- Summary --  
505 8 |a 10. Project closeout and lifecycle management -- Documented completion scope -- Phased financial closing -- Remaining milestones schedule -- Project delivery and acceptance -- Final project review meeting -- Lifecycle management -- Summary --  
505 8 |a Supplemental resource list -- Index. 
506 |a Restricted to libraries which purchase an unrestricted PDF download via an IP. 
520 3 |a Reliable and effective control systems are a critical component of safe and profitable operations across process industries. And many of our industrial facilities today continue to operate using legacy control systems from the past four decades that are at or near the end of their lifecycles. Migration projects to modern control systems are complex, requiring detailed upfront planning, a methodical implementation strategy and astute project management. 
588 |a Title from PDF title page (viewed on September 28, 2013). 
590 |a Electronic reproduction. Ann Arbor, MI : ProQuest, 2015. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries. 
650 0 |a Automatic control. 
650 0 |a Systems migration. 
653 |a Control System Migration 
653 |a DCS Migration 
653 |a Control Room Modernization 
653 |a SCADA Upgrade 
653 |a Cutover 
653 |a Front End Loading 
653 |a DCS System 
653 |a Control System Projects 
653 |a Project Management Methodologies 
653 |a Project Management Tools and Techniques 
653 |a Project Management Process 
653 |a Project Management Books 
653 |a Project Management Best Practices 
653 |a Project Management Resources 
653 |a Control System 
653 |a Control System Design 
653 |a Control Systems Engineering 
653 |a Distributed Control System 
653 |a Process Control Systems 
653 |a Control System Upgrades 
655 4 |a Electronic books. 
776 0 8 |i Print version:  |z 1606504436  |z 9781606504437 
797 2 |a ProQuest (Firm) 
856 4 0 |u https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=1366264  |z Click to View