Made to serve : how manufacturers can compete through servitization and product service systems / / Tim Baines and Howard Lightfoot.

Saved in:
Bibliographic Details
:
TeilnehmendeR:
Year of Publication:2013
Language:English
Online Access:
Physical Description:xvi, 254 p. :; ill.
Notes:Includes index.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01469nam a2200397Ia 4500
001 5001169442
003 MiAaPQ
005 20200520144314.0
006 m o d |
007 cr cn|||||||||
008 130114s2013 enka s 001 0 eng d
010 |z  2012049218 
020 |z 9781118585313 (cloth) 
020 |a 9781118585276 (electronic bk.) 
020 |a 9781118585283 (electronic bk.) 
020 |a 9781118585290 (electronic bk.) 
035 |a (MiAaPQ)5001169442 
035 |a (Au-PeEL)EBL1169442 
035 |a (CaPaEBR)ebr10687071 
035 |a (CaONFJC)MIL478826 
035 |a (OCoLC)841914429 
040 |a MiAaPQ  |c MiAaPQ  |d MiAaPQ 
050 4 |a HD9720.5  |b .B35 2013 
082 0 4 |a 658.8/12  |2 23 
100 1 |a Baines, Tim,  |d 1962- 
245 1 0 |a Made to serve  |h [electronic resource] :  |b how manufacturers can compete through servitization and product service systems /  |c Tim Baines and Howard Lightfoot. 
260 |a Chichester, West Sussex :  |b Wiley,  |c c2013. 
300 |a xvi, 254 p. :  |b ill. 
500 |a Includes index. 
533 |a Electronic reproduction. Ann Arbor, MI : ProQuest, 2016. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries. 
650 0 |a Manufacturing industries. 
650 0 |a Warranty. 
655 4 |a Electronic books. 
700 1 |a Lightfoot, Howard,  |d 1947- 
710 2 |a ProQuest (Firm) 
856 4 0 |u https://ebookcentral.proquest.com/lib/oeawat/detail.action?docID=1169442  |z Click to View